CHARLOTTE M. MOSES, MAYOR
THOMAS KINLAW, III
MAYOR PRO TEM
COUNCIL MEMBERS:
TAYLOR L. GETWOOD
CAL J. JONES
WARREN PENA
KAALA JACOBS
DONALD FRANK, SR.
RONALD BURTON, CPM
CITY MANAGER
CHRISTE WHITLEY NED, TRMC
CITY SECRETARY
ROXANN PAIS COTRONEO
CITY ATTORNEY
September 22, 2026
REQUEST FOR QUALIFICATIONS
SCADA SYSTEM DEVELOPMENT FOR STORMWATER PUMP STATIONS
DEADLINE: Sealed proposal submittals must be received and time stamped by 3:00p.m., Central Standard
Time, Wednesday, September 23, 2026. (The clock located in the City Secretary’s office will be the official
time.) Applicant names will be read aloud beginning at 3:15 p.m. on Wednesday, September 23, 2026 in
the City Council Chambers, City Hall, 5th Floor, Port Arthur, TX. You are invited to attend.
MARK ENVELOPE: P26-058
DELIVERY ADDRESS: Please submit one (1) original and three (3) exact duplicate copies and USB
of your RFQ to:
CITY OF PORT ARTHUR
CITY SECRETARY
or
P.O. BOX 1089
PORT ARTHUR, TEXAS 77641
CITY OF PORT ARTHUR
CITY SECRETARY
444 4TH STREET, 4th Floor
PORT ARTHUR, TEXAS 77640
POINTS OF CONTACT:
Questions concerning this Request for Qualifications and Scope of Work should be directed in writing
to:
City of Port Arthur, TX
Clifton Williams, Purchasing Manager
P.O. Box 1089
Port Arthur, TX 77641
clifton.williams@portarthurtx.gov
Purchasing Division/Finance Department | Purchasing Manager, Clifton Williams,
P.O. Box 1089|444 4th Street| Port Arthur, Texas 77641| 409.983.8160 |Fax 409.983.8291
The enclosed REQUEST FOR QUALIFICATIONS (RFQ) and accompanying GENERAL
INSTRUCTIONS, CONDITIONS and SPECIFICATIONS are for your convenience in submitting
qualifications for the enclosed referenced services for the City of Port Arthur.
Qualifications must be signed by a person having authority to bind the firm in a contract. Qualifications
shall be placed in a sealed envelope, with the Vendor’s name and address in the upper left-hand corner of
the envelope.
ALL QUALIFICATIONS MUST BE RECEIVED IN THE CITY SECRETARY’S OFFICE BEFORE
OPENING DATE AND TIME. It is the sole responsibility of the firm to ensure that the sealed RFQ
submittal arrives at the above location by specified deadline regardless of delivery method chosen by the
firm. Faxed or electronically transmitted RFQ submittals will not be accepted.
Clifton Williams
Purchasing Manager
Page 2 of 21
REQUESTS FOR QUALIFICATIONS
SCADA SYSTEM DEVELOPMENT FOR STORMWATER PUMP STATIONS
(To be Completed ONLY IF YOU DO NOT BID.)
FAILURE TO RESPOND TO BID SOLICITATIONS FOR TWO (2) BID PERIODS MAY RESULT IN
REMOVAL FROM THE VENDOR’S LIST. However, if you are removed you will be reinstated upon
request.
In the event you desire not to submit a bid, we would appreciate your response regarding the
reason(s). Your assistance in completing and returning this form in an envelope marked with the
enclosed bid would be appreciated.
NO BID is submitted:
this time only
not this commodity/service only
Yes
No
Does your company provide this product or services?
Were the specifications clear?
Were the specifications too restrictive?
Does the City pay its bills on time?
Do you desire to remain on the bid list for this product or service?
Does your present work load permit additional work?
Comments/Other Suggestions:
Company Name:
Person Completing Form:
Mailing Address:
City, State, Zip Code:
Telephone:
Email:
Date:
Page 3 of 21
. REQUEST FOR QUALIFICATIONS
SCADA System Development for Stormwater Pump Stations
City of Port Arthur, Texas
1. PROJECT OVERVIEW
1.1. Background
The City of Port Arthur, Texas seeks qualified engineering firms to develop, design, and implement
a comprehensive Supervisory Control and Data Acquisition (SCADA) system for its municipal
stormwater drainage pump stations. Port Arthur, located in Jefferson County along the Texas Gulf
Coast, operates critical drainage infrastructure to manage stormwater and protect the community
from flooding events.
1.2. Project Scope
The selected engineering firm will:
• Assess the existing pump station infrastructure and control systems
• Design and develop a centralized SCADA system
• Integrate with the existing pump station equipment and controls
• Implement real-time monitoring and control capabilities
• Develop operator interfaces and reporting systems
• Implement cybersecurity framework and reporting system
• Commission and test the system
• Train the operators
• Develop standard operating procedures and maintenance protocols
1.3. Project Objectives
This project will:
• Enhance the operational efficiency of Port Arthur’s drainage (stormwater) pump stations
• Improve emergency response capabilities during flood events
• Reduce operational costs through automated monitoring and control
• Implement predictive maintenance capabilities
• Provide redundant communication systems for reliability
2. PUMP STATION INVENTORY
The SCADA system will integrate up to seven (7) pump stations throughout the City’s drainage system.
A detailed pump station inventory, capacities, and locations will be provided to qualified respondents.
3. TECHNICAL REQUIREMENTS
3.1. System Architecture
• Centralized SCADA server with redundant backup systems
• Distributed Remote Terminal Units (RTUs) at each pump station
• Secure communication networks (fiber optic, cellular, radio)
Page 4 of 21
• Human Machine Interface (HMI) workstations
• Historical data servers and reporting systems
• Mobile access capabilities for field personnel
3.2. Monitoring and Control Functions
• Real-time pump status and performance monitoring
• Water level monitoring in the wet wells and discharge points
• Flow rate measurement and totalization
• Power monitoring and electrical system status
• Alarm management and notification systems
• Remote pump start/stop capabilities
• Variable frequency drive (VFD) control integration
• Emergency backup power system monitoring
3.3. Communication Systems
• Primary: Fiber optic network, where available
• Secondary: Cellular communication systems
• Backup: Radio communications systems
• All systems must provide redundancy and failover capabilities
3.4. Cybersecurity Requirements
• Compliance with National Institute of Standards and Technology (NIST) cybersecurity
framework
• Network segmentation and firewall protection
• Multi-factor authentication systems
• Encrypted communications
• Regular security auditing and penetration testing
• Incident response procedures
3.5. Integration Requirements
• Integration with the City’s existing IT infrastructure
• Weather monitoring system integration
• Geographic Information System (GIS) integration
• Emergency management system interfaces
• Compatibility with existing Allen-Bradley, Schneider Electric, and Siemens control systems
4. QUALIFICATION REQUIREMENTS
4.1. Minimum Qualifications
• Firm Qualifications
• Licensed professional engineering firm in the State of Texas
• Minimum 10 years’ experience in SCADA system design and implementation
• Minimum five (5) years’ experience with municipal drainage (stormwater) SCADA
systems
• Demonstrated experience with stormwater management systems
Page 5 of 21
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.