| Location: | Pennsylvania |
|---|---|
| Posted: | Aug 4, 2026 |
| Due: | Aug 24, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Newberry Township, York County |
| Publication URL: | To access bid details, please log in. |
Project Description: This Project involves the rehabilitation and improvement of the Terry Dolan Memorial Park in Newberry Township. The contractor's scope of work shall include the installation of paved parking areas and sidewalk, refurbishment of existing basketball court into (3) three pickle ball courts, demolition of any existing playground equipment, excavation and preparation of the playground subbase, installation of erosion and sediment controls, and site utilities as shown on the plan.

With GovernmentContracts, you can:
...between Melwood Ave. and Bigelow Blvd. This includes excavation work, protecting existing utilities... ...
City of Pittsburgh
Bid Due: 12/30/2035
...and demolition; unclassified bulk excavation and fine grading; erosion and sediment control measures; ...
PennBid
Bid Due: 10/22/2026
...stormwater conveyance piping, trench excavation and trench preparation for new stormwater conveyance...
PennBid
Bid Due: 10/01/2026
...services include, but are not limited to: water, soil, and waste sampling; excavation ...
State Government of Pennsylvania
Bid Due: 12/31/2099