| Location: | Texas |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | May 8, 2026 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU-26 003 |
| Publication URL: | To access bid details, please log in. |
Project Description: Installation of approximately 14,300 linear feet of 96-inch steel water pipe, 570 linear feet of 78-inch steel water pipe, and 30 linear feet of 54-inch prestressed concrete cylinder water pipe by a combination of open cut and tunneling methods in addition to cathodic protection, electrical, instrumentation and controls for electrically actuated valves, site and paving restoration and all appurtenances.
Plans, Specifications and Bid Proposal Spreadsheet will be available on Bonfire at https://dallascityhall.bonfirehub.com/ on Friday, March 13, 2026 prior to 4:00 p.m. Project Manager: Tracey Long, PE

With GovernmentContracts, you can:
...: Open Description: Structural design of the sign support, its foundation, and the ...
City of Sherman
Bid Due: 8/11/2026
...specifications. The work to be performed under this contract consists of furnishing all ...
City of Irving
Bid Due: 8/21/2026
...fabrication repairs are required to replace the overflow stub pipe, install a new ...
DEPT OF DEFENSE
Bid Due: 8/24/2026