| Location: | Connecticut |
|---|---|
| Posted: | Aug 31, 2026 |
| Due: | Oct 2, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 18931949 |
| Publication URL: | To access bid details, please log in. |
Mystic & Noank Library Park Project
The Mystic & Noank Library Landscape Master Plan Phase 1 work consists of: Installation and maintenance of construction entrance and erosion and sediment controls, clearing and grubbing, selective demolition, site lighting; underground conduits and sleeves, catch basin top, area drain & stormwater piping; asphalt paving; precast concrete curbing; exposed aggregate concrete sidewalks; concrete stairs, stone stairs on concrete; dry laid stone walls; metal handrails; native tree; shrub and perennial plantings; as shown and described in the contract documents.
Christine Bradley 40 Library St Mystic CT, 06355 United States Tel: 8605367721 Fax: cbradley@mysticnoanklibrary.org

With GovernmentContracts, you can:
...for women's hockey locker room. Work includes selective demolition, site work, fencing, helical ...
State Government of Connecticut
Bid Due: 11/12/2026
...Installation, Mansfield Hollow Dam, Mansfield Center, CT. THE WORK CONSISTS OF: The Contractor ...
DEPT OF DEFENSE
Bid Due: 11/05/2026
...contractors for performing work associated with the replacement of an existing pavilion structure... ...
State Government of Connecticut
Bid Due: 11/10/2026
...systems. Work includes but is not necessarily limited to the installation of subgrade ...
State Government of Connecticut
Bid Due: 11/06/2026