City Project 2026-106, Apple Valley Additions Street and Utility Improvements Phase 2

Location: Minnesota
Posted: Feb 14, 2026
Due: Mar 10, 2026
Agency: City of Apple Valley
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
Solicitation No: 2026-106
Publication URL: To access bid details, please log in.
Bid Number: 2026-106
Bid Title: City Project 2026-106, Apple Valley Additions Street and Utility Improvements Phase 2
Category: Streets, Pathways, & Utilities
Status: Open
Description:

SECTION 00 11 13

ADVERTISEMENT FOR BIDS

Bids will be received electronically online only by the City of Apple Valley, Minnesota, through Quest CDN, until 10:00 A.M., Tuesday, March 10, 2026, at which time they will be reviewed for the furnishing of all labor, materials, and all else necessary for the following:

City Project 2026-106, Apple Valley Additions Street and Utility Improvements Phase 2

45        EA        Clear and Grub Tree

3,100    LF         Remove Sanitary Sewer

3,850    LF         Remove Watermain

2,500    LF         Remove Storm Sewer

7,400    LF         Remove Curb and Gutter

48,300  SF         Remove Concrete Walk, Driveway, and Valley Gutter

12,500  SY        Remove Bituminous Street, Driveway, and Trail Pavement

16        EA        Sanitary Sewer Structure

3,220    LF         PVC Sanitary Sewer

3,800    LF         DIP Watermain

61        EA        Sanitary Sewer and Water Service

38        EA        Storm Sewer Structure

2,860    LF         RCP Storm Sewer

7,200    CY        Common Excavation

3,350    CY        CL 5 Aggregate Base

3,200    TN        Bituminous Mixture

7,250    LF         Concrete Curb and Gutter

59,300  SF         Concrete Walk, Driveway and Valley Gutter

10,850  SY        Sod

2,460    CY        Topsoil/Compost

With related items

City Project 2026-107, Apple Valley Additions Stormwater Improvements

24          EA          Clear and Grub Tree

87        LF         Remove Curb and Gutter

1,148    SF         Remove Concrete Walk or Driveway

3,812    SY        Remove Bituminous Street, Walk, Trail, or Court Pavement

34,620  CY          Common Excavation – Stormwater Basin

1,401    CY          Subgrade Excavation – Stormwater Basin

1,408    CY          Filter Topsoil Borrow

349        TN         Bituminous mixture for park trails

1,956    SY          Bituminous mixture for play courts

1,956    SY          Color coating and striping for play courts

6,957    SF          Concrete Walks and Pedestrian Ramps

1,257    LF          Concrete Curbing or Curb and Gutter

15 EA          Storm Sewer Structure

1,693    LF         RCP Storm Sewer

289        LF          RCP Storm Sewer - Pipe Jacking

1,520    LF          Storm Sewer Draintile

15          EA          Storm Sewer Draintile Cleanout

7.4         AC          Seeding

69          EA          Deciduous & coniferous tree plantings

113        EA          Deciduous shrub plantings

65          EA          Perennial plantings

811        LF          Chainlink fencing systems for ballfields & courts

180        LF          Concrete seating walls

4            EA          Aluminum dugout team benches

4            EA          Basketball hoop systems

2            EA          Tennis & pickleball netting systems

26          EA          Natural wood play elements

52          EA          30” diameter fieldstones for landscaping

70          EA          Limestone blocks for stepping features in basin

2,470    SF          Crushed aggregate walking trails

With related items

Digital copies of the Contract Documents can be obtained at www.questcdn.com .  The Quest CDN project number is 10008484.  Bidders can download the Contract documents for $40 by searching for the project on Quest CDN website’s Project Search page.

Instructions for online bidding are attached. Please contact QuestCDN.com, prior to bidding, at (952) 233-1632 for assistance with free membership registration, downloading, and submitting bids.  For electronic bids, electronic bid bonds will also be accepted through Surety 2000 using contract #10008484.  The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond.

Direct inquiries to the Assistant City Engineer, Evan Acosta, at 952-953-2429 or Evan.Acosta@applevalleymn.govFor security reasons, you must enable JavaScript to view this E-mail address. . No bidder questions will be addressed after 10:00 am on Friday, March 6, 2026.

Bid Security in the amount of 5 percent of the amount of the Bid must submitted through Surety 2000 and accompany each Bid in accordance with the Instructions to Bidders.

The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids.

The successful bidder must be a “responsible contractor.” The term “responsible contractor” means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor.

The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner.

This project is subject to Minnesota Department of Labor and Industry Prevailing Wage and Truck Rental Rates. Current rates are required by grant funding for MPCA.

Christina M. Scipioni, City Clerk

City of Apple Valley, Minnesota

Publication Date/Time:
2/13/2026 12:00 AM
Closing Date/Time:
3/10/2026 10:00 AM
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...within one primary event space with the requested banquet-style seating accommodations, and provides...

State Government of Minnesota

Bid Due: 6/03/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.