| Location: | Montana |
|---|---|
| Posted: | Dec 16, 2024 |
| Due: | Jan 15, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 690567-25-SS-0002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Project: MT DAR MALM 2025(1), Defense Access Roads FY 2025
This is a "REQUEST FOR INFORMATION" only for the proposed contract work. This is not a request for formal proposals or quotes. Plans and specifications are not available at this time. The intent of this Sources Sought Notice is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified businesses interested and capable of performing the proposed contract work.
Requirement:
The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed contract is to resurface existing Minuteman Missile Base Roads consistent with Transporter-Erector (T-E) Route Standards as agreed upon by the United States Air Force, Judith Basin, and Cascade Counties, and Western Federal Lands Highway Division (WFLHD). The application of four inches of new aggregate and calcium chloride, along with isolated subexcavation and drainage improvements, is needed to improve and stabilize the roadway surfaces.
This project consists of work on 8 segments of roads totaling up to 48.90 miles in Fergus County, Montana. The work includes roadway reconditioning, aggregate surfacing, aggregate stabilization, subexcavation, and drainage. The proposed acquisition has five schedules; the length of each is as follows: Schedule A = 12.85 miles Schedule B = 23.38 miles Schedule C = 35.26 miles Schedule D = 43.99 miles Schedule E = 48.90 miles. Only one schedule will be awarded.
The project is located in Fergus County, Montana.
The project is anticipated to go on advertisement in Spring 2025 with construction in Summer 2025.
NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million.
Estimated Price Range: Between $5,000,000 and $10,000,000
Response:
Any offeror capable of providing this service shall respond to this sources sought by submitting the MS Form linked to below no later
than January 15, 2025 1400 PT.

With GovernmentContracts, you can:
...Follow Notice of Intent to Increase Contract Ceiling for Malmstrom AFB Construction MATOC ...
DEPT OF DEFENSE
Bid Due: 6/18/2026
...Follow Notice of Intent to Increase Contract Ceiling for Malmstrom AFB Construction MATOC ...
DEPT OF DEFENSE
Bid Due: 6/18/2026
...-Aside (FAR 19.5) Product Service Code: Y1PA - CONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING) ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/01/2026
...-OPERATED (GOGO) R&D FACILITIES NAICS Code: 236220 - Commercial and Institutional Building Construction..., ...
POSTAL SERVICE
Bid Due: 7/02/2026