| Location: | Utah |
|---|---|
| Posted: | Apr 1, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-006 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of roadway widening (two lane to five lane), mill-and-overlay, cement treating base course, and restriping the existing Saratoga Road & 145 North (approximately 2.0 miles). Demolition work includes removal of existing asphalt pavement, removal of one residential dwelling, removal of five wooden utility poles (by RMP), removal of existing concrete, curb, relocating utilities, street signs, etc. New construction work includes mill and overlay of existing asphalt pavement, cement treating the existing base course, road widening, signage, earthwork, installation of concrete curb & gutter, concrete sidewalk, concrete driveways, roadway striping, storm drain pipe and structures, transition from overhead to underground power (by RMP), new conduit and fiber optics, new traffic signal, extension of an existing concrete box culvert, adjusting surface utilities, and seeding. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form.

With GovernmentContracts, you can:
...Project: SLCo PWO130995 Asphalt Concrete Mix - RFC Ref. #: SLCo PWO130995 Asphalt ...
State Government of Utah
Bid Due: 6/18/2026
...MDT Close Date: Jun 16th 2026, 2:00 PM MDT Project Description: The Work ...
State Government of Utah
Bid Due: 6/16/2026
...concrete removed or damaged during water leak repair activities. Work generally includes the ...
State Government of Utah
Bid Due: 6/18/2026
...Date: Jun 25th 2026, 2:00 PM MDT Project Description: The work includes the ...
State Government of Utah
Bid Due: 6/25/2026