| Location: | Texas |
|---|---|
| Posted: | Sep 15, 2025 |
| Due: | Oct 13, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB2025-067 |
| Publication URL: | To access bid details, please log in. |
RFB2025-067
Posted
Chris Hanchard
(254) 750-6640
christopherh@wacotx.gov
10/13/2025
2:00 PM
M1612
21+ Days for Solicitation Notice
9/15/2025
9/15/2025 2:06 am
69139-Drives, Variable Speed (Ac, Ac Flux Vector, Dc, Eddy Current, Mechanical, Variable Speed Pulleys, Hydrostatic Speed Variator);
91082-Wiring And Other Electrical Maintenance And Repair Services;
91359-Construction And Upgrades, Wastewater Treatment Plant;
91438-Electrical;
93662-Pumps And Pump Accessories Maintenance And Repair;
1. The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.
2. General Contractor shall self-perform a minimum of 51% of this project.
3. Liquidation Fee is $1000.00 for each day of delay.
4. TxDot Qualifications are NOT Required for this project.
The Work will be substantially completed and in-service in 255 calendar days as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions in 285 calendar days. If Additive Alternate #1 is awarded in any combination with the Base Bid, the Work will be substantially completed and in-service in 325 calendar days, and the project will be completed and ready for final payment in 355 calendar days . If a Contractor wants to perform work on Saturdays, Sundays, or City holidays, the Contractor shall seek approval by making a written request to City.

With GovernmentContracts, you can:
..., and commissioning of multiple crane cable reel control systems located at Barbours ...
Port of Houston Authority of Harris County, Texas
Bid Due: 6/10/2026
..., commercial move and relocation services, commissioning, electrical engineering, environmental services... oversight, retro-commissioning, ...
Tarrant County College District
Bid Due: 6/25/2026
...for the demolition, removal, disposal, installation, and commissioning of the new HVAC system ...
DEPT OF DEFENSE
Bid Due: 6/15/2026