| Location: | Arizona |
|---|---|
| Posted: | Nov 6, 2025 |
| Due: | Dec 10, 2025 |
| Agency: | City of Peoria |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | P26-0023 |
| Publication URL: | To access bid details, please log in. |
Project Description: The City of Peoria (City) is seeking an experienced design consultant to perform design and construction administration services for equipment and infrastructure improvements at the Agua Fria Booster Station (B302). The Agua Fria Booster Station is an in-line potable water booster station constructed in 2021 to deliver water to the City’s northern and western water distribution systems. The station is currently equipped with three 2,083 GPM booster pumps and has a firm pumping capacity of 6 MGD. There are also three pressure-reducing valves that can be utilized to reverse flow direction between the City’s separate water pressure zones (Zone 5W/5E to Zone 4E). The original design of the booster station considered potential future expansion and improvements to increase the pumping capacity as shown in Figure 3.

With GovernmentContracts, you can:
FY2027 Pre-Qualified Technical Registrants List Department: Public Works RFP Number: FY27PQTR Start Date:
Town of Gilbert
Bid Due: 8/03/2026
Project: Boat Dock Parts, Systems/Assemblies, Maintenance and Repair Services Ref. #: 27-023 Department:
City of Tempe
Bid Due: 8/28/2026
Project ID: 2027-001-IFB Title: Grace Neal Channel Construction Phase 3 Addenda: 0 Release
Mohave County
Bid Due: 8/05/2026
RFP # Project RFP Submittal Deadline RFQ #B-06-26-090-CO90 Housing Strategy Update August 5,
Santa Cruz County
Bid Due: 8/05/2026