| Location: | Missouri |
|---|---|
| Posted: | Sep 1, 2026 |
| Due: | Sep 29, 2026 |
| Agency: | Mehlville School District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Qualified Contractors are invited to submit an offer for the Mehlville School District – Bus Transportation Facility Project. Sealed Bids will be received by Mr. Mike Gegg, at the District Central Office, 2900 Lemay Ferry Road, St. Louis, Missouri 63125 before 2:00 p.m. local prevailing time on September 29, 2026. Bids will be publicly opened and read aloud at that time.
The project consists of: A new transportation facility building, storage building & dumpster enclosure, demolition of the existing facilities and site work scope that includes bus and car parking, retaining walls, landscape, utility work, etc.
Contract Documents will be available on September 1, 2026. Contractors may obtain electronic documents and/or printed documents from County Blue Reprographics, www.countyblue.com, (314) 961-3800. A refundable deposit of $100.00 is required for printed documents. Checks to be made payable to the Mehlville School District.
For project related questions please contact BLDD Architects, Laura Wunderlich via email laura.wunderlich@bldd.com
A Bid Bond and Performance and Payment Bond will be required.
The Owner reserves the right to accept or reject any or all offers, or to waive any informalities in the bidding.
The successful bidder must agree to conform to the current rules and regulations of the Fair Employment Practices Commission.
Attention is called to the provisions of Equal Employment Opportunity.
Contractor shall comply with the Missouri Department of Labor and Industrial Relations, Prevailing Wage Rates and be enrolled in the E-Verify Federal Work Authorization Program.
A Pre-Bid Conference will be held at the project site, Mehlville School District Transportation Facility, 3100 Lemay Ferry Rd, St. Louis, MO 63125 at 2:00 p.m. on September 8, 2026.
All prospective bidders are encouraged to attend, but attendance, is not mandatory. Site inspections before or after this date shall be arranged through Mike Gegg at (314) 467-7870 a minimum of 24 hours in advance of the inspection. Contractors are responsible for field verifying all conditions and dimensions prior to bidding.

With GovernmentContracts, you can:
US-56 Corridor Management Project (2026) - Baldwin City, KS 16-1308 StatusAccepting Bids Bid
Drexel Technologies
Bid Due: 9/30/2026
2026 Flood Buyout Program Professional Demolition/Land Clearance Services and Asbestos Abatement StatusAccepting Bids
Drexel Technologies
Bid Due: 10/02/2026
Western Transmission Main Phase 3C - St. Charles County, MO 22-007 StatusAccepting Bids
Drexel Technologies
Bid Due: 10/15/2026
*THIS IS A SUBCONTRACTING OPPORTUNITY* ETR/EXCELSIOR SPRINGS JOB CORPS 701 ST. LOUIS AVE.
Excelsior Springs Job Corps
Bid Due: 10/01/2026