27-F0003 IFB (AM1)-SOW WATER INFILTRATION ASSESSMENTS & RESTORATION SERVICES (posted 10/29/26, responses requested within (1) week).
IFB# 27-F0003 Scope of Work (SOW)
Posted: 10/29/2026
Client: Fairbanks North Star Borough School District, Fairbanks Alaska.
Instructions to Bidders: See 'Proposal - Pricing and Timeline' page to submit proposal; submit
responses by 4:30pm (AK), 11/05/2026; email to purchasing@k12northstar.org Attn: Emily Proper
Project Title: Facility Water Infiltration Assessments & Emergency Water Damage Restoration
Services
Background: The school district currently operates (29) facilities in the Fairbanks North Star Borough.
On occasion, water infiltrates a building's envelope from the exterior and may impact interior
components. Remediation of interior building components having been impacted by water is necessary
on occasion.
At this time, the District is seeking proposals for services at the Administrative Service Center (ADC)
only, although services for other District facilities may be requested at a later date, pending available
funding. The information provided in Tables 1, 2, and 3 is for informational purposes only.
1. Executive Summary & Intent
In accordance with applicable educational facility standards, including but not limited to ANSI/IICRC
standards (S500/S520) and institutional procurement requirements, the Contractor shall provide
professional forensic engineering/building envelope assessment, emergency water extraction, moisture
mitigation, mold remediation, and structural restoration services across all District-owned properties.
The objective is to maintain safe, healthy indoor environments for students and staff, minimize
educational disruption, and preserve District real property assets.
a. Assess school district facilities for water infiltration by performing site visits and facility
walkthroughs.
b. Perform the assessments by observation and without disassembly of components or destructive
demolition.
c. The primary water infiltration routes through the exterior envelope are the roof, siding, and the
basement below grade.
d. Furnish a written report listing the water damage found and possible impacts of the water
damage upon the building interior.
e. Furnish a written proposal for selective demolition and repairs to accomplish remediation as
requested by the school district or deemed necessary by the contractor.
f. Based on findings and assessments, potentially perform selective demolition to remove water
damaged interior building components including but not limited to: gypsum wall board,
insulation, vapor barrier, and framing.
Qualifications & Requirements
1. The qualified contractor shall be an Environmental contractor having 5 or more years of demonstrated
work experience in facility environmental, selective demolition and restoration services.
2. The contractor shall employ qualified and appropriately certified/licensed personnel or subcontractors
as necessary through all stages of selective demolition and remediation.
3. Resulting contracts shall be subject to the FNSBSD General terms and conditions; see Exhibit "B".
2. Phase I: Water Infiltration Assessment & Diagnostic Services
For active leaks, chronic moisture intrusion, or preventative building envelope audits, the
Contractor/Consultant shall execute the following:
A. Non-Destructive & Destructive Testing
Building Envelope Inspection: Inspect exterior walls, roofing systems, flashings, window/door
seals, parapets, expansion joints, and foundation grade for water entry points.
Thermal Imaging & Moisture Mapping: Utilize infrared (FLIR) cameras, pinless/pinned
moisture meters, and hygrometers (other testing equipment may be allowable upon prior
approval), to map the boundary of moisture intrusion behind drywall, under flooring, and above
dropped ceilings.
Water Leak Tracing: Perform ASTM/AAMA-compliant water spray testing (e.g., ASTM
E1105 / AAMA 501.2) to replicate leaks and pinpoint penetration paths.
B. HVAC & Environmental Quality Review
Inspect mechanical systems, air handlers, and condensate drain pans for overflow or biological
growth.
Test ambient relative humidity, temperature, and indoor air quality (IAQ) levels in affected
zones.
C. Forensic Assessment Deliverables
Diagnostic Report: Detailed narrative outlining root cause, points of entry, affected square
footage, and structural impacts.
Corrective Action Plan (CAP): Prioritized repair recommendations, cost estimates, and
maintenance schedules.
3. Phase II: Emergency Water Damage Restoration & Mitigation
Services must comply with ANSI/IICRC S500 (Standard for Professional Water Damage Restoration)
and ANSI/IICRC S520 (Standard for Professional Mold Remediation).
A. Emergency Response & Containment
Response Time: Maintain a 24/7/365 emergency response capability, with on-site arrival
within 2 hours of emergency callout.
Hazard Screening: Where applicable, coordinate environmental screening for
Asbestos-Containing Building Materials (ACBM) and Lead-Based Paint (LBP) prior to invasive
demolition in facilities built before 1988.
Isolation: Where applicable, install physical dust/containment barriers (zipper doors, 6-mil poly
sheeting) and negative air machines (HEPA filtration) to prevent cross-contamination into active
classroom or administrative areas.
B. Water Extraction & Structural Drying
Categorization: Identify water source category (Category 1: Clean; Category 2: Gray; Category
3: Black/Sewage/Contaminated) and adjust PPE and disposal protocols accordingly.
Extraction: Remove standing water using commercial-grade truck-mounted or portable
extraction units.
Drying & Dehumidification: Deploy commercial LGR dehumidifiers and high-velocity air
movers to bring building materials to baseline moisture content within 24-48 hours.
Daily Monitoring: Maintain daily psychrometric logs (temperature, relative humidity, specific
humidity, and moisture content readings) until dry-standard targets are achieved.
C. Mold Remediation & Sanitization
Remove porous materials affected by Category 2/3 water or exhibiting visible fungal growth
(e.g., wet drywall, ceiling tiles, carpet padding).
Apply EPA-registered antimicrobial disinfectants and fungicidal solutions to hard non-porous
surfaces.
Conduct HEPA vacuuming of all surfaces within containment zones.
4. Phase III: Structural Repairs & Rebuild (Build-Back)
Following clearance, the Contractor shall restore the facility to pre-loss condition:
Drywall & Trim: Patch, tape, float, texture, and paint affected walls using low-VOC,
commercial-grade materials.
Flooring: Replace carpet tiles, VCT (Vinyl Composition Tile), athletic gym flooring, or
hardwood backing according to District material standards.
Ceilings & Insulation: Replace damaged acoustic ceiling tiles (ACT), grid systems, and
thermal/acoustic insulation.
Building Envelope Repairs: Execute exterior masonry repointing, sealants/caulking
replacement, roof patching, or flashing repairs identified in Phase I.
5. Compliance, Safety & School District Constraints
Student Safety & Background Checks: For contractors working on school grounds, near
students and outside sight and sound of a school district employee, personnel must pass required
state and federal background checks (e.g., FBI finger-printing, sex offender registry checks) prior
to entering school grounds.
Work Hours & Scheduling: Standard work during non-school hours (evenings, weekends,
school breaks) whenever possible to avoid interrupting instruction. Emergency work during
school hours requires strict separation from students.
Clearance Testing: Air quality and microbial clearance testing must be performed by an
independent, third-party Certified Industrial Hygienist (CIH) retained by the District before
removing containment barriers.
Waste Disposal: Properly containerize, haul, and dispose of damaged materials in compliance
with local, state, and EPA regulations.
6. Deliverables & Documentation
The Contractor must provide the District Facilities Director with the following project closeout
documentation:
1. Initial Water Intrusion Diagnostic & Assessment Report
2. Daily Psychrometric Drying Logs & Moisture Maps
3. Photo Documentation (Pre-mitigation, In-progress, and Post-restoration)
4. Third-Party Environmental Clearance Certificates (Asbestos/Mold, if applicable)
5. Itemized Invoicing broken down by Xactimate software pricing or contracted unit rates
FNSBSD Sites & Facilities
| Table 1. Annual water infiltration and damage assessment facility list. The Environmental Contractor will perform site visits and walkthroughs and furnish a report per facility, listing are by room number having water damage and recommending impacted areas for testing, selective demolition and repair. Furnish proposals to the school district for the interior environmental services of testing selective demolition and repair. | |||||
|---|---|---|---|---|---|
| Number | Name of the facility | Gross squar footage of t facility | Address of the facility h | Roof age, type, and area sq. ft. | Basement and year constructed |
| 1 | Administrative Cent FNSB School Distri | 81,654 c | 520 5th Avenue Fairbanks Alaska 99701 | 1985 - TPO with 1992 - mastic coating - 25,534 | Basement 1966 |
| 2 | Anderson-Crawford Elementary | 63,532 | 4472 Ravens Way Eielson Air Force Base Alaska 99702 | 1997 - IRMA - 62,938 | Slab-on-grade 1997 |
| 3 | Arctic Light Elementary | 68,272 | 4167 Neely Rd. Fort Wainwright, AK 99703 | 1993 - IRMA - 60,126 | Slab-on-grade 1993 |
| 4 | Anne Wien Elementary | 63,532 | 1501 Hampstead Ave. Fairbanks, AK 99701 | 1995 - IRMA - 62,938 | Slab-on-grade 1995 |
| 5 | Barnette Magnet school | 52,400 | 725 10th Avenue Fairbank AK, 99701 | 2009 - BUR - 33,428 | Slab-on-grade 2013 Basement electrical roo 1960 |
| 6 | Denali Elementary | 49,210 | 1042 Lathrop St. Fairbank AK 99701 | 2003 - EPDM - 35,209 | Slab-on-grade 2003 |
| 7 | Effie Kokrine Chart School | e30,856 | 601 Loftus Rd. Fairbanks, AK 99709 | 1989 - IRMA/Metal - 34,758 | Crawlspace 1989 |
| 8 | Facilities Managem Department, Shippin and Receiving | e32,815 | 1300 Minnie Street Fairbanks AK, 99701 | EPDM - 2012 - 33,852 | Slab-on-grade 1975 |
| 9 | Hunter Elementary | 59,812 | 1630 Gillam Way Fairban AK 99701 | k2003 - BUR - 57,958 | Basement boiler room 1962 |
| 10 | Hutchinson Institute Technology | 137,542 | 3750 Geist Rd. Fairbanks, AK 99709 | 2003 - BUR - 137,998 | Slab-on-grade 1973 |
| 11 | Krize building/warehouse | 2,335 | 1325 Minnie Street Fairbanks AK, 99701 | Metal roofing - 1975 - 2,335 | Slab-on-grade 1975 |
Table 1. Annual water infiltration and damage assessment facility list.
The Environmental Contractor will perform site visits and walkthroughs and furnish a report per facility, listing are
by room number having water damage and recommending impacted areas for testing, selective demolition and
repair.
Furnish proposals to the school district for the interior environmental services of testing selective demolition and
repair.
Number Name of the facility Gross squar Address of the facility Roof age, type, Basement and year
footage of th and area sq. ft. constructed
facility
1 Administrative Cent 81,654 520 5th Avenue Fairbanks 1985 - TPO with Basement 1966
FNSB School Distric Alaska 99701 1992 - mastic
coating - 25,534
2 Anderson-Crawford 63,532 4472 Ravens Way Eielson 1997 - IRMA - Slab-on-grade 1997
Elementary Air Force Base Alaska 62,938
99702
3 Arctic Light 68,272 4167 Neely Rd. Fort 1993 - IRMA - Slab-on-grade 1993
Elementary Wainwright, AK 99703 60,126
4 Anne Wien 63,532 1501 Hampstead Ave. 1995 - IRMA - Slab-on-grade 1995
Elementary Fairbanks, AK 99701 62,938
5 Barnette Magnet 52,400 725 10th Avenue Fairbank 2009 - BUR - Slab-on-grade 2013
school AK, 99701 33,428 Basement electrical room
1960
6 Denali Elementary 49,210 1042 Lathrop St. Fairbank 2003 - EPDM - Slab-on-grade 2003
AK 99701 35,209
7 Effie Kokrine Charte30,856 601 Loftus Rd. Fairbanks, 1989 - Crawlspace 1989
School AK 99709 IRMA/Metal -
34,758
8 Facilities Manageme32,815 1300 Minnie Street EPDM - 2012 - Slab-on-grade 1975
Department, Shippin Fairbanks AK, 99701 33,852
and Receiving
9 Hunter Elementary 59,812 1630 Gillam Way Fairbank2003 - BUR - Basement boiler room
AK 99701 57,958 1962
10 Hutchinson Institute 137,542 3750 Geist Rd. Fairbanks, 2003 - BUR - Slab-on-grade 1973
Technology AK 99709 137,998
11 Krize 2,335 1325 Minnie Street Metal roofing - Slab-on-grade 1975
building/warehouse Fairbanks AK, 99701 1975 - 2,335
Table 2. Annual water infiltration and damage assessment facility list.
| The Environmental Contractor will perform site visits and walkthroughs and furnish a report per facility, listing areas by room number having water damage and recommending impacted areas for testing, selective demolition and repair. Furnish proposals to the school district for the interior environmental services. | |||||
|---|---|---|---|---|---|
| Number | Name of the facility | Gross squ footage of the facility | a Address of the facility | Roof age, area, and type | Basement and year constructe |
| 12 | Ladd Elementary | 63,455 | 601 F St. Fairbanks, AK 99701 | 2018 - EPDM 63,455 | - Slab-on-grade 1992 |
| 13 | Lathrop High School | 234,412 | 901 Airport Way Fairbanks, AK 99701 | 1994 BUR - 1999 BUR - 2008 BUR - 2020 EPDM, 169,890 | Basement JROTC 1953, Heri 1962and boiler room 1953 |
| 14 | Midnight Sun Facility | 61,686 | 2301 Bradway Rd. Nor Pole, AK 99705 | t 2006 - BUR - 61,520 | Slab-on-grade 1983 |
| 15 | Nordale Education Cen | 49,210 | 397 Hamilton Ave. Fairbanks, AK 99701 | 2003 - EPDM 35,209 | - Slab-on-grade |
| 16 | North Pole Elementary | 57,154 | 250 Snowman Lane No Pole, AK 99705 | 1999 - BUR - 59,934 | Slab-on-grade |
| 17 | North Pole Middle School | 113,306 | 300 E 8th Avenue Nort Pole AK 99705 | h2013 - EPDM 87,435 | - Slab-on-grade |
| 18 | North Pole High Schoo | 156,362 | 601 North Pole High School Blvd. North Pol AK 99705 | 2008 - BUR - e107,157 | Slab-on-grade |
| 19 | Nutrition Services/Central Kitch | 24,496 e | 1305 Charles Street Fairbanks Alaska 9970 | 2009 - EPDM 120,888 | - Slab-on-grade |
| 20 | Randy Smith Middle School | 74,589 | 1401 Bainbridge Fairbanks, AK 99701 | 1999 - IRMA - 54,003 | Slab-on-grade |
| 21 | Ryan Middle School | 104,827 | 1450 Cowles St. Fairbanks, AK 99701 | 2015 EPDM - 2014 BUR - 77,104 | Slab-on-grade |
| 22 | Salcha Elementary | 13,068 | 8530 Richardson HWY. Salcha, AK 99714 | 2010- Metal - EPDM - 14,62 | Slab-on-grade 6 |
| 23 | Tanana Middle School | 101,069 | 600 Trainor Gate Rd. Fairbanks, AK 99701 | 2016, EPDM - 99,753 | Slab-on-grade |
| 24 | Ticasuk Brown Elementary | 63,761 | 885 Lakloey Dr. North Pole, AK 99705 | 2016 - EPDM 66,216 | - Slab-on-grade |
The Environmental Contractor will perform site visits and walkthroughs and furnish a report per facility, listing areas by
room number having water damage and recommending impacted areas for testing, selective demolition and repair.
Furnish proposals to the school district for the interior environmental services.
Number Name of the facility Gross squa Address of the facility Roof age, area, Basement and year constructe
footage of and type
the facility
12 Ladd Elementary 63,455 601 F St. Fairbanks, AK2018 - EPDM - Slab-on-grade 1992
99701 63,455
13 Lathrop High School 234,412 901 Airport Way 1994 BUR - Basement JROTC 1953, Heri
Fairbanks, AK 99701 1999 BUR - 1962and boiler room 1953
2008 BUR -
2020 EPDM,
169,890
14 Midnight Sun Facility 61,686 2301 Bradway Rd. Nort 2006 - BUR - Slab-on-grade 1983
Pole, AK 99705 61,520
15 Nordale Education Cen 49,210 397 Hamilton Ave. 2003 - EPDM - Slab-on-grade
Fairbanks, AK 99701 35,209
16 North Pole Elementary 57,154 250 Snowman Lane No 1999 - BUR - Slab-on-grade
Pole, AK 99705 59,934
17 North Pole Middle 113,306 300 E 8th Avenue North2013 - EPDM - Slab-on-grade
School Pole AK 99705 87,435
18 North Pole High Schoo 156,362 601 North Pole High 2008 - BUR - Slab-on-grade
School Blvd. North Pole107,157
AK 99705
19 Nutrition 24,496 1305 Charles Street 2009 - EPDM - Slab-on-grade
Services/Central Kitche Fairbanks Alaska 9970120,888
20 Randy Smith Middle 74,589 1401 Bainbridge 1999 - IRMA - Slab-on-grade
School Fairbanks, AK 99701 54,003
21 Ryan Middle School 104,827 1450 Cowles St. 2015 EPDM - Slab-on-grade
Fairbanks, AK 99701 2014 BUR -
77,104
22 Salcha Elementary 13,068 8530 Richardson HWY. 2010- Metal - Slab-on-grade
Salcha, AK 99714 EPDM - 14,626
23 Tanana Middle School 101,069 600 Trainor Gate Rd. 2016, EPDM - Slab-on-grade
Fairbanks, AK 99701 99,753
24 Ticasuk Brown 63,761 885 Lakloey Dr. 2016 - EPDM - Slab-on-grade
Elementary North Pole, AK 99705 66,216
| Table 3. Annual water infiltration and damage assessment facility list. The Environmental Contractor will perform site visits and walkthroughs and furnish a report per facility, listing areas b room number having water damage and recommending impacted areas for testing, selective demolition and repair. Furnish proposals to the school district for the interior environmental services. | |||||
|---|---|---|---|---|---|
| 25 | Two Rivers Facility | 22,200 | 400 Two Rivers Rd. Two Rivers, AK 997 | 1986 - Metal roofing - 21,08 | Slab-on-grade, the building is 3constructed on a hillside. The uphill side is below grade.. |
| 26 | University Park Elementary | 64,699 | 554 Loftus Rd. Fairbanks AK, 9970 | 2016 - EPDM - 63,036 | Slab-on-grade |
| 27 | Weller Elementary | 65,259 | 635 Elementary Dr. Fairbanks, AK 9971 | 2008 - BUR - 46,790 | Slab-on-grade, the building is constructed on a hillside, the up side is below grade. |
| 28 | Woodriver Elementary | 64,408 | 5000 Palo Verde Av Fairbanks, AK 9970 | e2020 - EPDM 60-038 | Slab-on-grade |
| 29 | West Valley High Scho | 216,884 | 3800 Geist Rd. Fairbanks, AK 9970 | 1998 - IRMA - 153,760 | Slab-ob-grade |
Table 3. Annual water infiltration and damage assessment facility list.
The Environmental Contractor will perform site visits and walkthroughs and furnish a report per facility, listing areas by
room number having water damage and recommending impacted areas for testing, selective demolition and repair.
Furnish proposals to the school district for the interior environmental services.
25 Two Rivers Facility 22,200 400 Two Rivers Rd. 1986 - Metal Slab-on-grade, the building is
Two Rivers, AK 997 roofing - 21,083constructed on a hillside. The
uphill side is below grade..
26 University Park 64,699 554 Loftus Rd. 2016 - EPDM - Slab-on-grade
Elementary Fairbanks AK, 9970 63,036
27 Weller Elementary 65,259 635 Elementary Dr. 2008 - BUR - Slab-on-grade, the building is
Fairbanks, AK 9971 46,790 constructed on a hillside, the uph
side is below grade.
28 Woodriver Elementary 64,408 5000 Palo Verde Ave2020 - EPDM Slab-on-grade
Fairbanks, AK 9970 60-038
29 West Valley High Scho 216,884 3800 Geist Rd. 1998 - IRMA - Slab-ob-grade
Fairbanks, AK 9970 153,760
| Proposal - Pricing and Timeline: | ||||
|---|---|---|---|---|
| Facility | Gross square footage | Address | Timeline - Period of Performance: | Price: |
| FNSBSD Administrative Center (ADC) | 81,654 | 520 5th Ave. Fairbanks |
| Additional services | Quantity | Price ($dollars) |
|---|---|---|
| Labor cost | Hourly | $ ________ |
| Contractor material mark-up | ______% | N/A |
| Sub-contractor material mark-up | ______% | N/A |
| Contractor equipment mark-up | ______% | N/A |
| Sub-contractor equipment mark- | ______% | N/A |
IFB# 27-F0003 Water Infiltration Assessments & Water Restoration Services
Proposal - Pricing and Timeline:
Facility Gross square Address Timeline - Period of Price:
footage Performance:
FNSBSD 81,654 520 5th Ave.
Administrative Fairbanks
Center (ADC)
Cost for Additional remediation services such as testing, selective demolition, and repairs as required and accepted by the
school district.
Additional services Quantity Price ($dollars)
Labor cost Hourly $ ________
Contractor material mark-up ______% N/A
Sub-contractor material mark-up ______% N/A
Contractor equipment mark-up ______% N/A
Sub-contractor equipment mark- ______% N/A
Offer: THE OFFEROR CERTIFIES THAT -
a. THE PRICES IN THIS OFFER HAVE BEEN ARRIVED AT INDEPENDENTLY, WITHOUT,
FOR THE PURPOSE OF RESTRICTING COMPETITION, ANY CONSULTATION,
COMMUNICATION, OR AGREEMENT WITH ANY OTHER OFFEROR OR COMPETITOR
RELATING TO (I) THOSE PRICES, (II) THE INTENTION TO SUBMIT AN OFFER, OR (III)
THE METHODS OR FACTORS USED TO CALCULATE THE PRICES OFFERED,
b. THE PRICES IN THIS OFFER HAVE NOT AND WILL NOT BE KNOWINGLY DISCLOSED
BY THE OFFEROR, DIRECTLY OR INDIRECTLY, TO ANY OTHER OFFEROR OR
COMPETITOR BEFORE CONTRACT AWARD UNLESS OTHERWISE REQUIRED BY
LAW, AND
c. NO ATTEMPT HAS BEEN MADE OR WILL BE MADE BY THE OFFEROR TO INDUCE
ANY OTHER CONCERN TO SUBMIT OR NOT TO SUBMIT AN OFFER FOR THE
PURPOSE OF RESTRICTING COMPETITION.
_________________________________________
(Signature)
_________________________________________
(Title)
_________________________________________
(Business Name)
_________________________________________
(Date)

With GovernmentContracts, you can:
RFP No. 26-25: Vegetation Management Services Published until 4 pm AKST, December 8,
Chugach Electric Association, Inc
Bid Due: 12/08/2026
Bid Name ID Status Categories Start Date End Date General Documents That Pertain
City of Ketchikan
Bid Due: 1/06/2030
Bid Name ID Status Categories Start Date End Date General Documents That Pertain
City of Ketchikan
Bid Due: 1/06/2030
IFB# 27-F0004 ENVIRONMENTAL SERVICES; ADC WATER INFILTRATION ASSESSMENT 27-F0004-IFB-SPC-ENVIRONMENTAL SERVICES; ADC WATER INFILTRATION
Fairbanks North Star Borough School District
Bid Due: 11/26/2026