Purdom Tank One Recoating

Location: Florida
Posted: Jul 20, 2026
Due: Aug 20, 2026
Agency: City of Tallahassee
Type of Government: State & Local
Category:
  • 38 - Construction, Mining, Excavating, and Highway Mainenance Equipment
Solicitation No: IFB-094-26-RM
Publication URL: To access bid details, please log in.
Project: Purdom Tank One Recoating
Ref. #: IFB-094-26-RM
Department: ENERGY SERVICES - ELECTRIC & GAS
Type: IFB
Status:
Open
Open Date: Jul 20th 2026, 9:00 PM EDT
Questions Due Date: Aug 6th 2026, 12:00 PM EDT
Close Date: Aug 20th 2026, 2:30 PM EDT

Project Description: This specification establishes technical requirements and guidelines for the complete removal of the existing lead‑containing exterior coating system under full containment, along with interior and exterior surface preparation, coating application, inspection, and project closeout for Tank No. 1 located at the Purdom Generating Station. Work also includes necessary chime repairs and coating.
The City of Tallahassee is soliciting bids to complete coating of Tank No. 1 to address rusting and peeling that has occurred on both the top and sides of the tank. Work includes preparation of the tank and recoating as per primer/coating manufacturer recommendation, to include chime repairs as needed and relabeling of tank. The City has evidence that the primer/coating currently on the tank contains lead.
Tank No. 1 is a carbon steel storage tank measuring 60 feet in diameter and 42 feet in height. The fixed roof includes a vent, manway, and several capped nozzle penetrations. The tank shell includes piping penetrations, a manway, and an external stairway. All such features are to be included in the coating scope. For piping penetrations, recoating shall extend outward from the tank to the first encountered flange gasket, except for the overflow piping, which shall be fully coated.
It is not the Owner's intent to specify all code and technical requirements with regard to recoating of the tank or containment, nor to set forth those requirements covered by applicable codes and standards. The Contractor shall provide a quality service and quality product which meets or exceeds relevant codes, standards, and coating/primer manufacturer recommended procedures and neither the omission nor the deficiency of any item in this Specification shall relieve the Contractor from this responsibility.
Mandatory Pre-Bid and Site Visit
July 30, 2026@9:30 EST
Purdom Generating Station
667 Port Leon Drive
St. Marks, Florida 32355


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...General Information Document ID RFQ-680-26-0195/KD-2 Status Amended Description Day Tank Furnish...

Palm Beach County

Bid Due: 9/10/2026

...General Information Document ID RFQ-680-26-0195/KD-1 Status Open Description Day Tank Furnish...

Palm Beach County

Bid Due: 9/03/2026

...Description: TANK CLEANING SERVICES, WASTEWATER TREATMENT PLANTS, TC Department: Purchasing Buyer...

Palm Beach County

Bid Due: 9/26/2029

...Description: TANK CLEANING SERVICES, WASTEWATER TREATMENT PLANTS, TC Department: Purchasing Buyer...

Palm Beach County

Bid Due: 1/06/2030

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.