Bus Stop Improvement Falconbridge and Huntingridge

Location: North Carolina
Posted: Apr 28, 2026
Due: May 19, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • V - Transportation, Travel and Relocation Services
Solicitation No: 1012-26-073
Publication URL: To access bid details, please log in.
Solicitation Number: 1012-26-073
Project Title: Bus Stop Improvement Falconbridge and Huntingridge
Description: The scope of this project includes bus stop improvements, intersection enhancements, and pedestrian infrastructure within the Falconbridge Road and Huntingridge Road area in Durham County, as detailed in the bid documents below. The awarded contractor shall be responsible for providing all labor, tools, equipment, machinery, and materials necessary to complete the work in full compliance with the contract terms. The work shall consist of clearing, grading, concrete pads and sidewalks, installing amenities, traffic control, and other related items.
Opening Date: 5/19/2026 2:00 PM
Posted Date: 4/29/2026
Status: Open
Department: GOTRIANGLE
Solicitation Number
*
1012-26-073
Department
GOTRIANGLE
Status Reason
Open
Opening Date
2026-05-19T14:00:00.0000000
Posted Date
*
2026-04-28T16:59:23.0000000Z
Primary Commodity Code
Construction Services
Mandatory Conference/Site Visit
Special Instructions
Procurement Officer - Tim Heule theule@gotriangle.org
Solicitation Type
*
Select RFP IFB RFI
Owner
Tim Heule
Description
The scope of this project includes bus stop improvements, intersection enhancements, and pedestrian infrastructure within the Falconbridge Road and Huntingridge Road area in Durham County, as detailed in the bid documents below. The awarded contractor shall be responsible for providing all labor, tools, equipment, machinery, and materials necessary to complete the work in full compliance with the contract terms. The work shall consist of clearing, grading, concrete pads and sidewalks, installing amenities, traffic control, and other related items.

Attachment Preview

e
INVITATION FOR BID (IFB) No. 1012-26-073
FOR
Bus Stop Improvements Falconbridge and Huntingridge
Research Triangle Regional Public Transportation Authority dba GoTriangle (GoTriangle), as authorized
under the N.C.G.S. §160A-610, is seeking to establish a contract for the above-mentioned services.
The Invitation For Bid (IFB) document is available for download on the State of North Carolina Electronic
Vendor Portal (eVP) or on GoTriangle’s website: https://gotriangle.org/procurement.
Publish Date: April 28 , 2026
Bid Due Date &
Time:
May 19, 2026 by 2:00 pm local NC time
Delivery Location: Sealed bid envelope shall be delivered to:
GoTriangle
Attn: Tim Heule, Procurement Officer
4600 Emperor Blvd, Suite 100
Durham, NC 27703
Bid No. 1012-26-073 shall be clearly written on the outside of the envelope.
Pre-Bid Meeting: May 5, 2026 at 10:00 am local NC time
Location:
GoTriangle
4600 Emperor Blvd, Suite 100 Durham, NC 27703
Microsoft Teams https://teams.microsoft.com/meet/286423511154378?p=NiejqcQDAc8fIqbrUm
meeting: Meeting ID: 286 423 511 154 378
Passcode: hn9ER66H
Instructions for preparing and submitting a bid are provided in the Instructions to Bidders
section of this document. To be deemed responsive and responsible, bidders must submit all
items specified in Section 5. of the Instructions to Bidders.
All Inquiries regarding this solicitation shall be submitted to:
Tim Heule, Procurement Officer
Email: THeule@GoTriangle.org Office: 919-485-7559
LATE BIDS WILL NOT BE ACCEPTED.
GOTRIANGLE RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS.
IFB No. 1012-26-073, Bus Stop Improvements Falconbridge and Huntingridge
Table of Contents
BACKGROUND ........................................................................................................ 6
SPECIFICATIONS..................................................................................................... 7
1. MOBILIZATION/TRAVEL TIME............................................................................... 7
2. CONSTRUCTION SURVEYING ............................................................................. 7
3. EARTHWORK/FINE GRADING/CLEARING &GRUBBING ......................................... 7
4. EROSION CONTROL......................................................................................... 11
5. TEMPORARY TRAFFIC CONTROL ....................................................................... 14
6. PAVEMENT MARKINGS ..................................................................................... 14
7. GRASS SOD/MULCH ........................................................................................ 15
8. MILL ASPHALT PAVEMENT 1.5” DEPTH .............................................................. 17
9. ,10,11,12 ASPHALT PAYMENT ........................................................................... 17
13. 5” MONOLITHIC CONCRETE ISLAND................................................................. 18
14. CONCRETE TRANSITIONAL SECTION FOR DROP INLET ...................................... 18
15. 4” CONCRETE SIDEWALK ................................................................................. 18
16. 6” CONCRETE SIDEWALK ................................................................................. 18
17. 6” SHELTER PAD .............................................................................................. 19
18. 2‘ 6“ CURB & GUTTER ....................................................................................... 19
19. SURFACE MOUNTED CONCRETE CURB ............................................................ 20
20. CONCRETE CURB RAMPS................................................................................. 20
21. INSTALL SHELTERS, BENCHES, AND OTHER AMENITIES..................................... 20
22. INSTALL BUS STOP SECURITY LIGHTING SYSTEM............................................... 21
23. PEDESTRIAN SAFETY RAIL AND HANDRAIL ........................................................ 22
24. SIGNING.......................................................................................................... 22
25. ADJUST UTILITY BOX/VAULT .............................................................................. 23
26. ADJUST WATER METER/VALVE .......................................................................... 24
27. RELOCATE SIGNAL BOX.................................................................................... 24
28. PIPE REMOVAL................................................................................................. 24
29. PIPE COLLARS ................................................................................................. 25
30. ,31,32,33,34 RCP CLASS ................................................................................... 25
35. FLARED END SECTION ..................................................................................... 25
36. NCDOT CATCH BASIN FRAME & GRATE STD. 840.03_ ......................................... 25
37. NCDOT DROP INLET FRAME & GRATE STD. 840.16_............................................ 26
38. NCDOT FRAME W/ 2 GRATES STD. 840.29_ ........................................................ 26
39. NCDOT MANHOLE FRAME AND COVER STD. 840.54_ ......................................... 26
40. MASONRY DRAINAGE STRUCTURES.................................................................. 26
41. MASONRY DRAINAGE STRUCTURES (OVER 5-FT) ............................................... 27
42. CONVERT EXISTING TBDI TO TBJB W/MANHOLE ................................................ 27
43. ADJUST DROP INLET......................................................................................... 27
44. RIP RAP CLASS B .............................................................................................. 27
45. GEOTEXTILE FABRIC......................................................................................... 27
46. TRAFFIC SIGNAL MODIFICATION ...................................................................... 28
47. MATERIALS SAMPLING & TESTING..................................................................... 28
Page 2 of 91
IFB No. 1012-26-073, Bus Stop Improvements Falconbridge and Huntingridge
48. SHOULDER AND FILL SLOPE MATERIAL (LUMP SUM EARTHWORK) ..................... 28
49. BURNING RESTRICTIONS ................................................................................. 29
50. COORDINATION WITH UTILITY COMPANIES ...................................................... 29
51. NCDOT ERRATA ............................................................................................... 29
52. SITES REQUIRING FINAL AGREEMENTS ............................................................. 32
EXHIBIT A: DRAWINGS ............................................................................................ 34
TERMS AND CONDITIONS ....................................................................................... 35
1. Services........................................................................................................................................................................35
2. Time of Commencement and Completion ...............................................................................................................35
3. Invoicing and Compensation......................................................................................................................................35
4. Workmanship and Quality of Services/Warranties ..................................................................................................36
5. Laws and Safety Standards........................................................................................................................................37
6. Retainage .....................................................................................................................................................................38
7. Changes in the Services..............................................................................................................................................39
8. Services on GoTriangle’s Premises ...........................................................................................................................39
9. Conflict of Interest.......................................................................................................................................................40
10. Termination..................................................................................................................................................................40
11. Indemnification and Hold Harmless..........................................................................................................................41
12. Dispute Resolution......................................................................................................................................................42
13. Choice of Law / Forum................................................................................................................................................43
14. Insurance .....................................................................................................................................................................43
15. Independent Contractor .............................................................................................................................................43
16. Accuracy of Financial Statements.............................................................................................................................44
17. Non-Discrimination.....................................................................................................................................................44
18. Covenant Against Contingent Fees ...........................................................................................................................44
19. Delegation and Assignment .......................................................................................................................................44
20. Nonwaiver....................................................................................................................................................................45
21. Merger ..........................................................................................................................................................................45
22. Reference.....................................................................................................................................................................45
23. Contractor’s Personnel ..............................................................................................................................................45
24. Regulatory Compliance ..............................................................................................................................................45
25. Availability of Funds ....................................................................................................................................................45
26. Notices.........................................................................................................................................................................46
27. No Third-Party Rights..................................................................................................................................................46
28. Severability ..................................................................................................................................................................46
29. Survivorship .................................................................................................................................................................47
30. Attachments................................................................................................................................................................47
31. Separate Counterparts ...............................................................................................................................................47
32. Certification on Israel Boycott....................................................................................................................................47
33. Iran Divestment Act ....................................................................................................................................................47
34. E-Verify.........................................................................................................................................................................48
35. Debarment Policy........................................................................................................................................................48
36. Force Majeure..............................................................................................................................................................48
EXHIBIT B: FEDERAL REQUIREMENTS ...................................................................... 49
1. Incorporation of Federal Transit Administration (FTA) Terms..................................................................................49
2. Compliance with Federal Regulations ......................................................................................................................49
3. Federal Changes .........................................................................................................................................................50
4. No Government Obligation to Third Parties ..............................................................................................................50
5. Program Fraud and False or Fraudulent Statements or Related Acts ....................................................................50
6. Federal Tax Liability and Recent Felony Convictions ...............................................................................................51
7. Catalog of Federal Domestic Assistance (Assistance Listings) Identification Number........................................51
8. Assistance Listings Number for the Federal Transportation Administration .........................................................51
Page 3 of 91
IFB No. 1012-26-073, Bus Stop Improvements Falconbridge and Huntingridge
9. Government-Wide Debarment and Suspension (Non-Procurement)....................................................................51
10. Ineligible Contractors and Subcontractors ...............................................................................................................52
11. Organizational Conflicts of Interest ...........................................................................................................................52
12. Interest of Members or Delegates to Congress ........................................................................................................52
13. Lobbying.......................................................................................................................................................................52
14. Byrd Anti-Lobbying Amendment................................................................................................................................53
15. Civil Rights Requirements ..........................................................................................................................................53
16. Equal Employment Opportunity (EEO)......................................................................................................................55
17. Disadvantaged Business Enterprise..........................................................................................................................57
18. Access Requirements for Persons with Disabilities.................................................................................................57
19. Access to Services for Persons with Limited English Proficiency...........................................................................58
20. Environmental Justice.................................................................................................................................................58
21. Veterans Preference ...................................................................................................................................................58
22. Transit Employee Protective Provisions....................................................................................................................58
23. Drug and Alcohol Abuse and Testing.........................................................................................................................59
24. Full and Open Competition ........................................................................................................................................59
25. Prohibition Against Exclusionary or Discriminatory Specifications.........................................................................59
26. Geographic Preference...............................................................................................................................................59
27. Notification of Federal Participation..........................................................................................................................60
28. Buy America.................................................................................................................................................................60
29. Domestic Preferences for Procurements .................................................................................................................61
30. Procurement of Recovered Materials........................................................................................................................62
31. Recycled Products......................................................................................................................................................62
32. Prohibition on Covered Telecommunications and Video Surveillance...................................................................62
33. Contract Work Hours & Safety Standards Act..........................................................................................................63
34. Davis-Bacon Act..........................................................................................................................................................63
35. Trafficking in Persons ..................................................................................................................................................64
36. Copeland Anti-Kickback Act ......................................................................................................................................64
37. Safe Operation of Motor Vehicles..............................................................................................................................64
38. Clean Air.......................................................................................................................................................................65
39. Clean Water.................................................................................................................................................................65
40. Energy Conservation...................................................................................................................................................65
41. Environmental Protections.........................................................................................................................................65
42. Conformance with ITS National Architecture...........................................................................................................65
43. Geographic Information and Related Spatial Data...................................................................................................66
44. Real Property ...............................................................................................................................................................66
45. Fly America Requirements .........................................................................................................................................66
46. Charter Bus Requirements.........................................................................................................................................66
47. School Bus Requirements..........................................................................................................................................66
48. Access to Records and Reports.................................................................................................................................67
49. Contracts Involving Federal Privacy Act Requirements...........................................................................................68
50. Breaches and Dispute Resolution .............................................................................................................................68
51. Termination..................................................................................................................................................................69
52. Other Contract Requirements ...................................................................................................................................71
INSTRUCTIONS TO BIDDERS ................................................................................... 72
ATTACHMENTS....................................................................................................... 77
ATTACHMENT A - BIDDER’S INFORMATION FORM .................................................... 78
ATTACHMENT B - BID FORM - PROJECT COST PROPOSAL ......................................... 79
ATTACHMENT C - MINIMUM INSURANCE REQUIREMENTS ........................................ 80
ATTACHMENT D - E-VERIFY EMPLOYER COMPLIANCE STATEMENT............................ 83
ATTACHMENT E - IRAN DIVESTMENT ACT CERTIFICATION ......................................... 84
ATTACHMENT F - ISRAEL DIVESTMENT ACT CERTIFICATION...................................... 85
Page 4 of 91
IFB No. 1012-26-073, Bus Stop Improvements Falconbridge and Huntingridge
ATTACHMENT G - CERTIFICATION REGARDING CONFLICT OF INTEREST ................... 86
ATTACHMENT H - STATEMENT OF NON-COLLUSION ................................................ 87
ATTACHMENT I - STATEMENT OF JUDGMENTS .......................................................... 88
ATTACHMENT J - RESPONSIVENESS AND RESPONSIBILITY STATEMENT..................... 89
ATTACHMENT K - BIDDERS REFERENCES................................................................. 90
ATTACHMENT L - RESPONSE CHECKLIST ................................................................. 91
Page 5 of 91
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...DF00556 POC Grading, Drainage & Paving - US 501 at NC 130 - ...

Division of Highways

Bid Due: 6/17/2026

...DF00545 POC Grading, Paving & Signals - SR 1404, US 401 Bypass & ...

Division of Highways

Bid Due: 6/03/2026

...DK00485 47103.3.1-US 601 (CAROLINA AVENUE) AND NC 67 (MAIN STREET) UPGRADE INTERSECTION, GRADING...: ...

Division of Highways

Bid Due: 6/18/2026

...DN01155 (WBS 51513.3.1) POC DN01155 (WBS 51513.3.1) HN-0031 GRADING, PAVING, DRAINAGE &... PLAN ...

Division of Highways

Bid Due: 6/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.