| Location: | Connecticut |
|---|---|
| Posted: | Oct 10, 2025 |
| Due: | Nov 13, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB 8597- Wtby |
| Publication URL: | To access bid details, please log in. |
The scope of work consists of: Replacement of six (6) existing plunger style sludge pumps with six (6) new rotary lobe pumps, replacement of two (2) polymer transfer pumps, replacement of three (3) polymer metering feed pumps, replacement of three (3) belt washwater pumps and rebuilding of one sludge conveyor. The scope also includes all necessary process piping replacement, replacement of 6” and 8” plug valves and all necessary electrical work including replacement of each pumps variable frequency drives.
Maureen McCauley 235 Grand Street, Room 103 City of Waterbury CT, 06702 United States Tel: 2035746748 Fax: mmccauley@waterburyct.org

With GovernmentContracts, you can:
...Bid Number: 2026-011 Bid Title: Purchase of Water Treatment Chemicals Category: Term Bids/One ...
City of Middletown
Bid Due: 7/14/2026
...-faaea1d32522 Fluoride System Improvements at the Lake Gaillard Water Treatment Plant Fluoride System... ...
Regional Water Authority
Bid Due: 6/30/2026
...-4073d34d4e0c Lake Gaillard Water Treatment Plant Filter Local Control Consoles Upgrade Project Lake... ...
Regional Water Authority
Bid Due: 6/24/2026
...Proposal Water and Sewer 55042 Project ID: 25/26-68 Release Date: Thursday, June 4, ...
Town of Manchester
Bid Due: 6/23/2026