| Location: | California |
|---|---|
| Posted: | May 14, 2025 |
| Due: | Jun 15, 2025 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | JS-2025-003 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Vendor Q&A Question 1 is added as of May 14, 2025 - please reference attachements
Project Definition – ALS-U Storage Ring Lead Panel Shielding
Completion of 95% Drawings. Fabricate and install new lead panels to the inside face of the storage ring outer precast walls to
improve radiation shielding performance. This project is part of the Advanced Lights Source. Upgrade storage ring shielding. The structural design and anchorage detailing for the new lead shielding panels is based on the current ASCE 7-16, California Building Code (CBC), 2019 edition, Part 10 (California Existing Building Code, University of California Seismic Safety Policy, Geotechnical Data and Interpretation Report and Site-Specific Seismic Hazard Analyses and Development of Design Ground Motions Report. The seismic analysis and retrofit design of the existing structure have been performed in a previous task. The design considers the combination of gravity and seismic loading resisted by the anchorage to the precast walls.
Please reference attached documetation for additional infromation.
| May 5, 2025 | [Solicitation (Original)] ALS Lead Shielding Panels |
| May 20, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| May 21, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| Jun 3, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| Jun 4, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| Jun 9, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| Jun 10, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| Jun 26, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| Jun 27, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |
| Jul 9, 2025 | [Solicitation (Updated)] ALS Lead Shielding Panels |

With GovernmentContracts, you can:
...the "California Energy Code Compliance Gap Analysis" staff report by providing technical evaluation, ...
California Energy Commission
Bid Due: 7/14/2026
...implementation of recommendations from the ?California Energy Code Compliance Gap Analysis? staff... RFQ-25-401 ...
State Government of California
Bid Due: 7/14/2026
...GFO-25-304 - Modeling and Monitoring Air Quality and Co-Benefits of Energy Interventions... Division ...
California Energy Commission
Bid Due: 6/19/2026
...Analytical Chemistry (Organics and Inorganics Analysis), General Chemistry, Microbiology, Ocean Monitoring..., flexibility, and ...
Orange County Sanitation District
Bid Due: 6/30/2026