GARDEN CITY FIRE STATION
6000 MIDDLEBELT RD
GARDEN CITY, MI 48135
GENERAL NOTES:
ARCHITECT:
Scheible &
Associates
L.L.C.
46 Kensington Blvd.
Pleasant Ridge, MI 48069
(248) 797-9890
scheibleassociates.com
DRAWN BY:
GENERAL NOTES:
THESE GENERAL, ARCHITECTURAL, MECHANICAL AND ELECTRICAL NOTES APPLY TO
EACH SHEET OF DRAWINGS LISTED HEREIN BELOW AS WELL AS THOSE PREPARED BY
OTHERS RESPONSIBLE FOR SEALED MECHANICAL AND ELECTRICAL PERMIT, BIDDING
AND CONSTRUCTION.
THE SCOPE OF WORK INVOLVES THE RENOVATION AND/OR BUILD-OUT OF DEMISED
OFFICE SPACE COMPLETE AND READY FOR OCCUPANCY BY THE TENANT. THE
ARCHITECTURAL TRADES WORK IS REFLECTED IN THESE DRAWINGS AND
SPECIFICATIONS WHICH ARE RELEASED FOR PERMITS, BIDDING AND CONSTRUCTION.
CONTRACTOR’S BID PROPOSAL SHALL INCLUDE ALL COSTS TO PROVIDE ANY AND ALL
LABOR, MATERIALS, EQUIPMENT, SUPERVISION AND PERMITS NECESSARY TO
COMPLETE THE PROJECT, READY FOR OCCUPANCY.
THE SCOPE OF PLUMBING, HVAC, FIRE PROTECTION, ELECTRICAL, FIRE ALARM AND
RELATED WORK SHOWN IN THESE DRAWINGS AND SPECIFICATIONS REFLECT “DESIGN
INTENT”. CONTRACTOR(S) FOR TRADES OTHER THAN ARCHITECTURAL MUST
PREPARE DRAWINGS AND/OR SPECIFICATIONS FOR PERMIT, BIDDING AND ON
CONSTRUCTION WHICH FULLY DOCUMENT THE SCOPE OF WORK, ARE COMPLIANT
WITH CODES AND ORDINANCES PROMULGATED BY BODIES HAVING JURISDICTION
OVER THE PROJECT AND BEAR THE SEAL OF AN ARCHITECT OR ENGINEER LICENSED
IN THE STATE OF MICHIGAN. CONTRACTOR BID PROPOSALS SHALL INCLUDE ALL
COSTS TO PROVIDE ANY AND ALL LABOR, MATERIAL, EQUIPMENT, SUPERVISION AND
PERMITS NECESSARY TO COMPLETE THE PROJECT READY FOR OCCUPANCY.
A COPY OF ALL SEALED DRAWINGS PREPARED FOR THIS PROJECT FOR WORK SCOPE
AND TRADES OTHER THAN ARCHITECTURAL SHALL BE FORWARDED TO SCHEIBLE &
ASSOCIATES AND NCS-TEAM FOR THEIR FILES.
EACH CONTRACTOR IS RESPONSIBLE FOR KEEPING THE CONSTRUCTION AREA AS
WELL AS THE REMAINDER OF THE BUILDING BOTH THE DELIVERY OF MATERIALS AND
THE REMOVAL OF DEBRIS SHALL BE COORDINATED WITH THE BUILDING
MANAGEMENT INCLUDING, BUT NOT LIMITED TO, PERMITTED HOURS OF WORK,
BUILDING AND CONSTRUCTION AREA ACCESS, LOCATION OF DUMPSTERS,
TEMPORARY TOILET FACILITIES, USE OF ELEVATORS AND TEMPORARY PROTECTION
OF EXISTING FINISHED MATERIALS.
EACH CONTRACTOR IS RESPONSIBLE FOR MINIMIZING NOISE AND DISRUPTION OF
OTHER TENANTS AND THEIR VISITORS – BOTH ADJACENT TO AND THE OCCUPANTS
OF THE FLOORS ABOVE AND BELOW THE DEMISED SPACE.
INTERRUPTION OF EXISTING BUILDING SYSTEMS INCLUDING, BUT NOT LIMITED TO,
POWER, LIGHTING, FIRE PROTECTION, FIRE ALARM, MEANS OF EGRESS, ACCESS TO
EXITS, ELEVATORS AND OTHER IMPACTS TO LIFE SAFETY MUST HAVE THE PRIOR
APPROVAL OF AND BE COORDINATED WITH THE BUILDING OWNER(S) AND/OR THEIR
AUTHORIZED AGENTS.
EACH CONTRACTOR EMPLOYED ON THE PROJECT IS SOLELY RESPONSIBLE FOR
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES
AND FOR COORDINATION OF THE WORK OF OTHER CONTRACTORS EMPLOYED BY
THE BUILDING OWNER(S) AND/OR ITS AUTHORIZED AGENTS.
PATCHING AND REPAIR OF EXISTING CONSTRUCTION OR SYSTEMS SHALL BE
COMPLETED AND REFINISHED, AS NECESSARY AND APPROPRIATE, TO ASSURE AN
EVEN FINISH TO MATCH EXISTING ADJACENT CONSTRUCTION. FOR CONTINUOUS
SURFACES, REFINISH TO THE NEAREST INTERSECTION. FOR AN ASSEMBLY, REFINISH
THE ENTIRE UNIT.
EACH CONTRACTOR IS RESPONSIBLE FOR SECURING INSPECTIONS AND OBTAINING
THE WRITTEN APPROVAL OF REGULATORY AGENCIES HAVING JURISDICTION OVER
THE PROJECT, INCLUDING FINAL INSPECTIONS AND OCCUPANCY.
CONFIRM WITH THE BUILDING OWNER(S) AND/OR THEIR AUTHORIZED AGENTS THE
REQUIREMENTS FOR “PROJECT CLOSEOUT” INCLUDING WARRANTIES,
MANUFACTURER’S PRODUCT DATA, SHOP DRAWINGS, SAMPLES AND “AS-BUILT”
DRAWINGS. PROVIDE COPIES OF CLOSEOUT DOCUMENTS TO SCHEIBLE &
ASSOCIATES AND NCS-TEAM FOR THEIR FILES.
ARCHITECTURAL NOTES:
UNLESS OTHERWISE NOTED, THE SCOPE OF WORK REFLECTED IN THESE DRAWINGS AND
SPECIFICATIONS IS INTENDED TO MATCH “EXISTING” AND/OR “BUILDING STANDARD”
PROMULGATED BY THE BUILDING OWNER(S) AND/OR THEIR AUTHORIZED AGENTS.
EACH CONTRACTOR EMPLOYED ON THIS PROJECT IS RESPONSIBLE FOR VISITING THE
SITE AND VERIFYING EXISTING CONDITIONS AFFECTING ITS WORK OR WORK WHICH MUST
BE COORDINATED WITH OTHER TRADES. SUBMIT A REQUEST FOR INFORMATION
(RFI) TO THE ARCHITECT IDENTIFYING CONFLICTS OR SEEKING CLARIFICATION, PRIOR TO
PROCEEDING WITH THE WORK. THE ARCHITECT WILL PROMPTLY RESPOND, IN WRITING.
DO NOT SCALE DRAWINGS
SELECTIVE DEMOLITION SHOWN ON THE DRAWINGS, UNLESS OTHERWISE NOTED, SHALL
INCLUDE THE COMPLETE REMOVAL AND LEGAL DISPOSAL OF EXISTING CONSTRUCTION,
UNLESS OTHERWISE NOTED TO BE SALVAGED. COORDINATE SELECTIVE
DEMOLITION OPERATIONS WITH PLUMBING, HVAC AND ELECTRICAL TRADES, WHERE
SHOWN OR NECESSARY.
IN CONSULTATION WITH THE BUILDING OWNER(S) AND/OR THEIR AUTHORIZED AGENTS,
KEY THE DEMISED SPACE AS REQUIRED BY THE TENANT.
MECHANICAL (PLUMBING, HVAC & FIRE PROTECTION) NOTES:
MECHANICAL WORK, BOTH SELECTIVE DEMOLITION AND NEW CONSTRUCTION, SHOWN ON
THESE DRAWINGS REFLECT “DESIGN INTENT”. MECHANICAL TRADES CONTRACTOR(S) ARE
RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS, BOTH INTERNAL AND
EXTERNAL TO THE DEMISED PREMISES AND THE PREPARATION OF DETAILED DRAWINGS,
RISERS, SPECIFICATIONS AND CALCULATIONS NECESSARY. PERMIT, BIDDING AND
CONSTRUCTION DRAWINGS SHALL BE COORDINATED WITH THESE DRAWINGS
AND THOSE OF OTHER CONTRACTORS AND MUST BEAR THE SEAL OF AN ARCHITECT OR
ENGINEERING LICENSED IN THE STATE OF MICHIGAN.
UNLESS OTHERWISE NOTED, CONSTRUCTION AND MATERIALS SHALL MATCH “EXISTING”
AND CONFORM TO “BUILDING STANDARD”. REVIEW LOCATION OF THERMOSTATIC
CONTROLS WITH THE BUILDING OWNER(S) AND/OR THEIR AUTHORIZED AGENTS, PRIOR
TO INSTALLATION.
FORWARD A COPY OF THE APPROVED, SEALED DRAWINGS TO SCHEIBLE & ASSOCIATES
AND NCS-TEAM FOR THEIR FILES.
BRING ANY COORDINATION ISSUES AND CONFLICTS BETWEEN THE MECHANICAL,
ELECTRICAL AND THE ARCHITECTURAL DRAWINGS TO THE ATTENTION OF THE
ARCHITECT FOR RESOLUTION PRIOR TO ENTERING INTO CONTRACT. THE ARCHITECT
SHALL BE PROMPTLY ADVISED OF ANY CONFLICTS OR COORDINATION ISSUES ARISING
DURING CONSTRUCTION. SUBMIT AN RFI TO THE ARCHITECT PRIOR TO PROCEEDING WITH
THE WORK. THE ARCHITECT WILL PROMPTLY RESPOND, IN WRITING.
TO THE EXTENT POSSIBLE, CONTINUE TO USE EXISTING OR PROVIDE TEMPORARY
PLUMBING, FIRE PROTECTION AND HVAC SYSTEMS INCLUDING, BUT NOT LIMITED TO,
DUCTWORK, DIFFUSERS, GRILLES OR CONTROLS TO SERVE AS “TEMPORARY HEATING
AND/OR COOLING” DURING CONSTRUCTION OPERATIONS. ASSURE THAT DUST AND DIRT,
FROM CONSTRUCTION OPERATIONS BY ANY TRADE, DOES NOT CONTAMINATE EXISTING
DUCTWORK TO REMAIN OR EXISTING HVAC EQUIPMENT SERVING THE DEMISED SPACE OR
ADJACENT PORTIONS OF THE BUILDING. CHANGE FILTERS UPON COMPLETION AND PRIOR
TO OCCUPANCY.
PRIOR TO PROJECT COMPLETION, BALANCE ALL WATER & AIR SYSTEMS AND ISSUE A
REPORT TO THE BUILDING OWNER AND/OR ITS AUTHORIZED AGENTS WITH COPIES TO
SCHEIBLE & ASSOCIATES AND NCS-TEAM FOR THEIR FILES.
ELECTRICAL, PHONE/DATA & FIRE ALARM NOTES:
ELECTRICAL WORK, BOTH SELECTIVE DEMOLITION AND NEW CONSTRUCTION, SHOWN ON
THESE DRAWINGS REFLECT “DESIGN INTENT”. ELECTRICAL TRADE CONTRACTOR(S) ARE
RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS, BOTH INTERNAL AND
EXTERNAL TO THE DEMISED PREMISES AND PREPARING DETAILED DRAWINGS, RISERS,
SPECIFICATIONS AND CALCULATIONS NECESSARY. PERMIT, BIDDING AND CONSTRUCTION
DRAWINGS SHALL BE COORDINATED WITH THESE DRAWINGS AND THOSE OF OTHER
CONTRACTORS AND MUST BEAR THE SEAL OF AN ARCHITECT OR ENGINEER LICENSED IN
THE STATE OF MICHIGAN.
UNLESS OTHERWISE NOTED, CONSTRUCTION AND MATERIALS SHALL MATCH EXISTING
AND CONFORM TO “BUILDING STANDARD” .REVIEW LOCATION OF THERMOSTATIC
CONTROLS WITH THE BUILDING OWNER(S) OR THEIR AUTHORIZED AGENTS, PRIOR TO
INSTALLATION.
ALL LOW VOLTAGE WORK INCLUDING PHONE, DATA, FIRE ALARM TO BE PERFORMED BY
OWNER
FORWARD A COPY OF THE APPROVED, SEALED DRAWINGS TO SCHEIBLE & ASSOCIATES
AND NCS-TEAM FOR THEIR FILES.
BRING ANY COORDINATION AND CONFLICTS BETWEEN THE ELECTRICAL, MECHANICAL
AND ARCHITECTURAL DRAWINGS TO THE ATTENTION OF THE ARCHITECT FOR
RESOLUTION PRIOR TO ENTERING INTO CONTRACT. THE ARCHITECT SHALL BE PROMPTLY
ADVISED OF ANY CONFLICTS OR COORDINATION ISSUES ARISING DURING
CONSTRUCTION. SUBMIT AN RFI TO THE ARCHITECT PRIOR TO PROCEEDING WITH THE
WORK. THE ARCHITECT WILL PROMPTLY RESPOND, IN WRITING.
TO THE EXTENT POSSIBLE, CONTINUE TO USE EXISTING ELECTRICAL SYSTEMS,
MODIFYING LIGHTING OR POWER PANELS, SWITCHING, EXIT AND EMERGENCY LIGHTING
AND FIRE ALARM TO SERVE AS “TEMPORARY POWER & LIGHTING” DURING
CONSTRUCTION OPERATIONS.
PRIOR TO PROJECT COMPLETION, CLEAN ALL LIGHT FIXTURES USED AS “TEMPORARY
LIGHTING”, TEST ALL CIRCUITS AND FIRE ALARM DEVICES AND PROVIDE NEW LABELS IN
POWER & LIGHTING PANELS.
UP
UP
UP
UP
UP
DN
UP
UP
WH
FURN FURN
D
NCS TEAM
One Towne Square
Suite 150
Southfield, MI 48076
Tel: 989-992-6179
www.ncs-team.com
Josh@NCS-Team.com
FIRST FLOOR KEY PLAN
NORTH
NO SCALE
LIST OF DRAWINGS
T-1
A-1.0
A-1.1
A-1.2
A-1.3
A-1.4
A-2.0
A-3.0
A-4.0
A-5.0
A-5.1
A-5.2
A-6.0
TITLE SHEET, GENERAL NOTES, KEY PLAN, CODE ANALYSIS
DEMOLITION FLOOR PLAN
DEMOLITION CEILING PLAN
DEMOLITION ELEVATIONS
DEMOLITION ELEVATIONS
ROOF DEMO
PARTITION FLOOR PLAN
REFLECTED CEILING PLAN
DOOR & WINDOW PLAN, DOOR SCHEDULE, ROOM FINISH SCHEDULE
NEW ELEVATION
NEW ELEVATION
DETAILS & SECTIONS
NEW ROOF PLAN
CODE ANALYSIS
ARCHITECT INFO
REVIEW CODE
TOTAL FLOORS IN BLDG.
USE GROUP
OCCUPANT LOAD:
TYPE OF CONSTRUCTION
BUILDING SQUARE FOOTAGE
EXIT ACCESS
SPRINKLER SYSTEM
NAME: DONALD J SCHEIBLE
LICENSE NUMBER: 1301018960
EXPIRATION DATE: 01-01-27
EMAIL: DSCHEIBLE@SCHEIBLEASSOCIATES.COM
2021 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS LEVEL 2
2021 MICHIGAN MECHANICAL CODE
2021 MICHIGAN PLUMBING CODE
2023 NATIONAL ELECTRIC CODE
2021 MICHIGAN ENERGY CODE INCLUDING ASHRAE 90.1-2013
2009 ICC/ANCI A117.1 STANDARD FOR ACCESSIBLE BUILDINGS & FACILITIES
1
SEPARATED MIXED USE S2 / R3 / B / A-3
ISSUED FOR:
BID PACK 1
10-06-25
A-3 506 SF/15= 34 OCCUPANTS
B SHIFT STAFF MAX 10 OCCUPANTS
MAX. OCCUPANT LOAD 44 PERSONS
PERMIT
11-21-25
TYPE V-B
8,417 SF
SEAL:
2 EXITS REQUIRED
4 EXITS PROVIDED
SPRINKLER SYSTEM IS NOT PROVIDED
SHEET#
DATE:
T-1
10-06-25