DAF WTP Pump VFD Replacement

Location: Texas
Posted: Sep 15, 2025
Due: Oct 13, 2025
Agency: State Government of Texas
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: RFB2025-067
Publication URL: To access bid details, please log in.
DAF WTP Pump VFD Replacement
Solicitation ID:

RFB2025-067

Status:

Posted

Contact Name:

Chris Hanchard

Contact Number:

(254) 750-6640

Contact Email:

christopherh@wacotx.gov

Response Due Date:

10/13/2025

Response Due Time:

2:00 PM

Agency/Texas SmartBuy Member Number:

M1612

Posting Requirement:

21+ Days for Solicitation Notice

Solicitation Posting Date:

9/15/2025

Last Modified:

9/15/2025 2:06 am

Attachment URL: https://waco-texas.bonfirehub.com/opportunities/202287
Class/Item Code:

69139-Drives, Variable Speed (Ac, Ac Flux Vector, Dc, Eddy Current, Mechanical, Variable Speed Pulleys, Hydrostatic Speed Variator);
91082-Wiring And Other Electrical Maintenance And Repair Services;
91359-Construction And Upgrades, Wastewater Treatment Plant;
91438-Electrical;
93662-Pumps And Pump Accessories Maintenance And Repair;

Solicitation Description:

1. The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.


2. General Contractor shall self-perform a minimum of 51% of this project.

3. Liquidation Fee is $1000.00 for each day of delay.

4. TxDot Qualifications are NOT Required for this project.


The Work will be substantially completed and in-service in 255 calendar days as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions in 285 calendar days. If Additive Alternate #1 is awarded in any combination with the Base Bid, the Work will be substantially completed and in-service in 325 calendar days, and the project will be completed and ready for final payment in 355 calendar days . If a Contractor wants to perform work on Saturdays, Sundays, or City holidays, the Contractor shall seek approval by making a written request to City.

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

..., and commissioning of multiple crane cable reel control systems located at Barbours ...

Port of Houston Authority of Harris County, Texas

Bid Due: 6/10/2026

..., commercial move and relocation services, commissioning, electrical engineering, environmental services... oversight, retro-commissioning, ...

Tarrant County College District

Bid Due: 6/25/2026

...for the demolition, removal, disposal, installation, and commissioning of the new HVAC system ...

DEPT OF DEFENSE

Bid Due: 6/15/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.