Project ID: 2026-IFB-LM-0000
Title: Glenarm Battery Energy Storage System Construction
Addenda: 3
Release Date: 3/16/2026
Due Date: 5/28/2026
Pasadena Water and Power ("PWP"), a department of the City of Pasadena ("City"), is inviting bids for the construction of a 25 Megawatt ("MW") utility-scale lithium iron phosphate Battery Energy Storage System (“BESS”) with a minimum storage capability of four (4) hours to be constructed at PWP's Glenarm Power Plant location. Construction of the BESS Project must adhere to all applicable local, state, and federal regulations and protocols.
This contract covers construction-only services, as the complete design and engineering documents have already been finalized and are included in this bid package. The selected contractor will be responsible for construction, equipment installation, wiring, termination and testing of their scope of work to deliver a fully operational BESS facility compliant within the contract.

With GovernmentContracts, you can:
...and distribution system includes three separate and distinct water supply and distribution systems... ...
Mission Springs Water District
Bid Due: 6/12/2026
...26, Well 26 PFAS Water Treatment Plant, and distribution system. To view the ...
Orange County Water District
Bid Due: 6/08/2026
...26, Well 26 PFAS Water Treatment Plant, and distribution system. To view the ...
Orange County Water District
Bid Due: 6/08/2026
...Valley Power Distribution System 2026 (RFP-25-018) The Orange County Water District ("OCWD" or ...
Orange County Water District
Bid Due: 7/07/2026