Attachment Preview

BID ADDENDUM NO. 3
PROJECT:
BID REFERENCE NO:
LABELLA PROJECT NO:
DATE:
FROM:
Utica City School District
2026-2027 Capital Outlay Project
JFK MS Exterior Door Replacement
UCSD-RFP# 601
P2601080
10/23/2026
LaBella Associates, D.P.C.
316 S. Clinton Street, 2nd Floor
Syracuse NY, 13202
GENERAL
A.
All Bidders and Contractors shall take note of the following changes, additions, interpretations,
clarifications, etc., in connection with the Drawings and Specifications and other Contract Documents.
The following instructions have precedence over anything contrarily shown on the drawings or
described in the Specification Documents.
B.
Bidders shall carefully examine all items and determine for themselves what Subcontractors are
affected, and notify all Bidders on subcontracts of changes, explanations, interpretations, or additions
affecting their work.
C.
Work described in this Addendum shall be in accordance with Specifications for like items in
remainder of building and complete with all labor and materials required.
D.
The directions, instructions and information contained in this Addendum shall be incorporated into
the Bidding Documents and shall be taken into consideration and be included in the Contractors'
bids.
E.
Bidders shall acknowledge receipt of this Addendum by inserting its number and date in the space
designated in the Bid Form. Failure to do so will be considered an informality and may be cause for
disqualification of the bid.
F.
Include this Addendum as part of the Contract Documents. It supplements portions of the original
specifications/project manual and drawings, the extent of which shall remain, except as revised
herein:
G.
This Addendum consists of 03 pages and the following attachments:
This Addendum contains this document.
Bid Addendum 03_20261023.docx
1
Print: 10/23/2026 11:50:36 AM
CLARIFICATIONS:
1-C-3
NOTE: ALL Prime Contractors and district vendors are responsible for any and all work associated
with their contract, noted on ALL contract documents, regardless of sheet designation, specification
division, and Addendum reference. Full sets of documents and supplemental information,
addendums, and clarifications are to be acquired by prime contractors. Prime contractors are
responsible to confirm sub-contractors and suppliers include scope accordingly with above and
certify (by submission of a bid) all scope of those providers are included in their respective pricing.
2-C-3
Each Contractor must be aware that there will be NO additional compensation to the Contractor
because of:
a. Inflation on materials that will be required for the project. Contractor must include in their
Original Bid any anticipated escalation costs in material or purchase said material at time of
award and store the materials at the Contractors expense until such time the materials can
be incorporated into the project.
b. Lead Time conflicts resulting from contractor/Subcontractor/supplier’s inability to meet
schedule and the failure to procure materials in an expedited manner. Contractor shall bare
the expenses resulting in material changes resulting from lead times impacting the agreed
project schedule. A/E review time of proposed substitutes under consideration will be
charged to the Contractor.
c. Note: To assist the contractor with the above, the Owner will pay material invoice costs for all
materials properly stored and insured. Insurance certificates for stored materials are to be
issued to the Construction Manager when billing for stored materials.
3-C-3 Budget Estimate for bonding information only:
a. G601 – General Construction – GC601
$85,000.00
4-C-3 CLARIFICATION: Intent of doors is to utilize SL17/20 with pebble skin exterior and sandstone skin
interior,
5-C-3
CLARIFICATION: Door Hardware – Please note, the district has initiated standardization on door
hardware to maintain consistency across the district. Please price hardware for the following items in
accordance with the standardization:
a. Cylinder Locks – KeyMark by Accentra (formerly Yale)
b. Locksets – ML2000 Series by Corbin Russwin
c. Exit Devices – ED5000/PED5000 Series by Corbin Russwin
d. Door Closers – DC8000 Series by Corbin Russwin
6-C-3
NOTE: DAY Automation/STARK provide security access controls and associated services as a district
vendor. DAY will be responsible for removal and reinstallation of door contacts. GC will be
responsible to coordinate and integrate any hardware related items required to accommodate the
work of DAY with DAY.
Bid Addendum 03_20261023.docx
2
Print: 10/23/2026 11:50:36 AM
7-C-3
CLARIFICATION: Armoured One is the basis of design security glazing and films for this project or
APPROVED EQUAL. As this is the last Addendum being issued prior to the 10/27 Bid Opening, and no
equivalency submissions have been submitted by a bidder, it is recommended that the Armoured
One products be included in the bids. Any other product will be considered a substitution post bid
and subject to rejection, putting your bid at risk.
8-C-3 CLARFICATION: All NEW glazing in new doors and lites are to be Type SIGU-1 per Specification
Section 088853. Any EXISTING side lites will require the installation of security film – for example
Exterior Door 3 (Alternate 1).
CHANGES TO THE SPECIFICATIONS:
1-S-3 N/A
CHANGES TO THE DRAWINGS:
1-D-3 N/A
END OF BID ADDENDUM NO. 3
Bid Addendum 03_20261023.docx
3
Print: 10/23/2026 11:50:36 AM
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

CS00058B: PMC HHM 407 Bridge Preservation Henry Hudson Bridge and HHM 408 Misc.

Metropolitan Transportation Authority

Bid Due: 11/20/2026

22 Title: Updating the Hazard Mitigation Plan CR#: 2139609 Agency: Schenectady County Issue

The New York State Contract Reporter

Bid Due: 11/04/2026

30 Title: Disc. 26022-OASAS Data Landscape Assessment and Future State Data Modeling Services

The New York State Contract Reporter

Bid Due: 10/27/2026

39 Title: MWBE & SDVOB Opportunities - Baruch College South Campus Boilers and

The New York State Contract Reporter

Bid Due: 11/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.