RFB NO.: 1026WESTLHVAC
CARTERET COUNTY GOVERNMENT
Phone: 252-648-7877
REQUEST FOR BID
Date:
10/20/2026
To:
Qualified Contractors
Project Name:
Western Library HVAC Replacement
Carteret County Government is requesting bids from qualified HVAC contractors to furnish all labor, equipment,
materials, supervision, permits, disposal, and incidentals necessary to replace three existing HVAC systems serving
Western Library located at 230 Taylor Notion Road, Cape Carteret, NC 28584. Proposals must show a separate
complete price for each system and a lump-sum total for all three systems.
The information below is provided for identification. Some nameplate information is illegible or unavailable.
Contractors shall inspect and verify existing conditions, capacities, electrical requirements, access, and installation
requirements before finalizing their proposals.
Scope of Work
• Replace three complete HVAC systems, each consisting of an outdoor condensing unit and indoor air
handler located in the attic space. Contractors shall verify capacities and configuration and submit proposed
equipment for County approval before ordering.
• Conduct a site assessment to verify equipment, electrical service, supports, duct connections, line-set
routes, condensate routing, controls, access routes, and other conditions affecting the work.
• Include new refrigerant line sets for each system, properly sized and installed per manufacturer instructions
and applicable codes. Include insulation, fittings, supports, sleeves, sealing, pressure testing, evacuation,
charging, and commissioning.
• Provide new plastic secondary drain/drip trays beneath all attic air handlers, with suitable supports and
drainage arrangements. Include condensate pumps wherever gravity drainage is not practical or where
required, plus associated piping, check valves, supports, and electrical/control connections.
• Provide primary condensate drain piping and secondary/overflow protection as required by code and
manufacturer instructions. Route condensate to an approved discharge point and protect the building from
leaks or overflow.
• Reconnect or replace electrical disconnects, whips, wiring, breakers, controls, thermostats, and related
components as necessary for a complete, code-compliant installation.
• Reconnect existing ductwork and transitions, include minor sheet-metal modifications, seal disturbed
connections, and verify airflow.
RFB NO.: 1026WESTLHVAC
• Include equipment supports, vibration isolation, penetrations and sealing, weatherproofing, line-set covers
where exposed, and restoration of areas disturbed by the work.
• Recover existing refrigerant and remove and legally dispose of replaced equipment and associated debris.
Refrigerant shall not be vented.
• Start up, test, and commission each system. Verify operation, controls, thermostat function, condensate
drainage and pump operation, electrical operation, refrigerant charge, and airflow. Provide start-up reports
and equipment documentation.
• Provide manufacturer warranties and at least a one-year labor/workmanship warranty unless a longer period
is offered. At closeout, provide warranty documents, manuals, model/serial numbers, and maintenance
recommendations, via e-mail to the County POC.
Additional Provisions
• Any damage caused by the Contractor, its employees, subcontractors, or equipment shall be the
Contractor’s responsibility to repair or replace, at the County’s discretion.
• All work shall take place outside normal business hours unless a different schedule is approved in advance
by the County's POC. Coordinate access, deliveries, noise, dust control, planned outages, and any
interruption of heating or cooling with the County POC. The base price must include the labor and
scheduling costs associated with required after-hours work.
• Notify the County POC promptly of concealed conditions or work outside the scope that may affect cost,
schedule, safety, or building operations. Do not proceed with extra work without written authorization.
• Contractor is responsible for jobsite safety, protection of existing property, debris removal, and leaving the
work area clean at the end of each shift.
• The Contractor shall obtain all required permits, if any; provide all required notices to the County Point of
Contact, including copies of permits; and comply with all applicable federal, state, and local laws,
ordinances, codes, rules, regulations, and safety requirements bearing on the conduct of the work. Permits
shall be posted onsite when required.
• No time extension or additional compensation will be granted for time or costs lost due to the Contractor’s