| Location: | North Dakota |
|---|---|
| Posted: | Jan 20, 2026 |
| Due: | Feb 6, 2026 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C26326B0013 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Work shall include, but shall not be limited to providing all abor, materials,
equipment, etc necessary to complete Fargo VA Health Care System project 437-
22-108, Place Chilled Water Pumps on Emergency Power, in accordance with this
Scope of Work, NEC, VHA Directive 1028 (Electrical Power Distribution
Systems), the contract documents, all applicable federal, state and local codes as
well as all NFPA requirements.
Work shall include, but shall not be limited to, installation and commissioning of
anew automatic transfer switch for the five (5) 40 hp chilled water pumps
(CHWP#1-5) in BE-27 mechanical room to maintain an emergency equipment
branchpower path (from panel in ) and a normal branch power path (from panel
in), aswell as breaker location switching and replacement for pumps 8, 9, 12, 13,
14,15, 16, 17, 18, and 19, with Motor Control Center (MCC) bucket swapping and
relocation for pumps 8 and 9, with all necessary conduit and wire demolition,
intercepting, rerouting, and installation to bring them onto emergency equipment
branch power.
Some pieces of electrical distribution equipment will require commissioning
services to be obtained by the Contractor and include at a minimum, the automatic
transfer switch. The Contractor shall account for and be prepared to replace all
necessary devices, cabling, and conduit as needed and per specifications. As part of
commissioning, the Contractor shall be responsible for testing all equipment
installed per NEC, and the best practices and standards issued by the National
Electrical Testing Association (NETA), and the Institute of Electrical and
Electronics Engineers (IEEE). Period of Performance =270 calendar Days
| Feb 12, 2026 | [Solicitation (Original)] 437-22-108 Place Chilled Water Pumps on Epower |