| Location: | Florida |
|---|---|
| Posted: | Sep 9, 2026 |
| Due: | Sep 11, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911YN-26-Q-A024 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***SEE ATTACHED Q&A SET AS OF 09 SEP 2026***
PERFORMANCE WORK STATEMENT
Mobile Office Demolition
1.0 Objective
The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals.
2.0 Scope of Work
This project will be executed in three (3) distinct phases:
Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel.
Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility.
Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition.
3.0 Completion Standard
The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear.
4.0 Details
Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB)
Site POC: CW2 Merrill, Andrew
(904) 682-6215 ext. 1150
andrew.d.merrill2.mil@army.mil
Site Visit
Date: 09 September 2026
Time: 10:00 AM
Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
POC: Andrew Merrill (CW2)
andrew.d.merrill2.mil@army.mil
(904) 682-6215 ext. 1150
Robert Glanowski (Contract Specialist)
robert.j.glanowski.civ@army.mil
(904) 823-0555
***Attendance is not required and will not prohibit quote submissions.***
| Sep 2, 2026 | [Solicitation (Original)] Mobile Home Demolition |

With GovernmentContracts, you can:
Event: Medical Director Services Event: 185-0 Reference: RFP 2026-026 Category: Sub Category: Type:
City of Coral Gables
Bid Due: 9/30/2026
Title Start Date End Date Status RFP No. 26-34-26101 POLICE PROMOTIONAL ASSESSEMENT TESTING
Jacksonville International Airport
Bid Due: 9/29/2026
Project ID: RFB 27-001 Title: Tire Supply and Roadside Services Addenda: 0 Release
City of Clermont
Bid Due: 10/15/2026
Project: Passenger Loading Bridge Replacement Ref. #: RFSQ-112-26-RR Department: AVIATION Type: RFSQ Status:
City of Tallahassee
Bid Due: 10/01/2026