| Location: | Washington |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Apr 1, 2026 |
| Agency: | Pierce County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Swan Creek Channel Restoration Phase 2
Addenda: 0
Release Date: 3/11/2026
Due Date: 4/1/2026
This contract provides for the improvement of Swan Creek between 64th Street East and Pioneer Way East and located within Swan Creek Park. The project area is also within two separate jurisdictions, Pierce County and the City of Tacoma.
Work includes the installation of engineered log structures using multiple material delivery and installation methods. Most of the work will be constructed below the Ordinary High-Water Mark (OHWM) and shall be completed within the permit specified in-water work windows. The work will include stream isolation and flow diversion and localized dewatering. Executing the work will require personnel with demonstratable experience in successful stream channel construction. The work also includes selective clearing and re-incorporation of all salvage woody material into project elements. Work also includes establishing and restoring staging and access areas, traffic control, trail closure, erosion and sediment control, invasive weed removal, seeding, revegetation, and other work in accordance with and described in the Plans and Specifications.

With GovernmentContracts, you can:
..., ESC lead, erosion control and water pollution prevention, bark or wood chip ...
State Government of Washington
Bid Due: 9/23/2026
...of dewatering the site, providing erosion control, excavating the existing dike soil and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026
...and restoration of a portion of Clear Creek, as well as a temporary ...
State Government of Washington
Bid Due: 11/04/2026
...restoration, erosion control, water management and traffic control. Public Works Publication Date...
State Government of Washington
Bid Due: 7/07/2027