| Location: | New Mexico |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Mar 26, 2026 |
| Agency: | City of Santa Fe |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Santa Fe River Repair at Cristobal Colon
Addenda: 0
Release Date: 3/11/2026
Due Date: 3/26/2026
This project involves the repair of five (5) existing A-weir cross-vane grade control structures along the Santa Fe River, between approximately Camino Rio and Camino de la Vuelta. The work will include reconstruction of the failed structures as grouted boulder ramps featuring integrated stilling basins, cutoff sills, and subsurface drain tiles to mitigate erosion and seepage risks.
Following construction, all disturbed areas will be revegetated to restore natural conditions and enhance riparian. The proposed design re-establishes channel grade, improves floodplain connectivity, and promotes long-term structural stability while minimizing environmental disturbance and construction impacts.
In 2018, the Santa Fe area experienced an extreme precipitation event that caused widespread damage throughout the Santa Fe River corridor, including significant failure of several grade control structures. This project builds upon prior work to repair the riparian corridor using more robust designs to help mitigate against future risks.
The purpose of this project is to re-establish channel grade stability by repairing five A-weir boulder cross vane grade control structures located between Camino de la Vuelta and Camino Rio. The design incorporates salvaged boulders from the failed structures and reconstructs them as more resilient, grouted grade control features. The use of grouting will enhance structural integrity and reduce the risk of erosion and future failure during high-flow events.

With GovernmentContracts, you can:
...the program's research in space and environmental impacts technologies. Additionally, the program... and ...
Federal Agency
Bid Due: 12/17/2028
...using renewable phytol and sugar alcohol headgroups Designed to reduce environmental impact relative... ...
ENERGY, DEPARTMENT OF
Bid Due: 6/30/2026
...and environmental impacts technologies. Additionally, the program is interested in understanding... Research Laboratory, ...
DEPT OF DEFENSE
Bid Due: 12/17/2028
...for easier and more scalable electrode fabrication Offers a lower-cost, lower-environmental-impact... projected production ...
ENERGY, DEPARTMENT OF
Bid Due: 6/30/2026