| Location: | Georgia |
|---|---|
| Posted: | Feb 28, 2025 |
| Due: | Mar 27, 2025 |
| Agency: | Chatham County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0018-5 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project is to install a new water system in the Ogeechee Farms subdivision to provide fire protection. The project includes the installation of the generally described items:
• 15, 920 ft. of 8” PVC waterline by direct bury
• 6,985 ft. of 10” PVC waterline by direct bury
• 1,435 ft. of 12” PVC waterline by direct bury
• 1,160 ft. of 12” PVC waterline by horizontal directional drill
• 805 ft. of 10” PVC waterline by horizontal directional drill
• Installation of 34 hydrants and 38 valves of various sizes
• 3,860 ft. of 18” storm drainage line
• Associated erosion control
• Clearing, grading and site restoration
• Connection to the existing water system on US Highway 17

With GovernmentContracts, you can: