| Location: | Alaska |
|---|---|
| Posted: | Mar 25, 2025 |
| Due: | Apr 15, 2025 |
| Agency: | ALASKA NATIVE TRIBAL HEALTH CONSORTIUM |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP #25-R-360108 - CDC Roof Replacement Design-Build Project |
| Publication URL: | To access bid details, please log in. |
Project Description: The Center of Disease Control and Prevention Building roof has had multiple leaks and is no longer under warranty. An Inverted Roof Membrane Assembly (IRMA) roof is the original construction and at the end of its useful life. The roof appears to be well maintained; however, leaks have been reported on the 2nd floor and is expected to have progressive failure. This project will replace the entire existing roof system with single-ply membrane roof system using the Design/Build delivery method.

With GovernmentContracts, you can:
...White Mountain Crew Facility Design-Build Plan Holders List Central Region , Fairbanks This... ...
State Government of Alaska
Bid Due: 10/21/2026
...RFP 2027-603 CHUGIAK HIGH SCHOOL STEVE PRIMIS AUDITORIUM RIGGING UPGRADE DESIGN-BUILD Click here... ...
Anchorage School District
Bid Due: 10/19/2026
...- White Mountain Crew Facility Design-Build Department Transportation and Public Facilities Category... Design-Build, ...
State Government of Alaska
Bid Due: 10/21/2026
...appropriately. Project Location: Joint Base Elmendorf-Richardson, Alaska Project Description: Design Bid... Build. This ...
DEPT OF DEFENSE
Bid Due: 10/08/2026