Charlotte County Purchasing Department
18500 Murdock Circle, Suite 344
Port Charlotte, Florida 33948-1094
Phone 941.743.1378
Fax 941.743.1384
SEPTEMBER 1, 2026
TO: PROSPECTIVE BIDDERS
RE: BID 20260564, MANASOTA KEY AND SOUTH BEACH FILL HURRICANE RECOVERY PROJECT
BID DUE DATE: September 30, 2026 @ 2:00 PM EST ADDENDUM NO. 2
Bidders are hereby notified that this addendum shall be made a part of the above-named proposal and contract documents.
The following is issued to modify, and/or clarify the proposal and contract documents. These items shall have the same force
and effect as the original bid and contract documents, and bids to be submitted on the specified date shall conform with the
additions, deletions and revisions as listed herein.
ITEM #1
CORRECTION: The contact Email address for Mike Gallagher is listed as
michael.gallagher@charlottecounty.gov, but the correct email should be michael.gallagher@charlottecountyfl.gov.
ITEM #2
QUESTIONS/ANSWERS
Q1: Have the pipeline corridors been thoroughly surveyed? Do they require additional survey prior to use?
A1: Detailed geophysical surveys and cultural resources analysis were completed of the Pipeline and Conveyance Corridors.
The reports are posted on Coastal Engineering Consultants, Inc. (CEC) OneDrive which are available for download as
explained on page 3 of the Bid Documents.
Q2: Are the volumes on page 39 of the specifications calculated to the maximum allowable dredge removal depth?
A2: The volumes presented on page 39 of the specifications are calculated to the permitted limits of dredging as shown on
the Contract Plans and in the Permits.
Q3: The contract allows 165 days for substantial completion. When do you expect to issue NTP?
A3: Although we cannot predict exactly when the NTP will be provided, the County’s goal is to award at a Board of County
Commissioners meeting in October and issue a Notice to Proceed in November.
Q4: Is screening required on the beach when using a cutterhead dredge?
A4: Screening is not required on the beach when using a cutterhead dredge.
Q5: Is there more information on additional sand sources?
A5: These are being looked into and will be detailed in a future addendum.
Q6: Do surveys need to be redone on the borrow areas?
A6: The County will have CEC conduct the pre- and post-construction surveys of the borrow areas.
This addendum is binding and is to be considered as if contained within the original bid documents of Bid No. 20250564.
Bidders are required to acknowledge receipt of this addendum on their bid forms.
Kimberly A. Corbett, C.P.M., CPPB
Senior Division Manager - Purchasing
BID NO. 20250564, ADDENDUM NO. 2