| Location: | Georgia |
|---|---|
| Posted: | Feb 3, 2025 |
| Due: | Mar 6, 2025 |
| Agency: | Cobb County School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | P25002 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project consists of phased renovation of existing classrooms, music-science annex, and phased construction of new classroom additions to existing buildings along with the demolition of the existing north annex building. Replacement of existing roofing. Replacement of existing drinking fountains throughout the buildings and replacement of the existing freezer. Supporting modifications to HVAC, plumbing, fire sprinklers, electrical, and low voltage systems throughout the new and existing buildings. Site modifications as needed to support the building addition.

With GovernmentContracts, you can:
...and Repair 93633 Fire Protection Equipment and Systems Including Fire Hydrants, Fire Sprinkler ...
State Government of Georgia
Bid Due: 10/09/2026
...Protection Equipment and Systems Including Fire Hydrants, Fire Sprinkler Systems, Smoke Detecto 34072..., ...
State Government of Georgia
Bid Due: 10/05/2026
...of the fire sprinkler systems located in B1 and B2 of the USNPRC, ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/24/2026
...(USDA) requires the repair and reinspection of the fire sprinkler systems located in ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/24/2026