| Location: | Ohio |
|---|---|
| Posted: | Sep 17, 2025 |
| Due: | Sep 22, 2025 |
| Agency: | Northeast Ohio Regional Sewer District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQ-75890 |
| Publication URL: | To access bid details, please log in. |
Project ID: RFQ-75890
Title: CSO Floatables Control Site Maintenance 2025-2027
Addenda: 1
Release Date: 8/28/2025
Due Date: 9/22/2025
The Contractor shall provide net removal and replacement, debris removal, and general maintenance for nine (9) Combined Sewer Overflow (CSO) Floatables control sites located in the Northeast Ohio Regional Sewer District (herein referred to as the “Sewer District”) service area (Figure 1). The Contractor shall also be responsible for providing general maintenance services at the Cleveland Metroparks Lakefront Reservation, the Shaw Brook Chicken Wire Site, East 55 th Street Floating Boom Containment Area and Westerly CEHRT Effluent and Flow Control Chambers. The Contractor shall provide all mobilization, labor, equipment, vehicles, supplies, tools, fuel, disposal, and any other incidentals necessary for the performance of all work specified herein.
The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams.
In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion.
NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual . We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents.

With GovernmentContracts, you can:
...Dewatering Pump Station. The system includes devices, wiring, raceways, pull boxes, control panels, ...
Northeast Ohio Regional Sewer District
Bid Due: 7/07/2026
...control structures including associated mechanical, electrical and instrumentation/control equipment..., and erosion. NEORSD is ...
Northeast Ohio Regional Sewer District
Bid Due: 6/25/2026
...will be constructed at grade over the wet well; it will contain an ...
Northeast Ohio Regional Sewer District
Bid Due: 7/30/2026
...Motor Control Center, Variable Frequency Drives for blowers, and Variable Frequency Drives... to ...
Northeast Ohio Regional Sewer District
Bid Due: 7/14/2026