| Location: | Texas |
|---|---|
| Posted: | Mar 26, 2025 |
| Agency: | New Braunfels Independent School District |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Solicitation # MEP24_001
The New Braunfels Independent School District is requesting proposals to obtain competitive proposals for retaining a Mechanical Contractor for replacement of an existing boiler, pumps, expansion tank & insulation at Seele Elementary. BAS Controls are excluded form this proposal, Mechanical Contractor will work in coordination with existing BAS System Manufacturer – Automated Logic (ALC).
Information
Deadline for this Proposal: May 22, 2024 by 2:00 p.m.
Supporting Docs
Addendum #1 – Scope Clarification
Score Sheet (digital)
Score Sheet (signed)

With GovernmentContracts, you can:
...TDCJ - Ellis Replace Boilers 1 and 3 Follow Solicitation Solicitation ID: 696-FD-26-P046 ...
State Government of Texas
Bid Due: 10/12/2026
...Repairs, and Service Calls for facility the VA Cogeneration and Boiler Chiller Plant ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/30/2026
...Stranded, Single And Multiconductor (Up To 600V, For Use In Boiler Controls, Fire ...
State Government of Texas
Bid Due: 10/07/2026
...(ASME) Boiler and Pressure Vessel Code which state that unfired pressure vessel inspections ...
DEPT OF DEFENSE
Bid Due: 9/25/2026