| Location: | Washington |
|---|---|
| Posted: | Dec 1, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | Pierce County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Parkland/Brookdale Interceptor Phase 5
Addenda: 0
Release Date: 12/1/2025
Due Date: 12/17/2025
The successful bidder will be responsible for the installation of approximately 2,475 LF of 72-inch diameter sanitary sewer pipe, eight (8) HDPE access portals/tees, and sanitary sewer stubs.
The successful bidder will also be responsible for completing the installation of the sanitary sewer facilities within the timeframes and phasing specified within the Contract Documents. The Contractor will be required to provide multiple pipe installation crews working extended hours during specified calendar days and/or phases while under the direction of an on-site foreman or superintendent with minimum qualifications specified herein. The apparent low responsive bidder will be required to provide supplemental documentation to determine bidder responsibility, under the supplemental bidder responsibility criteria specified herein.
The work is to be completed within two hundred and forty-seven (247) calendar days from the date of the "Notice to Proceed".
The project estimate range is $10-13 million including WA State Sales Tax.

With GovernmentContracts, you can:
...Bid Number: ENG-22-09 Bid Title: SANITARY SEWER REHABILITATION - INFLOW AND INFILTRATON CORRECTION... ...
Oak Harbor city
Bid Due: 7/01/2026
..., sanitary sewer, water line, curbs, gutters, sidewalks, traffic islands, temporary and permanent...
State Government of Washington
Bid Due: 7/08/2026
...with mild detergent to a 100% sanitary standard, blue chemical deodorizer charging, and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/18/2026