DE00415 Person County
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
HIGHWAY DIVISION 5
PROPOSAL
DATE AND TIME OF BID OPENING: July 8, 2026 AT 2:00 PM
CONTRACT ID: DE00415
WBS ELEMENT NO.: DF18405.1073012, DF18405.2073025
FEDERAL AID NO.: DF18405.1073012, DF18405.2073025
COUNTY: Person
TIP NO.: N/A
MILES: 0.116
ROUTE NO.: SR 1340 (CONCORD - CEFFO RD) AND SR 1309 (BROOKS
DAIRY RD)
LOCATION: SARGENTS CREEK ALONG SR 1340 (CONCORD - CEFFO RD)
AND LITTLE DUCK CREEK ALONG SR 1309 (BROOKS DAIRY
RD)
TYPE OF WORK: DRAINAGE
NOTICE:
ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF
GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF
NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING
BOARD FOR CONTRACTORS WHEN BIDDING ON ANY NON-FEDERAL AID PROJECT WHERE THE
BID IS $40,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE
LICENSING BOARD. BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS
REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR
CONDITIONING AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS ON
BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL
COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA FOR
LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
THIS IS A ROADWAY PROJECT. BID BOND IS NOT REQUIRED.
NAME OF BIDDER
ADDRESS OF BIDDER
DE00415 Person County
PROPOSAL FOR THE CONSTRUCTION OF
CONTRACT No. DE00415 IN PERSON COUNTY, NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION,
RALEIGH, NORTH CAROLINA
The Bidder has carefully examined the location of the proposed work to be known as Contract No. DE00415; has
carefully examined the plans and specifications, which are acknowledged to be part of the proposal, the special
provisions, the proposal, the form of contract; and thoroughly understands the stipulations, requirements and
provisions. The undersigned bidder agrees to be bound upon his execution of the bid and subsequent award to him
by the Department of Transportation in accordance with this proposal. Payment and performance bonds are not
required on this project. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and
other means of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary
to perform and complete the said contract in accordance with the 2024 Standard Specifications for Roads and
Structures by the dates(s) specified in the Project Special Provisions and in accordance with the requirements of the
Engineer, and at the unit or lump sum prices, as the case may be, for the various items given on the sheets contained
herein.
The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the
work and required labor to construct and complete Contract No. DE00415 in Person County, for the unit or lump
sum prices, as the case may be, bid by the Bidder in his bid and according to the proposal, plans, and specifications
prepared by said Department, which proposal, plans, and specifications show the details covering this project, and
hereby become a part of this contract.
The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for
Roads and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into
and made a part of this contract; that, except as herein modified, all the construction and work included in this contract
is to be done in accordance with the specifications contained in said volume, and amendments and supplements thereto,
under the direction of the Engineer.
If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer
or such other person as may be designated by the Secretary to sign for the Department of Transportation. The
conditions and provisions herein cannot be changed except over the signature of the said Contract Officer or Division
Engineer.
The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as
the basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item
or portion of the work as may be deemed necessary or expedient.
An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease
in the unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.
DE00415 Person County
TABLE OF CONTENTS
COVER SHEET
PROPOSAL SHEET
PROJECT SPECIAL PROVISIONS
BOND REQUIREMENTS - No Bonds Required...................................................................... G-1
HAUL ROADS: .......................................................................................................................... G-1
BUILD AMERICA, BUY AMERICA (BABA): ....................................................................... G-1
CONTRACT TIME AND LIQUIDATED DAMAGES: ........................................................... G-5
INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES: ....... G-6
INTERMEDIATE CONTRACT TIME NUMBER 2 AND LIQUIDATED DAMAGES: ....... G-7
INTERMEDIATE CONTRACT TIME NUMBER 3 AND LIQUIDATED DAMAGES: ......... G-
Error! Bookmark not defined.
NO MAJOR CONTRACT ITEMS:............................................................................................ G-7
SPECIALTY ITEMS: ................................................................................................................. G-8
FUEL PRICE ADJUSTMENT: .................................................................................................. G-8
SCHEDULE OF ESTIMATED COMPLETION PROGRESS: ................................................. G-9
DISADVANTAGED BUSINESS ENTERPRISE (DIVISIONS): ............................................. G-9
CERTIFICATION FOR FEDERAL-AID CONTRACTS: ...................................................... G-23
RESTRICTIONS ON ITS EQUIPMENT AND SERVICES: .................................................. G-24
USE OF UNMANNED AIRCRAFT SYSTEM (UAS): .......................................................... G-24
EQUIPMENT IDLING GUIDELINES: ................................................................................... G-24
U.S. DEPARTMENT OF TRANSPORTATION HOTLINE: ................................................. G-25
NOTE TO CONTRACTOR: .................................................................................................... G-25
ROADWAY .................................................................................................................................R-1
STANDARD SPECIAL PROVISIONS
AVAILABILITY OF FUNDS - TERMINATION OF CONTRACTS ..................................SSP-1
ERRATA..................................................................................................................................SSP-2
PLANT AND PEST QUARANTINES ...................................................................................SSP-5
TITLE VI AND NONDISCRIMINATION: ...........................................................................SSP-6
MINORITY AND FEMALE EMPLOYMENT REQUIREMENTS ....................................SSP-15
REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTR CONTRACTS .......SSP-17
ON-THE-JOB TRAINING ....................................................................................................SSP-32
MINIMUM WAGES .............................................................................................................SSP-35
UNIT PROJECT SPECIAL PROVISIONS
TRAFFIC CONTROL .............................................................................................................. TC-1
PROPOSAL ITEM SHEET
ITEM SHEET(S)
DE00415 Person County
INSTRUCTIONS TO BIDDERS
PLEASE READ ALL INSTRUCTIONS CAREFULLY
BEFORE PREPARING AND SUBMITTING YOUR BID.
All bids shall be prepared and submitted in accordance with the following requirements.
Failure to comply with any requirement may cause the bid to be considered irregular and
may be grounds for rejection of the bid.
For preparing and submitting the bid electronically, refer to Article 102-8(B) of the Standard
Specifications.
Bidders that bid electronically on Raleigh Central-Let projects will need a separate Digital
Signature from the approved electronic bidding provider for Division Contracts.
ELECTRONIC ON-LINE BID:
1. Download entire proposal from Connect NCDOT website. Download the electronic submittal
file from the approved electronic bidding provider website.
2. In accordance with Article 102-3 of the Standard Specifications, registration on the Interested
Parties List is required unless SP1 G02 Interested Parties List Not Required provision is
included in the proposal.
3. Prepare and submit the electronic submittal file using the approved electronic bidding provider
software.
4. Electronic bidding software necessary for electronic bid preparation may be downloaded from
the Bid Express website following the directions at:
https://connect.ncdot.gov/letting/Pages/Electronic-Bidding.aspx.
5. Questions should be emailed 7 calendar days prior to the bid opening to Kayla N. Cooper at
kncooper@ncdot.gov. Contact with any other NCDOT personnel concerning this project is
strictly prohibited, unless otherwise noted, and may result in bids being considered non-
responsive.
DE00415 G-1 Person County
PROJECT SPECIAL PROVISIONS
GENERAL
BOND REQUIREMENTS - No Bonds Required
(6-1-16)(Rev. 1-16-24) SPD 01-420B
The provisions of Articles 102-10 and 103-7 of the Standard Specifications are waived for this
project. No bonds required.
HAUL ROADS:
(7-16-24) 105 SP1 G04
Revise the Standard Specifications as follows:
Page 1-45, Article 105-15 RESTRICTION OF LOAD LIMITS, line 31, add the following after
second sentence of the second paragraph:
At least 30 days prior to use, the Contractor shall notify the Engineer of any public road proposed
for use as a haul road for the project.
BUILD AMERICA, BUY AMERICA (BABA):
(11-15-22)(Rev. 4-21-26) 106 SP1 G05 B
Revise the Standard Specifications as follows:
Page 1-47 and 1-48, Article 106-1 GENERAL REQUIREMENTS, lines 30-47 and 1-49, delete
and replace Article 106-1 with the following:
106-1 MATERIALS AND MANUFACTURING
(A) General Requirements
The Contractor shall furnish materials that conform to all contract requirements, are suitable
for their intended use, and are free from defects. All materials used in the work shall meet the
requirements of the contract and shall be subject to inspection, test, or rejection by the
Engineer. All materials permanently incorporated into the completed work shall be new,
unless otherwise specified in the contract or as approved by the Engineer.
The Contractor is responsible for selecting, procuring, and delivering materials of the types
and quantities necessary to perform the work and meet contract requirements. Delays in
material delivery or quality control do not relieve the Contractor of obligations for schedule
or quality.
All materials incorporated into the work shall be approved before use. Approval is based on
testing, certification, or both, as required by the contract. Department review or acceptance
does not relieve the Contractor of responsibility for material compliance. The Department
may inspect, sample, and test materials at any time before, during, or after installation.
DE00415 G-2 Person County
Materials shall be handled, stored, and protected to prevent damage, contamination, or
deterioration. Materials determined to be defective, damaged, contaminated, or otherwise not
in compliance shall be rejected and promptly removed from the project.
To facilitate inspection and testing, the Contractor shall furnish a complete statement of
origin for all materials, including certifications or samples when requested. This information
shall be submitted to the Materials and Tests Unit when required by the contract or as
directed by the Engineer, in advance of fabrication, shipment, or use to allow for appropriate
inspection.
The Contractor shall furnish Safety Data Sheets (SDS) for all paints and hazardous chemicals
proposed for use on the project, in accordance with the North Carolina Hazard
Communication Standard, 29 CFR 1910.1200 and NCGS 95-174.
The Contractor shall provide access, equipment, means and assistance for the verification and
calibration of any devices used in testing, measurement, or documentation of materials.
If the Contractor proposes to use materials from local deposits not identified in the contract,
the Contractor shall be responsible for preliminary sampling, source approval, and
production of acceptable material. Preliminary samples shall be furnished at no cost to the
Department. If requested in writing, the Department may perform sampling, with costs to be
charged to the Contractor as determined by the Engineer.
Sampling or testing by the Department does not constitute pre-approval or acceptance of
material. The Contractor remains responsible for ensuring quality and uniformity of all
materials produced or delivered, including those from local deposits. The Contractor shall
indemnify and hold harmless the Department from any claims, costs, or damages related to
the development or use of such sources, including, but not limited to, failure to meet quantity
or quality requirements.
Materials covered by Subarticles 106-1(B) and 106-1(C) shall comply with applicable
domestic content requirements, including those for iron and steel, construction materials, and
manufactured products.
(B) Domestic Material Requirements
Domestic material requirements apply to iron and steel products permanently incorporated
into any project in accordance with 23 U.S.C. 313, 23 CFR 635.410, and NCGS 136-
28.7. Construction materials and manufactured products permanently incorporated into the
work are subject to domestic-content requirements only on Federal-aid projects, in
accordance with 23 U.S.C. 313, Build America Buy America Act (IIJA 70914), 2 CFR
184, and as implemented for the Federal-aid highway program through 23 CFR Part 635.410.
All iron or steel products, construction materials, and manufactured products subject to
domestic content requirements shall be of domestic origin and meet the applicable
requirements of the contract based on the project's funding source.
Before any materials are delivered to the project, the Contractor shall submit a notarized
letter acknowledging their understanding of the domestic material requirements for the
DE00415 G-3 Person County
specific contract. This acknowledgment is a contract-level affirmation that the Contractor is
responsible for ensuring that no iron or steel product, construction material, or manufactured
product subject to domestic content requirements is permanently incorporated into the work
without the required certification. This acknowledgment does not substitute for product-level
certifications from the manufacturer or supplier. The Department reserves the right to deny or
recover payment for any material incorporated into the work without valid documentation.
For iron and steel, all manufacturing processes must occur in the United States.
For construction materials, all manufacturing processes must occur in the United States.
For manufactured products, final assembly must occur in the United States.
Before any iron or steel product, construction material, or manufactured product subject to
domestic content requirements is eligible for payment, the Contractor shall submit a
certification from the manufacturer or supplier confirming compliance with the applicable
regulations. A separate certification is required for each shipment or delivery and must
clearly identify the items covered, linked to the associated bill of lading, invoice, or packing
list.
The Contractor shall ensure that all required certifications from the manufacturer or supplier
are obtained and submitted to the Engineer prior to payment for any iron or steel product,
construction material, or manufactured product subject to domestic content requirements.
The Engineer will retain documentation in accordance with Department procedures.
Compliance with domestic material requirements is the responsibility of the Contractor,
based on certifications and documentation provided by the manufacturer or supplier.
(C) Material Category Requirements
(1) Iron and Steel Products
Items are considered iron or steel products if they consist wholly or predominantly of iron
or steel. Predominantly means the cost of iron or steel components exceeds 50% of the
total cost of all product components.
All steel and iron products that are permanently incorporated into the work shall be
produced in the United States. This includes any such item that is melted, cast, rolled,
formed, shaped, drawn, extruded, forged, fabricated, finished or otherwise processed in
the manufacture of the product. Coatings applied to iron and steel products shall also be
applied in the United States.
A minimal amount of foreign iron or steel products may be permitted provided the total
value of such foreign material, as delivered to the project, does not exceed 0.1% of the
total contract cost or $2,500, whichever is greater. Documentation establishing the value
of the foreign material shall be submitted when requested. This allowance is intended
only for incidental quantities that may arise despite good-faith compliance efforts and
may not be used to intentionally procure foreign iron or steel.
Domestically produced high-strength fasteners are required, and foreign-produced high-
strength fasteners are not permitted under any circumstance.
DE00415 G-4 Person County
Raw materials such as pig iron, processed pelletized iron ore, and reduced iron ore may
be sourced internationally; however, all manufacturing processes to produce the final
product, including coatings, must occur within the United States.
(2) Construction Materials
Construction materials shall consist of a single, listed material type permanently
incorporated into the work as defined in 2 CFR 184.3. The following are classified as
construction materials:
(a) Non-ferrous metals (such as aluminum, copper, and zinc);
(b) Plastic and polymer-based products (including polyvinylchloride, composite
building materials, and polymers used in fiber optic cables);
(c) Glass (including optical glass);
(d) Fiber optic cable (including drop cable);
(e) Optical fiber;
(f) Lumber;
(g) Engineered wood;
(h) Drywall
For construction materials, all manufacturing processes must occur in the United States.
If a construction material is combined with other materials, components, or features to
form a product with new properties or functions, it shall be classified as a manufactured
product.
Minor additions such as binding agents, dyes, or adhesives that do not materially alter the
item's properties do not affect classification.
(3) Manufactured Products
Manufactured products are articles, materials, or supplies that are made by combining one or
more materials to create a product with new or different properties, functions, or uses. This
includes items that incorporate multiple components, materials, or assemblies and cannot be
classified as a single listed construction material.
Final assembly of all manufactured products must occur in the United States. Certification
must address the product as a whole, including all incorporated components.
Items that meet the definition of construction materials or iron and steel products shall not be
reclassified as manufactured products.
(4) Materials Not Subject to Domestic Content Requirements
The following materials are not subject to domestic content requirements and do not require
certification, as identified below:
(a) Materials Excluded by Federal Statute or Regulation
The following materials are excluded from domestic content requirements under
applicable Federal law or regulation:
DE00415 G-5 Person County
(i) Cement and cementitious materials
(ii) Aggregates such as stone, sand, or gravel
(iii) Aggregate binding agents or additives
(b) Materials Not Permanently Incorporated into the Work
Materials that are not permanently incorporated into the completed project are not
subject to domestic content requirements. Materials are not permanently incorporated
when they are used solely to facilitate construction activities and do not perform an
ongoing structural, operational, or functional role after construction is complete.
Determinations regarding whether a material is permanently incorporated will be
made by the Engineer.
(D) Classification and Clarification of Materials
All items subject to domestic content requirements shall be classified as either an iron or
steel product, construction material, manufactured product, or a material not subject to
domestic content requirements based on their final form as delivered to the project site. Each
item may be classified into only one category and shall not be reclassified to avoid more
stringent requirements. Classification of a manufactured product does not relieve the
Contractor of compliance with iron and steel domestic manufacturing requirements
applicable to embedded iron or steel components when required by Federal law or regulation.
When an item's classification is uncertain or does not clearly fall within the listed categories,
the Contractor shall submit the item for review by the Engineer. Approval must be obtained
prior to procurement or incorporation into the project.
CONTRACT TIME AND LIQUIDATED DAMAGES:
(7-20-99) (Rev. 5-16-23) 108 SP1 G06
The date of availability for this contract is August 5, 2026, except that work in jurisdictional waters
and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and the
Contractor is held as stipulated in the permits contained elsewhere in this proposal. This delay in
availability has been considered in determining the contract time for this project.
The completion date for this contract is October 6, 2026.
Except where otherwise provided by the contract, observation periods required by the contract will
not be a part of the work to be completed by the completion date and/or intermediate contract times
stated in the contract. The acceptable completion of the observation periods that extend beyond
the final completion date shall be a part of the work covered by the performance and payment
bonds.
The liquidated damages for this contract are Five Hundred Dollars ($ 500.00) per calendar day.
DE00415 G-6 Person County
INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:
(2-20-07) 108 SP1 G14 B
The Contractor shall not narrow or close a lane of traffic on SR 1340 (CONCORD CEFFO RD)
and SR 1309 (BROOKS DAIRY RD), detain and /or alter the traffic flow on or during holiday
weekends, special events, or any other time when traffic is unusually heavy, including the
following schedules:
HOLIDAY AND HOLIDAY WEEKEND LANE CLOSURE RESTRICTIONS
1. For unexpected occurrence that creates unusually high traffic volumes, as directed by the
Engineer.
2. For New Year's Day, between the hours of 6:00PM December 31st and 7:00AM
January 2nd. If New Year's Day is on a Friday, Saturday, Sunday or Monday, then until
7:00AM the following Tuesday.
3. For Easter, between the hours of 6:00PM Thursday and 7:00AM Monday.
4. For Memorial Day, between the hours of 6:00PM Friday and 7:00AM Tuesday.
5. For Independence Day, between the hours of 6:00PM the day before Independence Day
and 7:00AM the day after Independence Day.
If Independence Day is on a Friday, Saturday, Sunday or Monday, then between the hours
of 6:00PM the Thursday before Independence Day and 7:00AM the Tuesday after
Independence Day.
6. For Labor Day, between the hours of 6:00PM Friday and 7:00AM Tuesday.
7. For Thanksgiving Day, between the hours of 6:00PM Tuesday and 7:00AM Monday.
8. For Christmas, between the hours of 6:00PM the Friday before the week of Christmas
Day and 7:00AM the following Tuesday after the week of Christmas Day.
Holidays and holiday weekends shall include New Year's, Easter, Memorial Day, Independence
Day, Labor Day, Thanksgiving, and Christmas. The Contractor shall schedule his work so that
lane closures are not required during these periods, unless otherwise directed by the Engineer.
The time of availability for this intermediate contract work shall be the time the Contractor begins
to install all traffic control devices for lane closures according to the time restrictions listed herein.
The completion time for this intermediate contract work shall be the time the Contractor is required
to complete the removal of all traffic control devices for lane closures according to the time
restrictions stated herein and place traffic in the existing traffic pattern.
The liquidated damages are Five Hundred Dollars ($ 500.00) per hour.

With GovernmentContracts, you can:
Bid Title: EAST WILLIAMS LOWER Substation Structural & Electric Materials Category: Utility Construction
Town of Apex
Bid Due: 8/21/2026
D6D1.SBE.008 SBE Light Duty Maintenance Crew - Various Routes - Robeson D6D1.SBE.008 -
Division of Highways
Bid Due: 8/05/2026
July 24, 2026 | Advertisements Advertisement for Bids - Avent Ferry Technology Center
North Carolina State University
Bid Due: 8/18/2026
Follow Appalachian Ranger District Office and Work Center Janitorial Services Active Contract Opportunity
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/20/2026