| Location: | California |
|---|---|
| Posted: | Apr 30, 2026 |
| Due: | May 28, 2026 |
| Agency: | City of Pasadena |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-IFB-LM-0000 |
| Publication URL: | To access bid details, please log in. |
Project ID: 2026-IFB-LM-0000
Title: Glenarm Battery Energy Storage System Construction
Addenda: 3
Release Date: 3/16/2026
Due Date: 5/28/2026
Pasadena Water and Power ("PWP"), a department of the City of Pasadena ("City"), is inviting bids for the construction of a 25 Megawatt ("MW") utility-scale lithium iron phosphate Battery Energy Storage System (“BESS”) with a minimum storage capability of four (4) hours to be constructed at PWP's Glenarm Power Plant location. Construction of the BESS Project must adhere to all applicable local, state, and federal regulations and protocols.
This contract covers construction-only services, as the complete design and engineering documents have already been finalized and are included in this bid package. The selected contractor will be responsible for construction, equipment installation, wiring, termination and testing of their scope of work to deliver a fully operational BESS facility compliant within the contract.

With GovernmentContracts, you can:
...Project ID: RFP-DS-0149 Title: Torrance Refinery Water Recycling Plant Programmable Logic... Water Recycling ...
West Basin Municipal Water District
Bid Due: 11/05/2026
...Basic Information Title C26863016 HEARST SAN SIMEON SHM - Reservoir #3 Water Treatment ...
State Government of California
Bid Due: 10/23/2026
...to submit bids for construction of the Capital Improvement Project (CIP) 2528 - ...
City of Los Angeles
Bid Due: 10/30/2026
...) CHIEF PLANT OPERATOR, WATER TREATMENT & WATER DISTRIBUTION SERVICES 1. INTRODUCTION The ...
City of Lemoore
Bid Due: 10/29/2026