| Location: | Florida |
|---|---|
| Posted: | Jul 28, 2025 |
| Due: | Aug 5, 2025 |
| Agency: | Kissimmee Utility Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP 25-051-MC |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Question | Date Asked | Answer | Date Answered |
| Do you have a KMZ file or a Map of the 947 poles that will be serviced via Drone Services. | 7/2/2025 11:51:29 AM | See Addendum #1. | 7/9/2025 7:50:36 AM |
| Can you advise what date the bid opening will occur? | 7/2/2025 3:43:06 PM | See Addendum #1. | 7/9/2025 7:51:12 AM |
| On page 75 of the bid under "Experience, References & Certification," the form requests a minimum of four (4) clients we are currently serving. However, each client entry includes a field labeled "Date Completed." Could you please clarify whether this section refers to past clients or those we are currently serving? | 7/9/2025 4:40:38 AM | This section refers to both past and current. If you have a client that you have been servicing for a minimum of a year, and you are still servicing them you would enter - Ongoing, Active, or Current (something to indicate that you have met the requirement, and you are currently working with this reference, so when/if we reach out them we will have that information.) | 7/9/2025 7:55:01 AM |
| On page 75 of the bid under "Experience, References & Certification," the form requests a minimum of four (4) clients we are currently serving. However, each client entry includes a field labeled "Date Completed." Could you please clarify whether this section refers to past clients or those we are currently serving? | 7/9/2025 4:56:09 AM | Question answered by way of addenda. | 7/16/2025 3:21:33 PM |
| We understand that there are regulations in FL prohibiting the use of DJI drones for utility work. Is this applicable here or will an exception be granted for storm response? Thank you | 7/9/2025 10:32:19 AM | Please see Addendum 2. | 7/16/2025 3:24:30 PM |
| Do you have detailed location information I.E. Latitude and Longitude of each pole? And/or will this be given to the awarded contractor? | 7/9/2025 3:05:50 PM | The lat and long for each pole requested for inspection will be provided to the awarded contractor prior to start of work. | 7/11/2025 1:40:41 PM |
|
Hi,
We have downloaded the bid documents, but it has a watermark saying draft under Sample Agreement. Are we expected to review the Sample Agreement? We only have the Exhibit_A_Pricing attachment, but the main RFP document talks about Tab A to Tab G. Please guide us on where we can find the rest of the Tab information. |
7/9/2025 5:14:38 PM | Please see Addendum 2. | 7/16/2025 3:22:15 PM |
| Could you please share an editable word version of the Sample Agreement? | 7/10/2025 2:37:55 PM | Please see Addendum 2 and Attachment B RFP 25-051-MC Sample Agreement. | 7/16/2025 3:30:43 PM |
| Can you please provide a map with the locations of the poles to be serviced via drone? While your service area map is helpful to get an idea of the area, more detailed information like where the poles are will allow us to be more competitive from a pricing perspective. | 7/15/2025 4:58:43 PM | Please see Addendum 2. | 7/16/2025 3:23:14 PM |
| What is the start date? | 7/16/2025 3:16:31 PM |
| Code | Description |
| [035-96] | Unmanned Aerial Vehicles (UAV), Drones |
| [285-66] | Monitors and Related Equipment, Power Line |
| [913-41] | Construction, Power Line (Includes Installation, Maintenance, and Repair) |
| Publication | Date |

With GovernmentContracts, you can:
...Insurance Required No Bid Bond Required No Bid Bond Amount Performance Bond Required ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/11/2026
...Insurance Required Yes Bid Bond Required Yes Bid Bond Amount 5% Performance Bond ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/18/2026
...Insurance Required No Bid Bond Required No Bid Bond Amount Performance Bond Required ...
Brevard County School Board
Bid Due: 6/30/2026
...Estimate Piggyback Solicitation No Insurance Required Yes Bid Bond Required No Bid Bond ...
Polk County Public Schools Facilities and Operations
Bid Due: 7/10/2026