RFP Qualified Environmental Professional Services St. Catherine's Healthcare Campus Asbestos Cleanup
|
| Category: | Request for Proposals |
| Status: | Open |
|
NESHAP ASBESTOS SAMPLING REPORT
Date of Report: January 20, 2026
Project Name: Pre-Renovation NESHAP Asbestos Inspection
Commercial Structure
1201 W 4th Street
McCook, NE 69001
Inspection Date: January 8, 2026
Inspector Name/License #: Michael A. Smith
NE Asbestos Inspector/Management Planner #920
Outside Information: None
Inspection Limitations:
Roofing material under the metal roofing of the structure was not sampled as part of this assessment.
Thermal system insulation (TSI) was observed above damaged hard plaster ceiling areas and within
damaged and removed wall areas at various locations throughout the structure. The full extent and
locations of piping runs and associated TSI could not be visually verified, quantities provided are estimated.
Summarized Findings:
The survey was performed by an Asbestos Hazard and Emergency Response Act of 1986 (AHERA)-
certified inspector licensed in the State of Nebraska. Every effort was made to inspect all areas of the
subject property building. Destructive sampling was required during the survey effort. Samples were
collected in accordance with National Emission Standards for Hazardous Air Pollutants (NESHAP), as
adopted by EPA, and the AHERA protocols. AHERA defines ACBM as any building material or product
that contains more than 1 percent (%) asbestos. Suspected ACBMs were grouped as homogeneous areas if
the material was similar in appearance and texture.
Bulk samples of suspected ACBM were collected to ensure that each distinct layer of material was
represented in the sample. A wetting agent was applied to friable surfaces prior to sample collection to
reduce the potential for fiber release. All samples collected were placed in a plastic bag, labeled and sealed
immediately upon collection. A unique sample identification number was assigned to each sample. A total
of thirty-one (31) bulk samples were collected for laboratory analysis. Laboratory analysis was performed
by Eurofins Built Environment Testing Central, LLC. utilizing Polarized Light Microscopy (PLM).
Eurofins participates in the National Volunteer Laboratory Accreditation Program (NVLAP) and is
accredited by the American Industrial Hygiene Association Laboratory Accreditation Program (AIHA-
LAP).
The USPEA and Occupational Safety and Health Administration (OSHA) define ACMs as any material
containing greater than one percent (>1%) asbestos, as determined by visual area estimation (microscopic
analysis). The State of Nebraska follows the EPA standard, and some materials contain one percent or less
asbestos. While these materials are not regulated by the USEPA and State of Nebraska for demolition
purposes, they are still regulated by OSHA for employee exposure during demolition/renovation activities.
For a full listing of materials tested please see Table 1 on the next page. Laboratory analytical results are
presented in Appendix D. Photographs of asbestos-containing materials are presented in Appendix E.
Estimated remediation costs for the removal of asbestos-containing materials identified as part of this
assessment and based on estimated quantities is $90,000-$120,000.
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM
| Sample | Location | Quantity* | Asbestos % | Friable | Sample | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Hard Plaster w/ Skim Coat | Throughout | - | ND | No | 1201-1 | ||||||||||||
| Hard Plaster w/ Skim Coat | Throughout | - | ND | No | 1201-2 | ||||||||||||
| Hard Plaster w/ Skim Coat | Throughout | - | ND | No | 1201-3 | ||||||||||||
| Pressure Tank Blanket Insulation | Boiler Room | 80 SF. | 15% Amosite 3% Chrysotile | Yes | 1201-4 | ||||||||||||
| White Pipe Insulation (6-8") (Basement) | Boiler Room, 3rd Floor, Pipe Chase | 1,700 LF | 15% Amosite 3% Chrysotile | Yes | 1201-5 | ||||||||||||
| White Pipe Insulation (2-4") (1st Floor) | Basement, Pipe Chase, Above Plaster Ceilings, Wall Cavities @ Water Features | 400 LF | 15% Amosite 3% Chrysotile | Yes | 1201-6 | ||||||||||||
| White Pipe Insulation (2-4") (3rd Floor) | Basement, Pipe Chase, Above Plaster Ceilings, Wall Cavities @ Water Features | 1201-6 | 15% Amosite 3% Chrysotile | Yes | 1201-7 | ||||||||||||
| White Mudded Fitting (6-8") (Basement) | Boiler Room, 3rd Floor, Pipe Chase | 100 MF | 15% Amosite 3% Chrysotile | Yes | 1201-8 | ||||||||||||
| White Mudded Fitting (2-4") (1st Floor) | Basement, Pipe Chase, Above Plaster Ceilings, Wall Cavities @ Water Features | 750 MF | 15% Amosite 3% Chrysotile | Yes | 1201-9 | ||||||||||||
| White Mudded Fitting (2-4") (3rd Floor) | Basement, Pipe Chase, Above Plaster Ceilings, Wall Cavities @ Water Features | 1201-9 | 15% Amosite 3% Chrysotile | Yes | 1201-10 | ||||||||||||
| Wood Grain Stair Tread/Landings | Stairway | - | ND | No | 1201-11 | ||||||||||||
| 9"x9" Tan VFT w/ Black Mastic | 1st Floor Intermixed 1201-15 | T/BM - 900 SF BM Only - 2,600 SF | Tile-10% Chrysotile Mastic-5% Chrysotile | No | 1201-12 | ||||||||||||
| 9"x9" Tan VFT w/ Black Mastic | 2nd Floor Intermixed 1201-15/1201-21 | T/BM - 3,300 SF | Tile-10% Chrysotile Mastic-5% Chrysotile | No | 1201-13 | ||||||||||||
| 9"x9" Tan VFT w/ Black Mastic | 3rd Floor Intermixed 1201-15/1201-21 | T/BM - 650 SF BM Only - 2,650 SF | Tile-10% Chrysotile Mastic-5% Chrysotile | No | 1201-14 | ||||||||||||
| 9"x9" Red/Brown VFT w/ Black Mastic | 1st Floor Intermixed 1201-12 | 1201-12 | Tile-10% Chrysotile Mastic-3% Chrysotile | No | 1201-15 | ||||||||||||
| 9"x9" Red/Brown VFT w/ Black Mastic | 2nd Floor Intermixed 1201-12 | 1201-13 | Tile-10% Chrysotile Mastic-3% Chrysotile | No | 1201-16 | ||||||||||||
| 9"x9" Red/Brown VFT w/ Black Mastic | 3rd Floor Intermixed 1201-12 | 1201-14 | Tile-10% Chrysotile Mastic-3% Chrysotile | No | 1201-17 | ||||||||||||
| White Window Glaze | Wood Windows | 68 Windows | <1% Chrysotile | No | 1201-18 | ||||||||||||
| White Window Glaze | Wood Windows | 68 Windows | ND | No | 1201-19 | ||||||||||||
| White Window Glaze | Wood Windows | 68 Windows | <1% Chrysotile | No | 1201-20 | ||||||||||||
| 9"x9" Red VFT w/ Black Mastic | 2nd/3rd Floors Inter-mixed 1201-12/15 & Closets | 1201-12 & 1201-15 | Tile-10% Chrysotile Mastic-3% Chrysotile | No | 1201-21 | ||||||||||||
| Drywall & Joint Compound | Room 2-3 | - | ND | No | 1201-22 | ||||||||||||
| Off-White Caulk | Wood Entry Doors | 4 Entries | 4% Chrysotile | No | 1201-23 | ||||||||||||
| Gray Caulk Off-White Caulk | Wood Windows | 68 Windows | ND 5% Chrysotile | No | 1201-24 | ||||||||||||
| Pink Window Glaze | Steel Windows | 16 Windows | <1% Chrysotile | No | 1201-25 | ||||||||||||
| Tan Caulk | Steel Windows | 16 Windows | 2% Chrysotile | No | 1201-26 | ||||||||||||
| White Window Glaze | Steel Windows | 16 Windows | ND | No | 1201-27 | ||||||||||||
| Black/Tan Paper Pipe Insulation | Various Locations | 1201-12 | 15% Chrysotile | Yes | 1201-28 | ||||||||||||
| Gray/Black Roof Flashing Tar | Roof Flashing | - | ND | No | 1201-29 | ||||||||||||
| Black/White Roof Flashing Sealant Black Flashing Tar | Roof Flashing | - | ND ND | No | 1201-30 | ||||||||||||
| Black Flashing Material Black Roof Felt | Roof Flashing | - | ND ND | No | 1201-31 | ||||||||||||
| ND-Non-Detect SF.-Square Foot LF.-Lineal Feet CT-Ceiling Tile VFT-Vinyl Floor Tile VSF-Vinyl Sheet Flooring JC- Joint Compound |
Table 1 - Asbestos - Containing Material Sample Analysis Summary
1201 W 4th Street, McCook, Nebraska
Sample Location Quantity* Asbestos % Friable Sample
Hard Plaster w/ Skim Coat Throughout - ND No 1201-1
Hard Plaster w/ Skim Coat Throughout - ND No 1201-2
Hard Plaster w/ Skim Coat Throughout - ND No 1201-3
15% Amosite
Pressure Tank Blanket Insulation Boiler Room 80 SF. Yes 1201-4
3% Chrysotile
White Pipe Insulation (6-8") Boiler Room, 3rd Floor, Pipe 15% Amosite Yes
1,700 LF 1201-5
(Basement) Chase 3% Chrysotile
Basement, Pipe Chase, 15% Amosite Yes
White Pipe Insulation (2-4") Above Plaster Ceilings, 3% Chrysotile
400 LF 1201-6
(1st Floor) Wall Cavities @ Water
Features
Basement, Pipe Chase, 15% Amosite Yes
White Pipe Insulation (2-4") Above Plaster Ceilings, 3% Chrysotile
1201-6 1201-7
(3rd Floor) Wall Cavities @ Water
Features
White Mudded Fitting (6-8") Boiler Room, 3rd Floor, Pipe 15% Amosite Yes
100 MF 1201-8
(Basement) Chase 3% Chrysotile
Basement, Pipe Chase, 15% Amosite Yes
White Mudded Fitting (2-4") Above Plaster Ceilings, 3% Chrysotile
750 MF 1201-9
(1st Floor) Wall Cavities @ Water
Features
Basement, Pipe Chase, 15% Amosite Yes
White Mudded Fitting (2-4") Above Plaster Ceilings, 3% Chrysotile
1201-9 1201-10
(3rd Floor) Wall Cavities @ Water
Features
Wood Grain Stair Tread/Landings Stairway - ND No 1201-11
1st Floor T/BM - 900 SF Tile-10% Chrysotile
9"x9" Tan VFT w/ Black Mastic No 1201-12
Intermixed 1201-15 BM Only - 2,600 SF Mastic-5% Chrysotile
2nd Floor Tile-10% Chrysotile
9"x9" Tan VFT w/ Black Mastic T/BM - 3,300 SF No 1201-13
Intermixed 1201-15/1201-21 Mastic-5% Chrysotile
3rd Floor T/BM - 650 SF Tile-10% Chrysotile
9"x9" Tan VFT w/ Black Mastic No 1201-14
Intermixed 1201-15/1201-21 BM Only - 2,650 SF Mastic-5% Chrysotile
9"x9" Red/Brown VFT w/ Black 1st Floor Tile-10% Chrysotile
1201-12 No 1201-15
Mastic Intermixed 1201-12 Mastic-3% Chrysotile
9"x9" Red/Brown VFT w/ Black 2nd Floor Tile-10% Chrysotile
1201-13 No 1201-16
Mastic Intermixed 1201-12 Mastic-3% Chrysotile
9"x9" Red/Brown VFT w/ Black 3rd Floor Tile-10% Chrysotile
1201-14 No 1201-17
Mastic Intermixed 1201-12 Mastic-3% Chrysotile
White Window Glaze Wood Windows 68 Windows <1% Chrysotile No 1201-18
White Window Glaze Wood Windows 68 Windows ND No 1201-19
White Window Glaze Wood Windows 68 Windows <1% Chrysotile No 1201-20
2nd/3rd Floors
Tile-10% Chrysotile
9"x9" Red VFT w/ Black Mastic Inter-mixed 1201-12/15 1201-12 & 1201-15 No 1201-21
Mastic-3% Chrysotile
& Closets
Drywall & Joint Compound Room 2-3 - ND No 1201-22
Off-White Caulk Wood Entry Doors 4 Entries 4% Chrysotile No 1201-23
Gray Caulk ND
Wood Windows 68 Windows No 1201-24
Off-White Caulk 5% Chrysotile
Pink Window Glaze Steel Windows 16 Windows <1% Chrysotile No 1201-25
Tan Caulk Steel Windows 16 Windows 2% Chrysotile No 1201-26
White Window Glaze Steel Windows 16 Windows ND No 1201-27
Black/Tan Paper Pipe Insulation Various Locations 1201-12 15% Chrysotile Yes 1201-28
Gray/Black Roof Flashing Tar Roof Flashing - ND No 1201-29
Black/White Roof Flashing Sealant ND 1201-30
Roof Flashing - No
Black Flashing Tar ND
Black Flashing Material ND
Roof Flashing - No 1201-31
Black Roof Felt ND
ND-Non-Detect SF.-Square Foot LF.-Lineal Feet CT-Ceiling Tile VFT-Vinyl Floor Tile VSF-Vinyl Sheet Flooring JC- Joint Compound
*TSI quantities are estimated based on total number of water features/bathrooms in the structure and estimating the
number of pipes and fittings to provide water service at those locations.
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM
Scope of Services
A visual inspection and sampling survey was conducted in general accordance with EPA/NESHAP
guidelines to determine the presence of suspect asbestos-containing building materials (ACBM) in
demolition and renovation projects.
Survey Methodology
This asbestos survey was performed by a State of Nebraska licensed asbestos inspector. An initial building
walk through was conducted to determine the presence of suspect materials, homogeneous materials, and
functional spaces throughout the facility. Following the walk through, the inspector collects samples of
selected materials identified as suspect ACBM. Sampling is limited to those materials which do not involve
destruction of building elements, physical barriers, or the structural integrity of the item being tested.
Confined spaces and areas with structural deficiencies are also not inspected unless noted. EPA guidelines
were used to determine the sampling protocol. Sampling locations were chosen to be representative of the
homogeneous sampling area(s). While an effort was made to collect samples randomly, samples were taken
preferentially from areas which were the least visible to minimize disturbance of the material.
Laboratory Methodology
Bulk samples obtained from the facility were analyzed at an accredited laboratory listed on the National
Voluntary Laboratory Accreditation Program (NVLAP) using Polarized Light Microscopy (PLM) or point
count methodology (PC) as needed. Laboratory certifications and statements of qualifications can be
provided as needed.
Warranty
HTC and its inspectors are trained and licensed to perform the services provided. All care is taken to
provide a product of the highest quality in line with professional standards. All care is taken to examine
the entirety of the facility or area requested in so far as it is safe to do so. The value of the warranty or any
claims cannot exceed the value paid for this report or survey.
Survey and Analysis Results
For a detailed report on laboratory findings please refer to Appendix D. Quantities of materials sampled
are estimated from field measurements. Owner, contractor, or other operators should field verify all
quantities to ensure accuracy.
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM
Appendix A - Licensing:
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM
Appendix B - Regulatory Overview:
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM
There are several government agencies with regulations pertaining to asbestos, renovation, and demolition
projects in Nebraska. The following items are summaries of their involvement.
Environmental Protection Agency
Asbestos Hazard Emergency Response Act (AHERA) - This act contains many regulations pertaining
exclusively to schools and can be found in 40 Code of Federal Regulation (CFR), Part 763.
National Emissions Standards for Hazardous Air Pollutants (NESHAP) - NESHAP regulations govern
most of the asbestos related renovation and demolition projects. The full text can be found in 40 CFR. Part
61.
- Requires an asbestos inspection prior to renovation and demolition projects.
- Requires removal of materials prior to being disturbed by renovation or demolition activities.
- Requires ten government working day notification prior to any renovation, demolition, or
asbestos removal activities on projects greater than 160 square feet or 260 lineal feet. All
demolition projects must be notified regardless of if asbestos is present.
- Regulates the training requirements for asbestos professionals.
- Regulates the identification, removal, transportation, and disposal of asbestos containing
materials.
Nebraska Department of Health & Human Services Asbestos Control Program
This state agency is delegated certain responsibilities created by the EPA regulations. For more information
visit the programs website located at https://dhhs.ne.gov/Pages/Asbestos.aspx.
- Requires an asbestos inspection be performed by a licensed inspector prior to any renovation or
demolition project. From the Program website:
"Before you begin demolition or renovation of a project by anyone other than a homeowner (in that person's
residential property of 4 units or less), each residential or commercial property owner must have a thorough
inspection for asbestos-containing materials. This inspection must be performed by a Nebraska-certified
asbestos inspector."
- Requires a ten-day (14 calendar day) notification on projects greater than 160 square feet or 260
lineal feet.
- Requires state licensed personnel do all asbestos work except that exempted by the residential
exemption found in glossary.
- Regulates work practices for all asbestos work.
- Enforces State regulations and some EPA regulations.
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM
Nebraska Department of Environment and Energy (NDEE)
NDEQ regulations require removal of asbestos prior to demolition or renovation. NDEE also regulates the
disposal of asbestos waste and construction and demolition (C & D) materials.
- Requires use of personnel licensed in accordance with NDOH.
- Requires inspection and removal of ACM in demolition and renovations projects.
- Requires the same ten-day notification as above.
- Requires all asbestos waste be disposed of in a licensed landfill permitted to accept asbestos.
- Requires all C&D material be disposed of or recycled in a permitted facility.
- Requires an inspection and removal of any ACM prior to a fire training exercise. Also requires disposal
of ashes from said burn in a licensed landfill.
Occupational Safety and Health Administration (OSHA)
OSHA regulates asbestos as it pertains to the safety and health of all workers on site. Further information
can be found in 29 CFR. 1926.1101.
- Requires owners of facilities to perform a survey of asbestos containing materials and institute
an operations and maintenance plan to keep materials in good condition.
- Regulates work practices for removal and repair of ACM as it pertains to employee safety.
- Requires air monitoring be performed in certain situations to protect safety of asbestos workers
as well as any other workers that may be in the area or structure.
- Requires medical monitoring, respiratory protection, and education of employees working with
asbestos.
- OSHA may regulate materials whose asbestos content does not meet the EPA definition of an
asbestos containing material.
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM
Appendix C - Glossary of Terms:
P.O. BOX 290 * ALDA * 6 8 8 10
PHONE: (3 0 8) 708-0604 * FAX: (3 0 8) 3 8 1 - 1 6 9 7
MIKE@ONEILLWR.COM

With GovernmentContracts, you can:
ITB 126823 ORAGENCY: State Purchasing Bureau PROCUREMENT CONTRACTS OFFICER(S): Clinton Paul and Zach
State Government of Nebraska
Bid Due: 9/30/2026
Bid Information Type Sealed Bid - Public Status Issued Number 2027-447 (Werner Park
Sarpy County
Bid Due: 10/07/2026
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
Omaha Housing Authority
Bid Due: 10/20/2026
RFP 127215 O3 PLEASE NOTE: THE BELOW SOLICITATION IS THE RESPONSIBILITY OF THE
State Government of Nebraska
Bid Due: 10/09/2026