NOTICE INVITING BIDS - La Granada Pipeline Replacement & PRS Elimination Project (J-2501)

Location: California
Posted: Mar 15, 2026
Due: Apr 15, 2026
Agency: Santa Fe Irrigation District
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: NOTICE INVITING BIDS - La Granada Pipeline Replacement & PRS Elimination Project (J-2501)
Category: Capital Improvement Projects
Status: Open
Description:
NOTICE INVITING BIDS

The Santa Fe Irrigation District (“District”) will receive sealed bids for the La Granada Pipeline Replacement and PRS Elimination Project (J-2501) at Santa Fe Irrigation District, 5920 Linea del Cielo, PO Box 409, Rancho Santa Fe, CA 92067 no later than April 15, 2026, at 2:00 p.m. at which time or thereafter said bids will be opened and read aloud. Bids received after this time will be returned unopened. Bids shall be valid for 90 calendar days after the bid opening date.

The work generally consists of replacing approximately 7,300 feet of 4-inch and 6-inch asbestos cement (ACP) water main with 4-inch, 8-inch, and 10-inch PVC pipe along Avenida Maravillas, La Granada, Sobre Los Cerros, San Elijo Avenue, and a private drive off Paseo Delicias. It also includes the removal of two aging pressure reducing stations (PRS 360-2 and PRS 360-3), which currently reduce pressure from the 520 Zone to the 360 Zone. The project will also consolidate the 360-pressure zone into the 520 zone, improving operational efficiency and fire flow performance. The construction estimate for this project is $6.7 Million.

Bids must be submitted on District’s Bid Forms. Bidders can obtain an electronic copy of the Contract Documents on the District’s website at www.sfidwater.org. Addenda and other notices will be posted on www.sfidwater.org . Addenda and other notices will be distributed to those parties subscribed through https://www.sfidwater.org/list.aspx?Mode=Subscribe . District will make a hard copy of the Contract Documents available for review at its main desk at the District’s office located at 5920 Linea del Cielo, Rancho Santa Fe, CA 92067.

District will make a hard copy of the Contract Documents available for review at its main desk at the District’s office located at 5920 Linea del Cielo, Rancho Santa Fe, CA 92067.

Bids must be accompanied by cash, a certified or cashier’s check, or a Bid Bond in favor of District in an amount not less than ten percent (10%) of the submitted Total Bid Price.

A non-mandatory Pre-Bid Conference will be held at Santa Fe Irrigation District’s Safety Center, located at 5920 Linea del Cielo, Rancho Santa Fe, 92067, on the following date(s) and time(s): March 31, 2026, at 2:00 p.m. for project overview.

The California Air Resources Board (“CARB”) implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024, and apply broadly to all self-propelled off-road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf . Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the term of the Project. Bidders must provide, with their Bid, copies of Bidder’s and all listed subcontractors the most recent, valid Certificate of Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.

The successful bidder will be required to furnish District with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California.

Pursuant to Public Contract Code Section 22300, the successful bidder may substitute certain securities for funds withheld by District to ensure his performance under the Contract.

The Director of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract which will be awarded to the successful bidder, copies of which are on file and will be made available to any interested party upon request at SFID Corporate Office at 5920 Linea del Cielo, Rancho Santa Fe, CA or online at http://www.dir.ca.gov/dlsr. A copy of these rates shall be posted by the successful bidder at the job site. The successful bidder and all subcontractor(s) under him, shall comply with all applicable Labor Code provisions, which include, but are not limited to the payment of not less than the required prevailing rates to all workers employed by them in the execution of the Contract, the employment of apprentices, the hours of labor and the debarment of contractors and subcontractors.

Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a Contract, the bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this project, it shall be the bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this Contract and applicable law in its bid.

Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor’s license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: Class A

California Licensed General Engineering Contractor: Class A

Pursuant to Public Contract Code Section 3400(b), if District has made any findings designating certain materials, products, things, or services by specific brand or trade name, such findings and the materials, products, things, or services and their specific brand or trade names will be set forth in the Special Conditions.

Award of Contract: District shall award the Contract for the Project to the lowest responsible bidder as determined from the base bid alone by District. District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.

For further information, contact Aneld Anub at For security reasons, you must enable JavaScript to view this E-mail address. .

END OF NOTICE INVITING BIDS

Publication Date/Time:
3/15/2026 12:00 AM
Publication Information:
Notice Inviting Bids - La Granada Pipeline Replacement & PRS Elimination Project (J-2501)
Closing Date/Time:
Open Until Contracted
Submittal Information:
See
Bid Opening Information:
April 15, 2026 @ 2:00 p.m.
Pre-bid Meeting:
3/31/2026 (non-mandatory)
Contact Person:
Aneld Anub
aanub@sfidwater.org
Download Available:
See
Business Hours:
8:00 a.m. - 4:00 p.m.
Related Documents:

Attachment Preview

SANTA FE IRRIGATION DISTRICT LA GRANADA PIPELINE REPLACEMENT & PRS ELIMINATION PROJECT CIP PROJECT NO. J-2501 R I V E R S I D E C O U N T Y SAN ELIJO AVE PIPELINE Rainbow REPLACEMENT Fallbrook Palomar CAMP PENDLETON Pala 9 (U . S . M . C .) 79 Loma Linda C- 0 5 15 Bonsall Rincon Warner Springs Y T 76 Borrego Springs N 76 U San Luis Rey Vista Valley Center O Oceanside 78 Mesa Grande Yaqui C Carlsbad San Wells 78 Marcos ESCONDIDO Santa Ysabel San Pasqual Julian Scissors Crossing Leucadia Banner Encinitas Olivenhain Ramona PASEO DELICIAS (ESMT) C-11 Cardiff Rancho PIPELINE REPLACEMENT Solana Beach Santa Fe 79 Agua Caliente Del Mar Poway Spring PROJECT SITE 67 L SEE LOCATION MAP La Jolla Laguna A I R Descanso Mount 805 Lakeside Santee Guatay LA GRANADA PIPELINE C-06 163 E 8 Pine 52 REPLACEMENT Village Church C-05 Pacific Beach P M 5 Alpine 15 El Cajon Valley C-04 C-07 Preschool Mission Beach I Ocean Beach La Mesa 8 Spring Valley SAN PRS 360-3 C-03 C-01 C-02 Lemon Jamul Coronado DIEGO Grove C-10 PRS 360-2 R. Roger Rowe Elementary MARCH 2026 Boulevard National City C-08 94 Chula Vista Dulzura Jacumba Potrero Campo 125 Imperial Beach Tecate AVENIDA MARAVILLAS SOBRE LOS CERROS San Ysidro M E X I C O PIPELINE REPLACEMENT PIPELINE REPLACEMENT LOCATION & KEY MAP VICINITY MAP N NO SCALE N SCALE: 1" = 60,000' SHEET INDEX SANTA FE IRRIGATION DISTRICT RECORD DRAWINGS GENERAL 310-1701A3 1 G-01 TITLE SHEET, SHEET INDEX, VICINITY MAP & LOCATION MAP AVENIDA MARAVILLAS FIRE HYDRANT CONNECTION (VALVE-1) 310-1701B3 2 G-02 GENERAL NOTES & WATER NOTES AVENIDA MARAVILLAS & LA GRANADA (VALVES 1 & 2) 310-1701D3 3 G-03 WATER NOTES, MISCELLANEOUS NOTES, BASIS OF BEARINGS & BENCHMARK, ABBREVIATIONS & LEGEND SOBRE LOS CERROS & CODORNIZ (VALVES 1-5; BO, FH, ARV 1-2) 310-1701F3 DEMOLITION LA GRANADA & MIMOSA (VALVES 1-4) J-2501 4 D-01 PRS 360-2 & 360-3 DEMOLITION PLAN GIS MAP & VALVE ID REFERENCES J-2501_310-1695F3 CIVIL AVENUE MARAVILLAS (VALVES 1-6; BO 1-2; AV 1) J-2501_310-1701C3 5 C-01 LA GRANADA PIPELINE REPLACEMENT STA 10+00 TO STA 18+00 - PLAN & PROFILE LA GRANADA (FIRE HYDRANT CONNECTION (VALVE 1) J-2501_310-16707A3 6 C-02 LA GRANADA PIPELINE REPLACEMENT STA 18+00 TO STA 26+00 - PLAN & PROFILE LA GRANADA & AVENIDA DE ACACIAS (VALVES 3-4; BFV 1-2) 7 C-03 LA GRANADA PIPELINE REPLACEMENT STA 26+00 TO STA 34+00 - PLAN & PROFILE 8 C-04 LA GRANADA PIPELINE REPLACEMENT STA 34+00 TO STA 42+00 - PLAN & PROFILE 9 C-05 LA GRANADA PIPELINE REPLACEMENT STA 42+00 TO STA 50+00 - PLAN & PROFILE 10 C-06 LA GRANADA PIPELINE REPLACEMENT STA 50+00 TO STA 58+00 - PLAN & PROFILE DECLARATION OF RESPONSIBLE CHARGE 11 C-07 LA GRANADA PIPELINE REPLACEMENT STA 58+00 TO STA 66+00 - PLAN & PROFILE 12 C-08 LA GRANADA PIPELINE REPLACEMENT STA 66+00 TO STA 68+87 - PLAN & PROFILE I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED 13 C-09 SAN ELIJO AVE PIPELINE REPLACEMENT STA 80+00 TO STA 87+19.23 - PLAN & PROFILE RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE 14 C-10 SOBRE LOS CERROS AVE PIPELINE REPLACEMENT STA 90+00 TO STA 92+89 - PLAN & PROFILE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT 15 C-11 PASEO DELICIAS PIPELINE REPLACEMENT STA 100+00 TO STA 104+25 - PLAN & PROFILE STANDARDS. 16 C-12 CONSTRUCTION DETAILS 1 I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE SANTA FE 17 C-13 CONSTRUCTION DETAILS 2 IRRIGATION DISTRICT AND COUNTY OF SAN DIEGO DOES NOT RELIEVE ME AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN. ACCEPTANCE OF PLANS AND SPECIFICATIONS HOCH CONSULTING FIRM: SANTA FE IRRIGATION DISTRICT HEREBY ACCEPTS THESE PLANS AND SPECIFICATIONS 804 PIER VIEW WAY - SUITE 100 FOR CONSTRUCTION, AS BEING IN GENERAL COMPLIANCE WITH APPLICABLE ADDRESS: STATUTES, CODES, STANDARDS OR GUIDELINES. RESPONSIBILITY FOR THE OCEANSIDE, CALIFORNIA 92054 CITY, ST.: COMPLETENESS AND ACCURACY OF THE PLANS AND SPECIFICATIONS AND RELATED DESIGNS, AND CONFORMANCE TO APPLICABLE STATUTES, CODES, STANDARDS OR TELEPHONE: 858-431-9767 GUIDLEINES RESIDES WITH THE ENGINEER AND ENGINEERING FIRM OF RECORD. ADAM HOCH, PE BY: DATE: SURVEYING GEOTECHNICAL HYDRAULIC MODELING CALL 811 MASSON & ASSOCIATES LGC GEOTECHNICAL MISSION CONSULTING SERVICES RCE NO.: C77635 AT LEAST TWO DAYS BEFORE YOU DIG 200 E Washington Ave. 131 Calle Iglesia Suite 200 24307 Magic Mountain Parkway, Suite 1033 REGISTRATION EXPIRATION DATE: 06-30-27 Escondido, CA. 92025 San Clemente, CA. 92672 Valencia, CA. 91355 (SIGNED AND DATED BY AUTHORIZED DISTRICT STAFF) (760) 741-3570 (949) 369-6141 (619) 851-5178 m UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
NO. DESCRIPTION DATE APPR DESIGNED B Y: OWNER SANTA FE IRRIGATION DIST : 5920 Linea Del Cielo Rancho Santa Fe, CA 92067 Y: (858) 756-2424 PREPARED UNDER CIVIL RIC T DAM HOC T H E D I R E C T HOCH CONSULTIN A H S U P E R V I S IO N OF: H 804 Pier View Way - Suite C 77635 Oceanside, CA 92054 EXP 6/30/27 C www.hochconsulting.com 03-04-26 DATE VERIFY SCALES SANTA FE IRRIGATION DISTRICT CIP NO. J-2501
DRAWN BY G BAR IS ONE INCH ON ORIGINAL DRAWING 100 0 1 IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY LA GRANADA PIPELINE REPLACEMENT & PRS ELIMINATION PROJECT TITLE SHEET, SHEET INDEX LOCATION MAP & VICINITY MAP DRAWING NO. G-01
CHECKED B SHEET NO. 01 OF 17
SANTA FE IRRIGATION DISTRICT RECORD DRAWINGS
310-1701A3 AVENIDA MARAVILLAS FIRE HYDRANT CONNECTION (VALVE-1)
310-1701B3 AVENIDA MARAVILLAS & LA GRANADA (VALVES 1 & 2)
310-1701D3 SOBRE LOS CERROS & CODORNIZ (VALVES 1-5; BO, FH, ARV 1-2)
310-1701F3 LA GRANADA & MIMOSA (VALVES 1-4)
J-2501 GIS MAP & VALVE ID REFERENCES
J-2501_310-1695F3 AVENUE MARAVILLAS (VALVES 1-6; BO 1-2; AV 1)
J-2501_310-1701C3 LA GRANADA (FIRE HYDRANT CONNECTION (VALVE 1)
J-2501_310-16707A3 LA GRANADA & AVENIDA DE ACACIAS (VALVES 3-4; BFV 1-2)
G-01 TITLE SHEET, SHEET INDEX, VICINITY MAP & LOCATION MAP
G-02 GENERAL NOTES & WATER NOTES
G-03 WATER NOTES, MISCELLANEOUS NOTES, BASIS OF BEARINGS & BENCHMARK, ABBREVIATIONS & LEGEND
D-01 PRS 360-2 & 360-3 DEMOLITION PLAN
C-01 LA GRANADA PIPELINE REPLACEMENT STA 10+00 TO STA 18+00 - PLAN & PROFILE
C-02 LA GRANADA PIPELINE REPLACEMENT STA 18+00 TO STA 26+00 - PLAN & PROFILE
C-03 LA GRANADA PIPELINE REPLACEMENT STA 26+00 TO STA 34+00 - PLAN & PROFILE
C-04 LA GRANADA PIPELINE REPLACEMENT STA 34+00 TO STA 42+00 - PLAN & PROFILE
C-05 LA GRANADA PIPELINE REPLACEMENT STA 42+00 TO STA 50+00 - PLAN & PROFILE
C-06 LA GRANADA PIPELINE REPLACEMENT STA 50+00 TO STA 58+00 - PLAN & PROFILE
C-07 LA GRANADA PIPELINE REPLACEMENT STA 58+00 TO STA 66+00 - PLAN & PROFILE
C-08 LA GRANADA PIPELINE REPLACEMENT STA 66+00 TO STA 68+87 - PLAN & PROFILE
C-09 SAN ELIJO AVE PIPELINE REPLACEMENT STA 80+00 TO STA 87+19.23 - PLAN & PROFILE
C-10 SOBRE LOS CERROS AVE PIPELINE REPLACEMENT STA 90+00 TO STA 92+89 - PLAN & PROFILE
C-11 PASEO DELICIAS PIPELINE REPLACEMENT STA 100+00 TO STA 104+25 - PLAN & PROFILE
C-12 CONSTRUCTION DETAILS 1
C-13 CONSTRUCTION DETAILS 2

SANTA FE IRRIGATION DISTRICT
LA GRANADA PIPELINE REPLACEMENT & PRS ELIMINATION PROJECT
CIP PROJECT NO. J-2501
CAMP PENDLETON
(U . S . M . C .)
5
San Luis Rey
Oceanside
Carlsbad
Leucadia
Encinitas
Cardiff
Solana Beach
Del Mar
PROJECT SITE
SEE LOCATION MAP La Jolla Laguna
163
Pacific Beach
Mission Beach Ocean Beach
MARCH 2026
LOCATION & KEY MAP
N NO SCALE
SHEET INDEX
SANTA FE IRRIGATION DISTRICT RECORD DRAWINGS
310-1701A3
310-1701B3
310-1701D3
310-1701F3
J-2501
J-2501_310-1695F3
J-2501_310-1701C3
J-2501_310-16707A3
DECLARATION OF RESPONSIBLE CHARGE
I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED
RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE
BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT
STANDARDS.
I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE SANTA FE
IRRIGATION DISTRICT AND COUNTY OF SAN DIEGO DOES NOT RELIEVE ME AS ENGINEER OF WORK,
OF MY RESPONSIBILITIES FOR PROJECT DESIGN.
ACCEPTANCE OF PLANS AND SPECIFICATIONS
HOCH CONSULTING
FIRM:
SANTA FE IRRIGATION DISTRICT HEREBY ACCEPTS THESE PLANS AND SPECIFICATIONS
804 PIER VIEW WAY - SUITE 100
FOR CONSTRUCTION, AS BEING IN GENERAL COMPLIANCE WITH APPLICABLE ADDRESS:
STATUTES, CODES, STANDARDS OR GUIDELINES. RESPONSIBILITY FOR THE
OCEANSIDE, CALIFORNIA 92054
CITY, ST.:
COMPLETENESS AND ACCURACY OF THE PLANS AND SPECIFICATIONS AND RELATED
DESIGNS, AND CONFORMANCE TO APPLICABLE STATUTES, CODES, STANDARDS OR TELEPHONE: 858-431-9767
GUIDLEINES RESIDES WITH THE ENGINEER AND ENGINEERING FIRM OF RECORD.
ADAM HOCH, PE
BY: DATE:
RCE NO.: C77635
REGISTRATION EXPIRATION DATE: 06-30-27
(SIGNED AND DATED BY AUTHORIZED DISTRICT STAFF)
TITLE SHEET, SHEET INDEX G-01
LOCATION MAP & VICINITY MAP
01
L
A I R
E
P M
I
R I V E R S I D E C O U N T Y
Rainbow
Fallbrook Palomar
Pala
79
15 Bonsall Rincon Warner Springs
76 Borrego Springs
76
Vista Valley Center
78 Mesa Grande Yaqui
San Wells
Marcos
ESCONDIDO Santa Ysabel
San Pasqual Julian Scissors Crossing
Banner
Olivenhain Ramona
Rancho
Santa Fe 79 Agua Caliente
Poway
Spring
67
Descanso Mount 805 Lakeside Santee Guatay
8 Pine
5 Alpine 15 El Cajon Valley
La Mesa 8 Spring Valley SAN
Lemon Jamul
Coronado DIEGO Grove
Boulevard National City
94
Chula Vista Dulzura Jacumba
Potrero
Campo
Imperial Beach Tecate
San Ysidro M E X I C O
Y T
N
U
O
C
1 2 3 4 5 6 7 8 9 10
A
SAN ELIJO AVE PIPELINE
REPLACEMENT
9
Loma Linda C- 0
B
78
PASEO DELICIAS (ESMT) C-11
PIPELINE REPLACEMENT
LA GRANADA PIPELINE C-06
52 REPLACEMENT Village Church
C-04
C-05
C-07 Preschool
C PRS 360-3 C-03 C-01 C-02
C-10 PRS 360-2 R. Roger Rowe Elementary
C-08
125
AVENIDA MARAVILLAS SOBRE LOS CERROS
PIPELINE REPLACEMENT PIPELINE REPLACEMENT
VICINITY MAP
N SCALE: 1" = 60,000'
D
GENERAL
1 G-01 TITLE SHEET, SHEET INDEX, VICINITY MAP & LOCATION MAP AVENIDA MARAVILLAS FIRE HYDRANT CONNECTION (VALVE-1)
2 G-02 GENERAL NOTES & WATER NOTES AVENIDA MARAVILLAS & LA GRANADA (VALVES 1 & 2)
3 G-03 WATER NOTES, MISCELLANEOUS NOTES, BASIS OF BEARINGS & BENCHMARK, ABBREVIATIONS & LEGEND SOBRE LOS CERROS & CODORNIZ (VALVES 1-5; BO, FH, ARV 1-2)
DEMOLITION LA GRANADA & MIMOSA (VALVES 1-4)
4 D-01 PRS 360-2 & 360-3 DEMOLITION PLAN GIS MAP & VALVE ID REFERENCES
CIVIL AVENUE MARAVILLAS (VALVES 1-6; BO 1-2; AV 1)
5 C-01 LA GRANADA PIPELINE REPLACEMENT STA 10+00 TO STA 18+00 - PLAN & PROFILE LA GRANADA (FIRE HYDRANT CONNECTION (VALVE 1)
6 C-02 LA GRANADA PIPELINE REPLACEMENT STA 18+00 TO STA 26+00 - PLAN & PROFILE LA GRANADA & AVENIDA DE ACACIAS (VALVES 3-4; BFV 1-2)
7 C-03 LA GRANADA PIPELINE REPLACEMENT STA 26+00 TO STA 34+00 - PLAN & PROFILE
8 C-04 LA GRANADA PIPELINE REPLACEMENT STA 34+00 TO STA 42+00 - PLAN & PROFILE
9 C-05 LA GRANADA PIPELINE REPLACEMENT STA 42+00 TO STA 50+00 - PLAN & PROFILE
10 C-06 LA GRANADA PIPELINE REPLACEMENT STA 50+00 TO STA 58+00 - PLAN & PROFILE
11 C-07 LA GRANADA PIPELINE REPLACEMENT STA 58+00 TO STA 66+00 - PLAN & PROFILE
E 12 C-08 LA GRANADA PIPELINE REPLACEMENT STA 66+00 TO STA 68+87 - PLAN & PROFILE
13 C-09 SAN ELIJO AVE PIPELINE REPLACEMENT STA 80+00 TO STA 87+19.23 - PLAN & PROFILE
14 C-10 SOBRE LOS CERROS AVE PIPELINE REPLACEMENT STA 90+00 TO STA 92+89 - PLAN & PROFILE
15 C-11 PASEO DELICIAS PIPELINE REPLACEMENT STA 100+00 TO STA 104+25 - PLAN & PROFILE
16 C-12 CONSTRUCTION DETAILS 1
17 C-13 CONSTRUCTION DETAILS 2
F
SURVEYING GEOTECHNICAL HYDRAULIC MODELING
CALL 811
MASSON & ASSOCIATES LGC GEOTECHNICAL MISSION CONSULTING SERVICES
AT LEAST TWO DAYS
BEFORE YOU DIG 200 E Washington Ave. 131 Calle Iglesia Suite 200 24307 Magic Mountain Parkway, Suite 1033
Escondido, CA. 92025 San Clemente, CA. 92672 Valencia, CA. 91355
(760) 741-3570 (949) 369-6141 (619) 851-5178 m
UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
NO. DESCRIPTION DATE APPR DESIGNED BY: OWNER PREPARED UNDER CIVIL VERIFY SCALES SANTA FE IRRIGATION DISTRICT CI P N O . J-2501
SANTA FE IRRIGATION DISTRIC
A
T DAM HOC
H S
T
U
H
P
E
E
D
R
I
V
R
I
E
S
C
IO
T
N OF:
HOCH CONSULTING
BAR IS ONE INCH ON
LA GRANADA PIPELINE REPLACEMENT & PRS ELIMINATION PROJECT
DRAWN BY: 5920 Linea Del Cielo H 804 Pier View Way - Suite 1 O 0 RI 0 GINAL DRAWING DRAWING NO.
C 77635 0 1
Rancho Santa Fe, CA 92067 Oceanside, CA 92054
EXP 6/30/27 C
CHECKED BY: (858) 756-2424 www.hochconsulting.com IF NOT ONE INCH ON
03-04-26 SHEET NO.
THIS SHEET, ADJUST
DATE SCALES ACCORDINGLY OF 17

GENERAL NOTES WATER NOTES WATER NOTES (CONT.) 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE SANTA FE IRRIGATION DISTRICT (DISTRICT) PROJECT 1. CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL NOT START UNTIL A PRE-CONSTRUCTION MEETING HAS BEEN 19. NO DISRUPTION TO EXISTING WATER DISTRIBUTION MAINS WILL BE ALLOWED ON MONDAYS OR FRIDAYS. SPECIFICATIONS AND THE MOST RECENT EDITIONS OF THE FOLLOWING DOCUMENTS: (1) SAN DIEGO WATER HELD IN ACCORDANCE WITH WAS SPECIFICATION 01000. ALL SHUTDOWNS FOR SYSTEM TIE-INS WILL BE SCHEDULED ON TUESDAY, WEDNESDAY, OR THURSDAY. AGENCIES' STANDARDS (WAS), (2) SAN DIEGO REGIONAL STANDARD DRAWINGS (SDRSD), (3) STANDARD SHUTDOWNS WILL BE CONFINED TO 8:30AM-4PM, UNLESS FURTHER RESTRICTED BY THE DISTRICT OR SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK), AND (4) COUNTY OF SAN DIEGO 2. UNLESS EXPLICITLY CALLED OUT DIFFERENTLY ON THE APPROVED PLANS AND SPECIFICATIONS, ALL OTHER PERMITTING AGENCIES DUE TO SITE-SPECIFIC CONDITIONS. REGIONAL SUPPLEMENT AMENDMENTS. CONSTRUCTION SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SAN DIEGO WATER AGENCIES' STANDARDS (WAS). CURRENT WAS REQUIREMENTS CAN BE FOUND AT WWW.SDWAS.ORG 20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING THE PIPELINE AND LEGALLY DISPOSING OF, 2. ALL WORK WITHIN THE SAN DIEGO COUNTY RIGHT OF WAY SHALL BE GOVERNED BY THE WORK HOURS AND DECHLORINATING WATER AS NECESSARY TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL STIPULATED IN PERMITS AND CONSISTENT WITH DISTRICT REQUIREMENTS. 3. CONTRACTOR SHALL POSSESS A CLASS 'A' CONTRACTOR'S LICENSE FOR WORK ON WATER AND SEWER PIPELINE REGULATIONS REGARDING STORM WATER AND NON-STORM WATER DISCHARGE. INSTALLATIONS IN CONFORMANCE WITH THE CALIFORNIA CONTRACTOR'S LICENSE LAW AND WAS 3. ALL EXISTING UTILITIES INDICATED ON THE DRAWINGS ARE SHOWN DIAGRAMMATICALLY AND ARE BASED ON SPECIFICATION 01000. 21. THE DISTRICT DOES NOT GUARANTEE A 100% WATERTIGHT SHUTDOWN OF THE EXISTING DISTRICT FIELD RESEARCH AND AVAILABLE, AS-BUILT DRAWINGS AND FACILITY MAPS. THE CONTRACTOR SHALL DISTRIBUTION SYSTEM AND VALVES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HANDLING, POTHOLE AND VERIFY THE SIZE, MATERIAL AND HORIZONTAL & VERTICAL LOCATION, BEARING, AND 4. CONTRACTOR SHALL GUARANTEE ALL WORK FOR 1 YEAR AFTER DATE OF NOTICE OF COMPLETION FILED BY THE REMOVING OR WORKING WITH NUISANCE WATER THAT MAY RESULT FROM THE EXISTING DISTRICT INCLINATION OF ALL EXISTING UTILITIES PRIOR TO ANY DEMOLITION WORK OR INSTALLATION OF NEW DISTRICT AND SHALL REPAIR OR REPLACE ANY OR ALL SUCH WORK, TOGETHER WITH ANY OTHER WORK WHICH DISTRIBUTION SYSTEM. WORK. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES MAY BE IMPACTED AT NO COST TO THE DISTRICT. OR STRUCTURES AT THE WORK SITE WHETHER THEY ARE SHOWN ON THE DRAWINGS OR NOT. THE ACTUAL 22. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN, AT ALL TIMES DURING CONSTRUCTION, AMPLE MEANS LOCATION AND DEPTH OF ALL EXISTING WATER LINES AND CONNECTION POINTS ARE TO BE VERIFIED 5. THE DISTRICT SHALL RECEIVE A CONSTRUCTION SCHEDULE FROM THE CONTRACTOR PRIOR TO START OF AND DEVICES TO PROMPTLY REMOVE AND PROPERLY DISPOSE OF ALL WATER FROM ANY SOURCE (EXCAVATED) PRIOR TO COMMENCEMENT OF WORK, AND ANY DISCREPANCY IS TO BE BROUGHT TO THE CONSTRUCTION IN ACCORDANCE WITH WAS SPECIFICATION 01000. WORK DONE WITHOUT DISTRICT INSPECTION ENTERING THE EXCAVATIONS OR OTHER PARTS OF THE WORK. ATTENTION OF THE DISTRICT AND THEN SUBMITTED TO THE DISTRICT FOR REVIEW AND APPROVAL PRIOR TO SHALL BE SUBJECT TO REMOVAL. COMMENCEMENT OF WORK. EXPLORATORY EXCAVATIONS AND POTHOLES SHALL BE SCHEDULED AND 23. UTILITY SEPARATION REQUIREMENTS (HORIZONTAL AND VERTICAL) SHALL BE PER THE DEPARTMENT OF COMPLETED SUFFICIENTLY AHEAD OF CONSTRUCTION AND PRIOR TO FABRICATION OF MATERIALS TO ALLOW 6. THE CONTRACTOR SHALL NOTIFY THE DISTRICT 72 HOURS IN ADVANCE FOR INSPECTION. DRINKING WATER (DDW) AND APPROVED BY THE DISTRICT. FOR DESIGN REVISIONS, IF NECESSARY. 7. ALL TESTING AND CERTIFICATIONS REQUIRED FOR THIS PROJECT SHALL BE THE RESPONSIBILITY OF THE 24. CONTRACTOR TO PROVIDE APPROVED MATERIAL SUBMITTALS PRIOR TO INSTALLATION. CONTRACTOR TO 4. STATIONS, COORDINATES, AND RADII REFER TO THE HORIZONTAL CENTER OF THE PIPE. CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF ALL TESTING. THIS INCLUDES HAVE ALL MATERIAL INSPECTED BY THE DISTRICT INSPECTOR PRIOR TO THE START OF CONSTRUCTION. ALL COMPACTION TESTING, DISINFECTION TESTING, CONCRETE TESTING, AND/OR ANY OTHER TESTING MATERIAL SHALL BE NEW. 5. WHEN CROSSING UNDER UTILITIES, THE CONTRACTOR SHALL PROVIDE, TO THE SATISFACTION OF THE REQUIREMENTS ASSOCIATED WITH THIS PROJECT. TESTING SHALL BE COMPLETED IN ACCORDANCE WITH WAS ENGINEER, DISTRICT INSPECTOR, AND THE UTILITY OWNER, THE PROPOSED METHOD OF SUPPORT OF THE OR OTHER APPLICABLE STANDARDS. ALL TESTING AND PROVISION OF TESTING RESULTS SHALL BE COORDINATED 25. THE CONTRACTOR SHALL FURNISH ALL NEW WATER METER BOXES, PER DISTRICT REQUIREMENTS. NEW UTILITY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE EVERY MEASURE NECESSARY TO CLOSELY WITH THE DISTRICT INSPECTOR. DISTRICT INSPECTOR SHALL BE RESPONSIBLE FOR REVIEWING AND METERS SHALL BE FURNISHED AND INSTALLED BY THE DISTRICT. PROTECT THE UTILITY IN PLACE. ANY FAILURE OF THE UTILITY DUE TO THE CONTRACTOR'S OPERATION SHALL APPROVING ALL TEST RESULTS. BE REPAIRED TO THE SATISFACTION OF THE ENGINEER, DISTRICT INSPECTOR, AND THE UTILITY OWNER AT 26. FOR WORK OVER EXISTING FACILITIES, HEAVY EQUIPMENT (ABOVE H2O LOADING) SHALL NOT BE USED THE CONTRACTOR'S EXPENSE. 8. DISINFECTION OF WATER MAINS SHALL BE IN ACCORDANCE WITH WAS AND SHALL BE WITNESSED BY THE WHEN COVER OVER THE WATER MAIN IS LESS THAN 36" THROUGH ALL PHASES OF CONSTRUCTION, DISTRICT AT THE TIME OF THE SAMPLING. INCLUDING THE REMOVAL, OVER EXCAVATION, AND/OR INSTALLATION OF PAVEMENT SECTIONS, 6. NEITHER THE ENGINEER NOR THE DISTRICT SHALL BE RESPONSIBLE FOR THE ENFORCEMENT OF SAFETY WITHOUT THE WRITTEN APPROVAL OF THE DISTRICT. STANDARDS. CONTRACTOR ACKNOWLEDGES CONTINUOUS RESPONSIBILITY FOR JOB SAFETY THROUGHOUT 9. ANY AND ALL REQUIRED PERMITS SHALL BE PROCURED, PAID FOR, AND ADHERED TO BY THE CONTRACTOR, AND THE DURATION OF THE PROJECT. SAID RESPONSIBILITY SHALL BE CONTINUOUS AND NOT LIMITED TO THIS INCLUDES TRAFFIC CONTROL, EXCAVATION, AND ALL OTHER PERMITS . INCLUDED IN THE PROJECT BID 27. EXISTING WATER FACILITIES SHALL BE KEPT IN SERVICE DURING CONSTRUCTION. HIGHLINING MAY BE NORMAL WORK HOURS. ASSOCIATED WITH THIS PROJECT. REQUIRED AND SHALL BE INSTALLED ACCORDING TO WAS WHICH WILL REQUIRE AN APPROVED SUBMITTAL. ABSOLUTELY NO CUTTING OR FILLING WILL BE ALLOWED OVER EXISTING FACILITIES UNTIL 7. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR COMPLETE, SAFE, AND ADEQUATE TRAFFIC CONTROL 10. THE CONTRACTOR SHALL POTHOLE ALL TIE-IN AND POTENTIAL CONFLICT LOCATIONS BEFORE EXCAVATION. ANY FACILITIES HAVE BEEN EITHER RELOCATED, DISINFECTED, AND TESTED OR HIGHLINED, DISINFECTED, AND AND SHALL PROVIDE AND MAINTAIN ALL NECESSARY EQUIPMENT, SIGNING, PERSONNEL, AND ANYTHING DISCREPANCIES WITH THE APPROVED PLANS (E.G. PIPE MATERIAL, SIZE OR LOCATION) SHALL BE BROUGHT TO TESTED. ANY WATER LATERALS DAMAGED OR DESTROYED DURING CONSTRUCTION WILL BE REPAIRED OR ELSE NECESSARY FOR TRAFFIC CONTROL AS IS REQUIRED BY THE AGENCY HAVING JURISDICTION OR AS MAY THE ATTENTION OF THE DISTRICT INSPECTOR PRIOR TO PROCEEDING. POTHOLING SHALL BE COMPLETED BEFORE REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. ALL EXISTING WATER SERVICES AND OTHERWISE BE NECESSARY. THE CONTRACTOR SHALL ALSO FULLY COMPLY WITH THE REQUIREMENTS OR THE DISTRICT WILL SCHEDULE A SHUTDOWN. APPROVAL OF THIS PLAN BY THE DISTRICT DOES NOT CONSTITUTE APPURTENANT CONNECTIONS SHALL BE RECONNECTED TO THE NEW PIPELINE WHETHER SHOWN ON THE RECOMMENDED TRAFFIC AND PEDESTRIAN CONTROL PROCEDURES IN ACCORDANCE WITH THE CALIFORNIA A REPRESENTATION AS TO THE ACCURACY OF THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY PLANS OR NOT. DEPARTMENT OF TRANSPORTATION, "MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND UNDERGROUND UTILITY, PIPE, OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. MAINTENANCE WORK ZONES," LATEST EDITION AND THE W.A.T.C.H. MANUAL. IN ADDITION, FLAG MEN 28. SACRIFICIAL ANODES SHALL BE INSTALLED ON ALL COPPER TUBING PER WAS WC-17 AND SPECIFICATION SHALL BE STATIONED BY THE CONTRACTOR ON ALL CONSTRUCTION SITES WHERE TRAFFIC TRAVELS IN BOTH 11. A MINIMUM OF TWO (2) WORKING DAYS PRIOR TO EXCAVATION, VERIFY LOCATIONS OF UNDERGROUND 13110. DIRECTIONS USING THE SAME LANE. UTILITIES. THE CONTRACTOR IS REQUIRED TO CALL DIG ALERT: 811 29. WHERE APPURTENANCES CANNOT BE INSTALLED PERPENDICULAR TO THE MAIN, TRACER WIRE SHALL BE 8. STRIPING DESTROYED DURING CONSTRUCTION SHALL BE REPLACED IN-KIND BY THE CONTRACTOR AT THE 12. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6205 BY SUBMITTING A DETAILED PLAN SHOWING INSTALLED FROM THE MAIN TO THE METER BOX, AS DIRECTED BY DISTRICT INSPECTOR. CONTRACTOR'S EXPENSE. TRAFFIC STRIPES AND PAVEMENT MARKINGS SHALL NOT BE APPLIED OVER THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE FOR WORK PROTECTION EXISTING STRIPES THAT ARE TO BE REMOVED. EXISTING STRIPES SHALL BE FIRST REMOVED BY SANDBLASTING FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING 30. THE CONTRACTOR SHALL INSTALL INSULATED TRACER WIRE AND WARNING/IDENTIFICATION TAPE PER BEFORE ANY NEW APPLICATION. THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR MORE IN WAS SPECIFICATION 15000 AND WP-01. DEPTH AND APPROVED BY THE OWNER PRIOR TO EXCAVATION. IF PLAN VARIES FROM THE SHORING SYSTEM 9. ALL EXISTING IMPROVEMENTS INCLUDING CURB AND GUTTERS, SIDEWALKS, TRAFFIC LOOPS, ASPHALT STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLAN SHALL BE PREPARED BY A 31. CONTRACTOR IS RESPONSIBLE FOR PROPER HANDLING, STORAGE, AND DISPOSAL OF ASBESTOS CEMENT CONCRETE OR PCC PAVING, WHICH ARE DAMAGED BY CONSTRUCTION OR ARE BEING JOINED OR MATCHED REGISTERED CIVIL ENGINEER OR STRUCTURAL ENGINEER AT THE CONTRACTOR'S EXPENSE. PIPE (ACP) IN CONFORMANCE WITH WAS SPECIFICATION 15000. IN CONNECTION WITH THIS PROJECT, SHALL BE REPLACED, JOINED OR MATCHED IN A MANNER SATISFACTORY TO THE DISTRICT ENGINEER PRIOR TO FINAL ACCEPTANCE, INCLUDING NECESSARY SAW 13. FINAL STREET SUB-GRADE SHALL BE ESTABLISHED PRIOR TO EXCAVATION OF PIPELINE TRENCHES, AND MINIMUM 32. ALL PIPE TO BE CL-305 PVC (C-900) DR14 IN ACCORDANCE WITH WAS SPECIFICATION 15064 UNLESS CUTTING, REMOVAL AND REPLACEMENT. COVER OVER/ABOVE PIPE SHALL BE 24-INCHES FOR HYDROTESTING PER WAS SPECIFICATION 02223. OTHERWISE APPROVED BY THE DISTRICT. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MONUMENTATION AND/OR BENCHMARKS WHICH WILL 14. CONTRACTOR TO PROVIDE CONSTRUCTION STAKING AND THREE (3) SETS OF CUT SHEETS TO THE DISTRICT 33. ALL PVC PIPE DEFLECTIONS (HORIZONTAL AND VERTICAL) SHALL BE MADE BY USE OF DUCTILE IRON BE DISTURBED OR DESTROYED BY CONSTRUCTION. SUCH POINTS SHALL BE REFERENCED AND REPLACED WITH INSPECTOR 24 HOURS PRIOR TO EXCAVATING. FITTINGS OR HIGH DEFLECTION JOINT COUPLINGS WITH A 4 DEGREE MAXIMUM DEFLECTION PER APPROPRIATE MONUMENTATION BY A LICENSED LAND SURVEYOR OR A REGISTERED CIVIL ENGINEER COUPLING (2 DEGREE PER JOINT). NO BENDING (CURVING) OF PVC PIPE SHALL BE PERMITTED. AUTHORIZED TO PRACTICE LAND SURVEYING. A CORNER RECORD OR RECORD OF SURVEY, AS APPROPRIATE, 15. THE CONTRACTOR SHALL STAKE THE LOCATIONS OF NEW PIPELINES AND APPURTENANCES (INCLUDING WATER SHALL BE FILED BY THE LICENSED LAND SURVEYOR OR REGISTERED CIVIL ENGINEER AS REQUIRED BY THE METERS) AND THE RIGHT-OF-WAY OR EASEMENTS PRIOR TO THEIR INSTALLATION. THE CONTRACTOR SHALL 34. ALL PIPE SHALL HAVE A MINIMUM 6" BEDDING THICKNESS AS SHOWN ON WAS WP-02. PIPE ZONE LAND SURVEYOR'S ACT. THE CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTS THAT ARE PROVIDE AN AS-BUILT SURVEY FOR NEW PIPELINES AND APPURTENANCES. PROVIDE ALL SURVEY DATA MATERIAL SHALL CONFORM TO THE GRADATION IDENTIFIED IN WAS SPECIFICATION 02223. LOCATED WITHIN 10 FEET OF THE CENTERLINE OF CONSTRUCTION BY COVERING THE MONUMENTS WITH (COORDINATES AND ELEVATIONS) CONFORMING TO THE SURVEY CONTROL SYSTEM USED FOR THE DESIGN 1-INCH THICK STEEL PLATE DURING EXCAVATION AND BACKFILL OPERATIONS OR SHALL EMPLOY SURVEY IN AUTOCAD 2018 OR MORE RECENT FORMAT. THE SURVEY SHALL INCLUDE AN AS-BUILT SURVEY OF ALL 35. ALL VALVES INSTALLED SHALL BE HOLIDAY-FREE GATE VALVES, IN ACCORDANCE WITH WAS, UNLESS ALTERNATIVE PROTECTION MEASURES NECESSARY TO AVOID DISTURBANCE OR DAMAGE TO THE NEW IMPROVEMENTS, INCLUDING, BUT NOT LIMITED TO, VALVE CORNERS, AIR VALVE ENCLOSURES, BLOW OFF OTHERWISE NOTED ON THE PLANS. CONTRACTOR SHALL PAINT ALL VALVE CAN LIDS PER THE DISTRICT'S MONUMENTS. ALTERNATIVE PROTECTION MEASURES SHALL BE SUBMITTED FOR DISTRICT REVIEW AND VALVES, PIPELINES, FITTINGS ON PIPELINES AND CONNECTION POINTS TO EXISTING PIPELINES. COLOR CODE. APPROVAL IN ACCORDANCE WITH [LIST "SUBMITTALS" TECH SPEC NUMBER]. THE CAP OF ANY MONUMENT WITHIN THE WORK AREA SHALL BE RAISED TO MATCH FINISHED GRADE. 16. NO PERSONS, OTHER THAN AN EMPLOYEE OR AGENT OF THE DISTRICT, SHALL HAVE A RIGHT TO OPERATE ANY 36. PRIOR TO INSTALLATION OF ALL EPOXY COATED MATERIALS, CONTRACTOR SHALL PERFORM HOLIDAY FREE PART OF THE DISTRICT'S DISTRIBUTION SYSTEM. THE CONTRACTOR SHALL NOT OPERATE ANY VALVES, BUT SHALL TESTING AND PROVIDE SPECIFIC DOCUMENTATION TO THE DISTRICT INSPECTOR. 11. CONTRACTOR SHALL NOTIFY THE SANTA FE IRRIGATION DISTRICT PRIOR TO COMMENCING ANY WORK IN THE REQUEST THAT THE DISTRICT INSPECTOR CONTACT THE DISTRICT TO SCHEDULE VALVE OPERATION BY THE TIME REQUIREMENTS INDICATED IN THE SPECIFICATIONS. CONTRACTOR SHALL ALSO NOTIFY THE FOLLOWING DISTRICT. ONCE THE NEW IMPROVEMENT IS CONNECTED TO THE EXISTING DISTRIBUTION SYSTEM, ALL VALVES 37. CONTRACTOR SHALL PRIME, WAX TAPE, AND PLASTIC WRAP ALL FITTINGS PER WAS SPECIFICATION 13110. AGENCIES 48 HOURS PRIOR TO COMMENCING ANY WORK: ON THE NEW SYSTEM SHALL ONLY BE OPERATED BY THE DISTRICT. FOLLOWING INSTALLATION OF WAX TAPE, CONTRACTOR TO PROVIDE POLYETHYLENE ENCASEMENT FOR ALL FERROUS METAL MATERIAL. THIS INCLUDES, BUT IS NOT LIMITED TO, VALVES, COUPLINGS, AND SANTA FE IRRIGATION DISTRICT 858-756-2424 17. THE CONTRACTOR SHALL NOTIFY THE DISTRICT OF THE SCHEDULE FOR ISOLATING LINES AT THE FITTINGS. PRE-CONSTRUCTION MEETING AND AT LEAST 14 CALENDAR DAYS PRIOR. THIS TIME IS REQUIRED TO PROVIDE COUNTY OF SAN DIEGO, DEPT. PUBLIC WORKS 1-800-422-4133 ADEQUATE NOTIFICATION TO CUSTOMERS AND SCHEDULE DISTRICT O&M RESOURCES TO ACCOMMODATE 38. CONTRACTOR SHALL PAINT ALL POTABLE WATER FACILITIES PER WAS SPECIFICATION 09910. THE ORION CABLE 760-591-9600 PLANNED SHUTDOWNS. DISTRICT'S SPECIFIC COLOR CODE TO BE PROVIDED TO THE AWARDED CONTRACTOR. AT&T (FORMERLY PAC BELL) , TELEPHONE 1-800-811-5238 SAN DIEGO GAS & ELECTRIC COMPANY 1-800-581-7138 18. CONTRACTOR TO PROVIDE THE DISTRICT A 14-DAY ADVANCED NOTICE TO SCHEDULE SHUTDOWN. FINAL 39. VALVES SHALL HAVE A MINIMUM OF 1.5' OF COVER FROM THE TOP OF NUT/OPERATOR TO GROUND UNDERGROUND SERVICE ALERT 1-800-227-2600 OR 811 SHUTDOWN DATE DETERMINED BY THE DISTRICT. SURFACE. IF LESS THAN THIS EXISTS, IT SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION. RANCHO SANTA FE FIRE DEPARTMENT 858-756-5971 SEE SHEET 03 FOR CONTINUATION OF WATER NOTES NORTH COUNTY TRANSIT DISTRICT (866) 735-2929
NO. DESCRIPTION DATE APPR DESIGNED BY: OWNER SANTA FE IRRIGATION DIST 5920 Linea Del Cielo Rancho Santa Fe, CA 92067 (858) 756-2424 PREPARED UNDER CIVIL RIC T DAM HOC T H E D I R E C T HOCH CONSULTIN A H S U P E R V I S IO N OF: H 804 Pier View Way - Suite C 77635 Oceanside, CA 92054 EXP 6/30/27 C www.hochconsulting.com 03-04-26 DATE VERIFY SCALES SANTA FE IRRIGATION DISTRICT CIP NO. J-2501
DRAWN BY: G BAR IS ONE INCH ON ORIGINAL DRAWING 100 0 1 IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY LA GRANADA PIPELINE REPLACEMENT & PRS ELIMINATION PROJECT GENERAL NOTES & WATER NOTES DRAWING NO. G-02
CHECKED BY: SHEET NO. 02 OF 17

1 2 3 4 5 6 7 8 9 10
GENERAL NOTES WATER NOTES WATER NOTES (CONT.)
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE SANTA FE IRRIGATION DISTRICT (DISTRICT) PROJECT 1. CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL NOT START UNTIL A PRE-CONSTRUCTION MEETING HAS BEEN 19. NO DISRUPTION TO EXISTING WATER DISTRIBUTION MAINS WILL BE ALLOWED ON MONDAYS OR FRIDAYS.
A
SPECIFICATIONS AND THE MOST RECENT EDITIONS OF THE FOLLOWING DOCUMENTS: (1) SAN DIEGO WATER HELD IN ACCORDANCE WITH WAS SPECIFICATION 01000. ALL SHUTDOWNS FOR SYSTEM TIE-INS WILL BE SCHEDULED ON TUESDAY, WEDNESDAY, OR THURSDAY.
AGENCIES' STANDARDS (WAS), (2) SAN DIEGO REGIONAL STANDARD DRAWINGS (SDRSD), (3) STANDARD SHUTDOWNS WILL BE CONFINED TO 8:30AM-4PM, UNLESS FURTHER RESTRICTED BY THE DISTRICT OR
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK), AND (4) COUNTY OF SAN DIEGO 2. UNLESS EXPLICITLY CALLED OUT DIFFERENTLY ON THE APPROVED PLANS AND SPECIFICATIONS, ALL OTHER PERMITTING AGENCIES DUE TO SITE-SPECIFIC CONDITIONS.
REGIONAL SUPPLEMENT AMENDMENTS. CONSTRUCTION SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SAN DIEGO WATER AGENCIES' STANDARDS
(WAS). CURRENT WAS REQUIREMENTS CAN BE FOUND AT WWW.SDWAS.ORG 20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING THE PIPELINE AND LEGALLY DISPOSING OF,
2. ALL WORK WITHIN THE SAN DIEGO COUNTY RIGHT OF WAY SHALL BE GOVERNED BY THE WORK HOURS AND DECHLORINATING WATER AS NECESSARY TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL
STIPULATED IN PERMITS AND CONSISTENT WITH DISTRICT REQUIREMENTS. 3. CONTRACTOR SHALL POSSESS A CLASS 'A' CONTRACTOR'S LICENSE FOR WORK ON WATER AND SEWER PIPELINE REGULATIONS REGARDING STORM WATER AND NON-STORM WATER DISCHARGE.
INSTALLATIONS IN CONFORMANCE WITH THE CALIFORNIA CONTRACTOR'S LICENSE LAW AND WAS
3. ALL EXISTING UTILITIES INDICATED ON THE DRAWINGS ARE SHOWN DIAGRAMMATICALLY AND ARE BASED ON SPECIFICATION 01000. 21. THE DISTRICT DOES NOT GUARANTEE A 100% WATERTIGHT SHUTDOWN OF THE EXISTING DISTRICT
FIELD RESEARCH AND AVAILABLE, AS-BUILT DRAWINGS AND FACILITY MAPS. THE CONTRACTOR SHALL DISTRIBUTION SYSTEM AND VALVES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HANDLING,
POTHOLE AND VERIFY THE SIZE, MATERIAL AND HORIZONTAL & VERTICAL LOCATION, BEARING, AND 4. CONTRACTOR SHALL GUARANTEE ALL WORK FOR 1 YEAR AFTER DATE OF NOTICE OF COMPLETION FILED BY THE REMOVING OR WORKING WITH NUISANCE WATER THAT MAY RESULT FROM THE EXISTING DISTRICT
INCLINATION OF ALL EXISTING UTILITIES PRIOR TO ANY DEMOLITION WORK OR INSTALLATION OF NEW DISTRICT AND SHALL REPAIR OR REPLACE ANY OR ALL SUCH WORK, TOGETHER WITH ANY OTHER WORK WHICH DISTRIBUTION SYSTEM.
WORK. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES MAY BE IMPACTED AT NO COST TO THE DISTRICT.
OR STRUCTURES AT THE WORK SITE WHETHER THEY ARE SHOWN ON THE DRAWINGS OR NOT. THE ACTUAL 22. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN, AT ALL TIMES DURING CONSTRUCTION, AMPLE MEANS
LOCATION AND DEPTH OF ALL EXISTING WATER LINES AND CONNECTION POINTS ARE TO BE VERIFIED 5. THE DISTRICT SHALL RECEIVE A CONSTRUCTION SCHEDULE FROM THE CONTRACTOR PRIOR TO START OF AND DEVICES TO PROMPTLY REMOVE AND PROPERLY DISPOSE OF ALL WATER FROM ANY SOURCE
B (EXCAVATED) PRIOR TO COMMENCEMENT OF WORK, AND ANY DISCREPANCY IS TO BE BROUGHT TO THE CONSTRUCTION IN ACCORDANCE WITH WAS SPECIFICATION 01000. WORK DONE WITHOUT DISTRICT INSPECTION ENTERING THE EXCAVATIONS OR OTHER PARTS OF THE WORK.
ATTENTION OF THE DISTRICT AND THEN SUBMITTED TO THE DISTRICT FOR REVIEW AND APPROVAL PRIOR TO SHALL BE SUBJECT TO REMOVAL.
COMMENCEMENT OF WORK. EXPLORATORY EXCAVATIONS AND POTHOLES SHALL BE SCHEDULED AND 23. UTILITY SEPARATION REQUIREMENTS (HORIZONTAL AND VERTICAL) SHALL BE PER THE DEPARTMENT OF
COMPLETED SUFFICIENTLY AHEAD OF CONSTRUCTION AND PRIOR TO FABRICATION OF MATERIALS TO ALLOW 6. THE CONTRACTOR SHALL NOTIFY THE DISTRICT 72 HOURS IN ADVANCE FOR INSPECTION. DRINKING WATER (DDW) AND APPROVED BY THE DISTRICT.
FOR DESIGN REVISIONS, IF NECESSARY.
7. ALL TESTING AND CERTIFICATIONS REQUIRED FOR THIS PROJECT SHALL BE THE RESPONSIBILITY OF THE 24. CONTRACTOR TO PROVIDE APPROVED MATERIAL SUBMITTALS PRIOR TO INSTALLATION. CONTRACTOR TO
4. STATIONS, COORDINATES, AND RADII REFER TO THE HORIZONTAL CENTER OF THE PIPE. CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF ALL TESTING. THIS INCLUDES HAVE ALL MATERIAL INSPECTED BY THE DISTRICT INSPECTOR PRIOR TO THE START OF CONSTRUCTION. ALL
COMPACTION TESTING, DISINFECTION TESTING, CONCRETE TESTING, AND/OR ANY OTHER TESTING MATERIAL SHALL BE NEW.
5. WHEN CROSSING UNDER UTILITIES, THE CONTRACTOR SHALL PROVIDE, TO THE SATISFACTION OF THE REQUIREMENTS ASSOCIATED WITH THIS PROJECT. TESTING SHALL BE COMPLETED IN ACCORDANCE WITH WAS
ENGINEER, DISTRICT INSPECTOR, AND THE UTILITY OWNER, THE PROPOSED METHOD OF SUPPORT OF THE OR OTHER APPLICABLE STANDARDS. ALL TESTING AND PROVISION OF TESTING RESULTS SHALL BE COORDINATED 25. THE CONTRACTOR SHALL FURNISH ALL NEW WATER METER BOXES, PER DISTRICT REQUIREMENTS. NEW
UTILITY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE EVERY MEASURE NECESSARY TO CLOSELY WITH THE DISTRICT INSPECTOR. DISTRICT INSPECTOR SHALL BE RESPONSIBLE FOR REVIEWING AND METERS SHALL BE FURNISHED AND INSTALLED BY THE DISTRICT.
PROTECT THE UTILITY IN PLACE. ANY FAILURE OF THE UTILITY DUE TO THE CONTRACTOR'S OPERATION SHALL APPROVING ALL TEST RESULTS.
BE REPAIRED TO THE SATISFACTION OF THE ENGINEER, DISTRICT INSPECTOR, AND THE UTILITY OWNER AT 26. FOR WORK OVER EXISTING FACILITIES, HEAVY EQUIPMENT (ABOVE H2O LOADING) SHALL NOT BE USED
THE CONTRACTOR'S EXPENSE. 8. DISINFECTION OF WATER MAINS SHALL BE IN ACCORDANCE WITH WAS AND SHALL BE WITNESSED BY THE WHEN COVER OVER THE WATER MAIN IS LESS THAN 36" THROUGH ALL PHASES OF CONSTRUCTION,
DISTRICT AT THE TIME OF THE SAMPLING. INCLUDING THE REMOVAL, OVER EXCAVATION, AND/OR INSTALLATION OF PAVEMENT SECTIONS,
6. NEITHER THE ENGINEER NOR THE DISTRICT SHALL BE RESPONSIBLE FOR THE ENFORCEMENT OF SAFETY WITHOUT THE WRITTEN APPROVAL OF THE DISTRICT.
C
STANDARDS. CONTRACTOR ACKNOWLEDGES CONTINUOUS RESPONSIBILITY FOR JOB SAFETY THROUGHOUT 9. ANY AND ALL REQUIRED PERMITS SHALL BE PROCURED, PAID FOR, AND ADHERED TO BY THE CONTRACTOR, AND
THE DURATION OF THE PROJECT. SAID RESPONSIBILITY SHALL BE CONTINUOUS AND NOT LIMITED TO THIS INCLUDES TRAFFIC CONTROL, EXCAVATION, AND ALL OTHER PERMITS . INCLUDED IN THE PROJECT BID 27. EXISTING WATER FACILITIES SHALL BE KEPT IN SERVICE DURING CONSTRUCTION. HIGHLINING MAY BE
NORMAL WORK HOURS. ASSOCIATED WITH THIS PROJECT. REQUIRED AND SHALL BE INSTALLED ACCORDING TO WAS WHICH WILL REQUIRE AN APPROVED
SUBMITTAL. ABSOLUTELY NO CUTTING OR FILLING WILL BE ALLOWED OVER EXISTING FACILITIES UNTIL
7. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR COMPLETE, SAFE, AND ADEQUATE TRAFFIC CONTROL 10. THE CONTRACTOR SHALL POTHOLE ALL TIE-IN AND POTENTIAL CONFLICT LOCATIONS BEFORE EXCAVATION. ANY FACILITIES HAVE BEEN EITHER RELOCATED, DISINFECTED, AND TESTED OR HIGHLINED, DISINFECTED, AND
AND SHALL PROVIDE AND MAINTAIN ALL NECESSARY EQUIPMENT, SIGNING, PERSONNEL, AND ANYTHING DISCREPANCIES WITH THE APPROVED PLANS (E.G. PIPE MATERIAL, SIZE OR LOCATION) SHALL BE BROUGHT TO TESTED. ANY WATER LATERALS DAMAGED OR DESTROYED DURING CONSTRUCTION WILL BE REPAIRED OR
ELSE NECESSARY FOR TRAFFIC CONTROL AS IS REQUIRED BY THE AGENCY HAVING JURISDICTION OR AS MAY THE ATTENTION OF THE DISTRICT INSPECTOR PRIOR TO PROCEEDING. POTHOLING SHALL BE COMPLETED BEFORE REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. ALL EXISTING WATER SERVICES AND
OTHERWISE BE NECESSARY. THE CONTRACTOR SHALL ALSO FULLY COMPLY WITH THE REQUIREMENTS OR THE DISTRICT WILL SCHEDULE A SHUTDOWN. APPROVAL OF THIS PLAN BY THE DISTRICT DOES NOT CONSTITUTE APPURTENANT CONNECTIONS SHALL BE RECONNECTED TO THE NEW PIPELINE WHETHER SHOWN ON THE
RECOMMENDED TRAFFIC AND PEDESTRIAN CONTROL PROCEDURES IN ACCORDANCE WITH THE CALIFORNIA A REPRESENTATION AS TO THE ACCURACY OF THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY PLANS OR NOT.
DEPARTMENT OF TRANSPORTATION, "MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND UNDERGROUND UTILITY, PIPE, OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT.
MAINTENANCE WORK ZONES," LATEST EDITION AND THE W.A.T.C.H. MANUAL. IN ADDITION, FLAG MEN 28. SACRIFICIAL ANODES SHALL BE INSTALLED ON ALL COPPER TUBING PER WAS WC-17 AND SPECIFICATION
SHALL BE STATIONED BY THE CONTRACTOR ON ALL CONSTRUCTION SITES WHERE TRAFFIC TRAVELS IN BOTH 11. A MINIMUM OF TWO (2) WORKING DAYS PRIOR TO EXCAVATION, VERIFY LOCATIONS OF UNDERGROUND 13110.
DIRECTIONS USING THE SAME LANE. UTILITIES. THE CONTRACTOR IS REQUIRED TO CALL DIG ALERT: 811
29. WHERE APPURTENANCES CANNOT BE INSTALLED PERPENDICULAR TO THE MAIN, TRACER WIRE SHALL BE
8. STRIPING DESTROYED DURING CONSTRUCTION SHALL BE REPLACED IN-KIND BY THE CONTRACTOR AT THE 12. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6205 BY SUBMITTING A DETAILED PLAN SHOWING INSTALLED FROM THE MAIN TO THE METER BOX, AS DIRECTED BY DISTRICT INSPECTOR.
D CONTRACTOR'S EXPENSE. TRAFFIC STRIPES AND PAVEMENT MARKINGS SHALL NOT BE APPLIED OVER THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE FOR WORK PROTECTION
EXISTING STRIPES THAT ARE TO BE REMOVED. EXISTING STRIPES SHALL BE FIRST REMOVED BY SANDBLASTING FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING 30. THE CONTRACTOR SHALL INSTALL INSULATED TRACER WIRE AND WARNING/IDENTIFICATION TAPE PER
BEFORE ANY NEW APPLICATION. THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR MORE IN WAS SPECIFICATION 15000 AND WP-01.
DEPTH AND APPROVED BY THE OWNER PRIOR TO EXCAVATION. IF PLAN VARIES FROM THE SHORING SYSTEM
9. ALL EXISTING IMPROVEMENTS INCLUDING CURB AND GUTTERS, SIDEWALKS, TRAFFIC LOOPS, ASPHALT STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLAN SHALL BE PREPARED BY A 31. CONTRACTOR IS RESPONSIBLE FOR PROPER HANDLING, STORAGE, AND DISPOSAL OF ASBESTOS CEMENT
CONCRETE OR PCC PAVING, WHICH ARE DAMAGED BY CONSTRUCTION OR ARE BEING JOINED OR MATCHED REGISTERED CIVIL ENGINEER OR STRUCTURAL ENGINEER AT THE CONTRACTOR'S EXPENSE. PIPE (ACP) IN CONFORMANCE WITH WAS SPECIFICATION 15000.
IN CONNECTION WITH THIS PROJECT, SHALL BE REPLACED, JOINED OR MATCHED IN A MANNER
SATISFACTORY TO THE DISTRICT ENGINEER PRIOR TO FINAL ACCEPTANCE, INCLUDING NECESSARY SAW 13. FINAL STREET SUB-GRADE SHALL BE ESTABLISHED PRIOR TO EXCAVATION OF PIPELINE TRENCHES, AND MINIMUM 32. ALL PIPE TO BE CL-305 PVC (C-900) DR14 IN ACCORDANCE WITH WAS SPECIFICATION 15064 UNLESS
CUTTING, REMOVAL AND REPLACEMENT. COVER OVER/ABOVE PIPE SHALL BE 24-INCHES FOR HYDROTESTING PER WAS SPECIFICATION 02223. OTHERWISE APPROVED BY THE DISTRICT.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MONUMENTATION AND/OR BENCHMARKS WHICH WILL 14. CONTRACTOR TO PROVIDE CONSTRUCTION STAKING AND THREE (3) SETS OF CUT SHEETS TO THE DISTRICT 33. ALL PVC PIPE DEFLECTIONS (HORIZONTAL AND VERTICAL) SHALL BE MADE BY USE OF DUCTILE IRON
BE DISTURBED OR DESTROYED BY CONSTRUCTION. SUCH POINTS SHALL BE REFERENCED AND REPLACED WITH INSPECTOR 24 HOURS PRIOR TO EXCAVATING. FITTINGS OR HIGH DEFLECTION JOINT COUPLINGS WITH A 4 DEGREE MAXIMUM DEFLECTION PER
APPROPRIATE MONUMENTATION BY A LICENSED LAND SURVEYOR OR A REGISTERED CIVIL ENGINEER COUPLING (2 DEGREE PER JOINT). NO BENDING (CURVING) OF PVC PIPE SHALL BE PERMITTED.
AUTHORIZED TO PRACTICE LAND SURVEYING. A CORNER RECORD OR RECORD OF SURVEY, AS APPROPRIATE, 15. THE CONTRACTOR SHALL STAKE THE LOCATIONS OF NEW PIPELINES AND APPURTENANCES (INCLUDING WATER
SHALL BE FILED BY THE LICENSED LAND SURVEYOR OR REGISTERED CIVIL ENGINEER AS REQUIRED BY THE METERS) AND THE RIGHT-OF-WAY OR EASEMENTS PRIOR TO THEIR INSTALLATION. THE CONTRACTOR SHALL 34. ALL PIPE SHALL HAVE A MINIMUM 6" BEDDING THICKNESS AS SHOWN ON WAS WP-02. PIPE ZONE
LAND SURVEYOR'S ACT. THE CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTS THAT ARE PROVIDE AN AS-BUILT SURVEY FOR NEW PIPELINES AND APPURTENANCES. PROVIDE ALL SURVEY DATA MATERIAL SHALL CONFORM TO THE GRADATION IDENTIFIED IN WAS SPECIFICATION 02223.
E
LOCATED WITHIN 10 FEET OF THE CENTERLINE OF CONSTRUCTION BY COVERING THE MONUMENTS WITH (COORDINATES AND ELEVATIONS) CONFORMING TO THE SURVEY CONTROL SYSTEM USED FOR THE DESIGN
1-INCH THICK STEEL PLATE DURING EXCAVATION AND BACKFILL OPERATIONS OR SHALL EMPLOY SURVEY IN AUTOCAD 2018 OR MORE RECENT FORMAT. THE SURVEY SHALL INCLUDE AN AS-BUILT SURVEY OF ALL 35. ALL VALVES INSTALLED SHALL BE HOLIDAY-FREE GATE VALVES, IN ACCORDANCE WITH WAS, UNLESS
ALTERNATIVE PROTECTION MEASURES NECESSARY TO AVOID DISTURBANCE OR DAMAGE TO THE NEW IMPROVEMENTS, INCLUDING, BUT NOT LIMITED TO, VALVE CORNERS, AIR VALVE ENCLOSURES, BLOW OFF OTHERWISE NOTED ON THE PLANS. CONTRACTOR SHALL PAINT ALL VALVE CAN LIDS PER THE DISTRICT'S
MONUMENTS. ALTERNATIVE PROTECTION MEASURES SHALL BE SUBMITTED FOR DISTRICT REVIEW AND VALVES, PIPELINES, FITTINGS ON PIPELINES AND CONNECTION POINTS TO EXISTING PIPELINES. COLOR CODE.
APPROVAL IN ACCORDANCE WITH [LIST "SUBMITTALS" TECH SPEC NUMBER]. THE CAP OF ANY MONUMENT
WITHIN THE WORK AREA SHALL BE RAISED TO MATCH FINISHED GRADE. 16. NO PERSONS, OTHER THAN AN EMPLOYEE OR AGENT OF THE DISTRICT, SHALL HAVE A RIGHT TO OPERATE ANY 36. PRIOR TO INSTALLATION OF ALL EPOXY COATED MATERIALS, CONTRACTOR SHALL PERFORM HOLIDAY FREE
PART OF THE DISTRICT'S DISTRIBUTION SYSTEM. THE CONTRACTOR SHALL NOT OPERATE ANY VALVES, BUT SHALL TESTING AND PROVIDE SPECIFIC DOCUMENTATION TO THE DISTRICT INSPECTOR.
11. CONTRACTOR SHALL NOTIFY THE SANTA FE IRRIGATION DISTRICT PRIOR TO COMMENCING ANY WORK IN THE REQUEST THAT THE DISTRICT INSPECTOR CONTACT THE DISTRICT TO SCHEDULE VALVE OPERATION BY THE
TIME REQUIREMENTS INDICATED IN THE SPECIFICATIONS. CONTRACTOR SHALL ALSO NOTIFY THE FOLLOWING DISTRICT. ONCE THE NEW IMPROVEMENT IS CONNECTED TO THE EXISTING DISTRIBUTION SYSTEM, ALL VALVES 37. CONTRACTOR SHALL PRIME, WAX TAPE, AND PLASTIC WRAP ALL FITTINGS PER WAS SPECIFICATION 13110.
AGENCIES 48 HOURS PRIOR TO COMMENCING ANY WORK: ON THE NEW SYSTEM SHALL ONLY BE OPERATED BY THE DISTRICT. FOLLOWING INSTALLATION OF WAX TAPE, CONTRACTOR TO PROVIDE POLYETHYLENE ENCASEMENT FOR
ALL FERROUS METAL MATERIAL. THIS INCLUDES, BUT IS NOT LIMITED TO, VALVES, COUPLINGS, AND
SANTA FE IRRIGATION DISTRICT 858-756-2424 17. THE CONTRACTOR SHALL NOTIFY THE DISTRICT OF THE SCHEDULE FOR ISOLATING LINES AT THE FITTINGS.
PRE-CONSTRUCTION MEETING AND AT LEAST 14 CALENDAR DAYS PRIOR. THIS TIME IS REQUIRED TO PROVIDE
COUNTY OF SAN DIEGO, DEPT. PUBLIC WORKS 1-800-422-4133
ADEQUATE NOTIFICATION TO CUSTOMERS AND SCHEDULE DISTRICT O&M RESOURCES TO ACCOMMODATE 38. CONTRACTOR SHALL PAINT ALL POTABLE WATER FACILITIES PER WAS SPECIFICATION 09910. THE
ORION CABLE 760-591-9600
PLANNED SHUTDOWNS. DISTRICT'S SPECIFIC COLOR CODE TO BE PROVIDED TO THE AWARDED CONTRACTOR.
F AT&T (FORMERLY PAC BELL) , TELEPHONE 1-800-811-5238
SAN DIEGO GAS & ELECTRIC COMPANY 1-800-581-7138 18. CONTRACTOR TO PROVIDE THE DISTRICT A 14-DAY ADVANCED NOTICE TO SCHEDULE SHUTDOWN. FINAL 39. VALVES SHALL HAVE A MINIMUM OF 1.5' OF COVER FROM THE TOP OF NUT/OPERATOR TO GROUND
UNDERGROUND SERVICE ALERT 1-800-227-2600 OR 811 SHUTDOWN DATE DETERMINED BY THE DISTRICT. SURFACE. IF LESS THAN THIS EXISTS, IT SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION.
RANCHO SANTA FE FIRE DEPARTMENT 858-756-5971
SEE SHEET 03 FOR CONTINUATION OF WATER NOTES
NORTH COUNTY TRANSIT DISTRICT (866) 735-2929
NO. DESCRIPTION DATE APPR DESIGNED BY: OWNER PREPARED UNDER CIVIL VERIFY SCALES SANTA FE IRRIGATION DISTRICT CI P N O . J-2501
SANTA FE IRRIGATION DISTRIC
A
T DAM HOC
H S
T
U
H
P
E
E
D
R
I
V
R
I
E
S
C
IO
T
N OF:
HOCH CONSULTING
BAR IS ONE INCH ON
LA GRANADA PIPELINE REPLACEMENT & PRS ELIMINATION PROJECT
DRAWN BY: 5920 Linea Del Cielo H 804 Pier View Way - Suite 1 O 0 RI 0 GINAL DRAWING DRAWING NO.
C 77635 0 1 G-02
Rancho Santa Fe, CA 92067 Oceanside, CA 92054
EXP 6/30/27 C GENERAL NOTES & WATER NOTES
CHECKED BY: (858) 756-2424 www.hochconsulting.com IF NOT ONE INCH ON
03-04-26 SHEET NO.
THIS SHEET, ADJUST
DATE SCALES ACCORDINGLY 02 OF 17

WATER NOTES (CONT.) EROSION CONTROL NOTES LEGEND 40. DUCTILE IRON FITTINGS SHALL BE IN ACCORDANCE WITH WAS SPECIFICATION 15056. BURIED EXISTING PROPOSED WAS STD DWG QUANTITIES 1. IN CASE OF EMERGENCY CALL: _________________ WORK TELEPHONE NO.: ______________________ DUCTILE IRON PIPE, FITTINGS AND VALVES SHALL BE ENCASED IN TWO (2) LAYERS OF NAME HOME TELEPHONE NO.: ______________________ POLYETHYLENE PER WAS. 50 EX INDEX CONTOUR W WATER/FIRE SERVICE CONNECTION WS-01 / WS-02/ 36 EA (SIZE PER DWGS) WC-17/WR-01/WS-07 EX INTERMEDIATE CONTOUR 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES 41. JOB MIXING OF CONCRETE WILL NOT BE ALLOWED WITHOUT THE PRIOR PERMISSION OF THE DISTRICT. DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND EX RIGHT-OF-WAY FIRE HYDRANT WF-01 11 EA STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY WATER VALVE WV-01 21 EA EX WATER SERVICE 42. THRUST BLOCKS SHALL HAVE A CURE TIME IN ACCORDANCE WITH WAS SPECIFICATION 03000. A DEVICES WHEN RAIN IS IMMINENT. (SIZE PER DWGS & EXCLUDES FH ASSY) CYLINDER TEST SHALL BE COMPLETED FOR EACH BATCH OF CONCRETE DELIVERED TO THE SITE AND EX FIRE HYDRANT 3. EROSION CONTROL DEVICES SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE BLOWOFF WB-01 11 EA TESTED AFTER THE MINIMUM CURE TIME. IF CONCRETE CYLINDER FAILS TO MEET COMPRESSIVE EX WATER VALVE DISTRICT ENGINEER. MANUAL AIR VALVE WA-01 4 EA STRENGTH, ALL THRUST/ANCHOR BLOCKS POURED FROM THE BATCH SHALL BE REMOVED AND EX BACKFLOW PREVENTER REPLACED. CONCRETE ACCELERATORS MAY BE USED IN CONFORMANCE WITH ASTM C-494. COMBINATION AIR VALVE WA-02 2 EA 4. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH CALCIUM CHLORIDE MAY NOT BE USED UNDER ANY CIRCUMSTANCE. WORKING DAY WHEN THE 5-DAY RAIN PROBABILITY FORECAST EXCEEDS 40%. EX WATER PIPELINE 11+00 WATER PIPELINE (SIZE PER DWGS) WP-01/WP-02 7321 LF 43. THRUST BLOCK AREAS ARE BASED ON SOIL BEARING VALUES LISTED IN WAS (SEE WAS STANDARD EX POWER POLE WATER PIPELINE ABANDONMENT WP-03 6066 LF 5. AFTER A RAINSTORM ALL SILT AND DEBRIS SHALL BE REMOVED FROM STREETS. CHECK BERMS (SIZE PER DWGS) DRAWING WT-01). SHOULD FIELD CONDITIONS INDICATE A LESSER SOIL BEARING CAPACITY THAN EX STREET LIGHT AND BASINS. LISTED, THE CONTRACTOR SHALL NOTIFY THE DISTRICT INSPECTOR. THRUST BLOCKS SHALL NOT BE BASIS OF BEARINGS PB EX PULLBOX INSTALLED UNTIL A NEW THRUST BLOCK SIZE HAS BEEN DETERMINED BY THE ENGINEER OF WORK 6. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM THE FACE OF AND APPROVED BY DISTRICT ENGINEERING STAFF. ANY EXISTING THRUST BLOCKS DAMAGED T EX TELEPHONE RISER SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE TO BE DIRECTED TOWARD THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM, DURING CONSTRUCTION SHALL BE REPAIRED TO MATCH EXISTING CONDITION/SIZE. DESILTING FACILITIES. EX SEWER MANHOLE CCS83, ZONE 6, EPOCH 2007.00 AND IS DETERMINED BY G.P.S. MEASUREMENTS TAKEN ON MAY 1, 2025 G.P.S. STATIONS 1069 AND 1087 AS SHOWN ON ROS 24647. 44. CONTRACTOR TO PROVIDE SOIL TECHNICIAN FOR ALL INSPECTION OF BACKFILL AND COMPACTION SCO EX SEWER CLEANOUT 7. THE PERMITTEE SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT TO WAS FOR TRENCH BACKFILL. SOILS REPORT ON ALL BACKFILL SHALL BE SUBMITTED TO THE I.E. N 24 degrees00'42" E PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATES A HAZARDOUS CONDITION. EX SEWER PIPELINE DISTRICT BY THE QUALIFIED SOILS ENGINEER OF RECORD, CERTIFYING BACKFILL COMPACTION PER THE SOILS ENGINEER IN ACCORDANCE WITH ALL COMPACTION REQUIREMENTS. EX STORM DRAIN PIPELINE BENCHMARK 8. ALL TEMPORARY GRADING HAUL ROADS WITHIN AREAS WHICH ARE TO REMAIN UNDEVELOPED AND NATURAL SHALL BE RESTORED TO NATURAL CONDITIONS AND REVEGETATED WITH NATIVE EX TREE 45. ABANDONED PIPELINES SHALL BE CUT AND PLUGGED AT THE ENDS AND AT APPROPRIATE CITY OF ENCINITAS BENCHMARK ENC-45. (2.5" CITY OF ENCINITAS BRASS DISC IN GRASSES UPON COMPLETION OF GRADING OPERATIONS. INTERVALS PER WAS STANDARD DRAWING WP-03. IN ADDITION, ALL GATE WELLS NEED TO BE EX SIGN WESTERLY CORNER OF CONCRETE DROP INLET, EAST SIDE OF STONEBRIDGE LANE AND COMPLETELY REMOVED, BACKFILLED AND SURFACE RESTORED. 450 FEET WEST OF EL CAMINO REAL.) 9. ALL CONSTRUCTION VEHICLES OR EQUIPMENT, FIXED OR MOBILE OPERATED WITHIN 1000' OF A EX SURVEY MONUMENT ELEV = 24.841 (NAVD 88) DWELLING SHALL BE EQUIPPED WITH PROPERLY OPERATING AND MAINTAINED MUFFLERS. 46. NO CONNECTIONS FOR THE PURPOSE OF OBTAINING WATER SUPPLY DURING CONSTRUCTION (PER RECORD OF SURVEY 18416) ABBREVIATIONS SECTION & DETAIL SHALL BE MADE TO ANY FIRE HYDRANT OR OTHER APPURTENANCE WITHOUT FIRST OBTAINING 10. ALL OPERATIONS SHALL COMPLY WITH SAN DIEGO COUNTY CODIFIED ORDINANCE DIVISION 6 (NOISE WRITTEN AUTHORIZATION FROM THE DISTRICT. THE CONTRACTOR SHALL OBTAIN A TEMPORARY CONTROL). IDENTIFICATION CONSTRUCTION METER FOR THE PURCHASE OF CONSTRUCTION WATER. @ AT MIN MINIMUM 11. STOCKPILING AND/OR VEHICLE STAGING AREAS SHALL BE LOCATED AS FAR AS PRACTICABLE ACP ASBESTOS CEMENT PIPE MJ MECHANICAL JOINT 47. DEVIATIONS FROM THE APPROVED WATER PIPELINE PLANS SHALL NOT BE ALLOWED WITHOUT FROM DWELLINGS. AHD AHEAD MOD MODIFIED WRITTEN APPROVAL BY THE ENGINEER OF WORK AND THE DISTRICT. THE CONTRACTOR SHALL MAINTAIN REDLINE DRAWINGS SHOWING ANY CONSTRUCTION CHANGES. CONTRACTOR SHALL APPROX APPROXIMATE N NORTHING DETAIL NUMBER 12. EROSION CONTROL DEVICES WILL BE MODIFIED AS NEEDED AS THE PROJECT PROGRESSES, AND KEEP A SET OF REDLINE AS-BUILTS ON THE SITE AT ALL TIMES PER WAS SPECIFICATION 01000 AND ASSY ASSEMBLY NC NORMALLY CLOSED PLANS OF THESE CHANGES SUBMITTED FOR PLAN CHECK AS REQUIRED. UPDATE DAILY. FAILURE TO MAINTAIN FIELD AS-BUILTS ARE GROUNDS FOR JOB SHUTDOWN OR NO BC BEGINNING OF CURVATURE NG NATURAL GROUND 1 INSPECTIONS BY THE DISTRICT UNTIL AS-BUILTS ARE CURRENT. AT THE COMPLETION OF THE WORK, BK BACK OD OUTSIDE DIAMETER 13. THE PLACEMENT OF ADDITIONAL DEVICES TO REDUCE EROSION DAMAGE WITHIN THE SITE IS LEFT C-10 THE CONTRACTOR SHALL FURNISH REDLINES TO THE DISTRICT INSPECTOR FOR INCORPORATION TO THE DISCRETION OF THE FIELD ENGINEER. BO BLOWOFF PCC PORTLAND CEMENT CONCRETE / INTO AS-BUILT DRAWINGS. CL CENTERLINE, CLASS POINT OF COMPOUND CURVATURE DRAWING ON WHICH 14. THE DISTRICT ENGINEER OR ENGINEERS REPRESENTATIVE SHALL OBSERVE EROSION CONTROL WORK AND WILL CLR CLEAR PE PLAIN END 48. ALL UNDERGROUND UTILITIES AND LATERALS SHALL BE INSTALLED BEFORE CONSTRUCTION OF DETAIL APPEARS INFORM THE CITY AND THE CONTRACTOR IF THE WORK IS NOT IN ACCORDANCE WITH THE APPROVED PLAN. CURBS, CONCRETE CROSS GUTTERS, OR SURFACING OF STREETS. CONC CONCRETE PED PEDESTRIAN CML&C CEMENT MORTAR LINED & COATED PH POTHOLE 49. THE CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR RELOCATION OR ADJUSTMENT OF ANY COUNTY OF SAN DIEGO NOTES CP CATHODIC PROTECTION PRC POINT OF REVERSING CURVATURE NEW OR EXISTING WATER SERVICE APPURTENANCES, MANHOLES, GATE VALVES COVERS, OR CPLG COUPLING PROP PROPOSED METER BOXES TO NEW FINISHED GRADE BY THE DISTRICT. DETAIL NUMBER 1. TRAFFIC CONTROL PERMIT, EXCAVATION PERMIT, AND LINEAR UNDERGROUND/OVERHEAD PROJECTS (LUP) DBL DOUBLE PVC POLYVINYL CHLORIDE DETERMINATION FOR WORK WITHIN THE COUNTY OF SAN DIEGO SHALL BE APPLIED FOR BY THE DEFL DEFLECTION PVMT PAVEMENT 50. PROJECT WILL NOT BE ACCEPTED UNTIL ROAD IS RESTORED TO ITS ORIGINAL CONDITION OR CONTRACTOR. DETAIL TITLE 1 BETTER, OR TO THE CONDITION SPECIFIED BY THE COUNTY OF SAN DIEGO. DET DETAIL RCB REINFORCED CONCRETE BOX DOM DOMESTIC RCP REINFORCED CONCRETE PIPE SCALE: C-10 PERMITTING NOTES 2. CONTRACTOR SHALL PREPARE AND SUBMIT TRAFFIC CONTROL PLANS TO THE COUNTY OF SAN DIEGO. TRAFFIC CONTROL PERMIT SHALL BE APPROVED AND EXCAVATION PERMIT SHALL BE ISSUED BY THE DRWY DRIVEWAY RED REDUCER 1. ANY AND ALL REQUIRED PERMITS SHALL BE PROCURED, PAID FOR, AND ADHERED TO BY THE COUNTY OF SAN DIEGO PRIOR TO THE START OF CONSTRUCTION. DWG DRAWING REST RESTRAINED DRAWING ON WHICH CONTRACTOR, AND THIS INCLUDES TRAFFIC CONTROL, EXCAVATION, AND ALL OTHER PERMITS . E EASTING REQ REQUIRED DETAIL IS REFERENCED INCLUDED IN THE PROJECT BID ASSOCIATED WITH THIS PROJECT. 3. CONTRACTOR SHALL MAINTAIN ALL WORK AREAS IN A NEAT, CLEAN, AND SAFE CONDITION AT ALL TIMES. EC END OF CURVATURE R/W RIGHT OF WAY DUST AND OTHER NUISANCES SHALL BE CONTROLLED AT ALL TIMES. AT THE CONCLUSION OF EACH DAY'S ECC ECCENTRIC RWGV RESILIENT WEDGE GATE VALVE WORK, ALL WORK AREAS AND ROADWAYS SHALL BE SWEPT CLEAN AND SHALL BE LEFT IN A NEAT, CLEAN 2. CAL-OSHA PERMIT IS REQUIRED FOR CONSTRUCTION IN TRENCHES THAT ARE FIVE FEET (5') OR ELEC ELECTRICAL RT RIGHT AND SAFE CONDITION SUITABLE FOR USE BY THE PUBLIC. DEEPER. THE CONTRACTOR SHALL SUBMIT A COPY OF SAID PERMIT TO THE DISTRICT ENGINEER EL ELEVATION SCO SEWER CLEANOUT SECTION LETTER PRIOR TO TRENCHING. 4. CONCRETE CURBS, GUTTERS, SIDEWALKS AND CROSS GUTTERS THAT ARE TRENCHED THROUGH DURING E'LY EASTERLY SD STORM DRAIN 3. A COUNTY OF SAN DIEGO ENCROACHMENT PERMIT IS REQUIRED FOR ALL WORK WITHIN THE CONSTRUCTION SHALL BE REMOVED AND REPLACED TO THE NEAREST EXPANSION JOINT OR SCORE MARK. EX EXISTING SDCO STORM DRAIN CLEANOUT A PUBLIC RIGHT-OF-WAY. THE PERMIT APPLICATION SHALL INCLUDE TRAFFIC CONTROL PLANS FOR CONCRETE CURBS, GUTTERS AND SIDEWALKS SHALL BE REPAIRED IN ACCORDANCE WITH REGIONAL F FLANGE SDMH STORM DRAIN MANHOLE C-10 STANDARD DRAWING G-11. EDGES OF EXISTING CROSS GUTTERS SHALL BE PINNED TO NEW CONCRETE ALL PHASES AND COMPONENTS OF THE PROJECT, INCLUDING, BUT NOT LIMITED TO, FH FIRE HYDRANT SDRSD SAN DIEGO REGIONAL STANDARD DRAWING WITH #4 REBAR, 6" DEEP, AT 12" O.C. POTHOLING, DEMOLITION AND ABANDONMENT, MAIN CONSTRUCTION, APPURTENANCES, FC FACE OF CURB SFID SANTA FE IRRIGATION DISTRICT FINAL CONNECTIONS, AND SURFACE IMPROVEMENTS. DRAWING ON WHICH FCA FLANGE COUPLING ADAPTER SHT SHEET 5. WHEN THE EDGE OF A NEW WATER MAIN TRENCH IS WITHIN FOUR (4) FEET OF THE EDGE OF THE EXISTING SECTION IS SHOWN TRAFFIC CONTROL NOTES FL FLOWLINE SMH SEWER MANHOLE PAVEMENT, NEW PAVEMENT SHALL BE PLACED TO THE EDGE OF THE EXISTING PAVEMENT PER DESIGN STANDARD DS-22. THIS ADDITIONAL PAVING SHALL BE INCLUDED IN THE UNIT PRICE BID FOR MAINLINE FM FORCE MAIN STD STANDARD 1. TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR FOR HIS WORK. TRAFFIC CONTROL PIPING. FO FIBER OPTIC STL STEEL SHALL CONFORM TO THE CALTRANS TRAFFIC MANUAL, TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE, AND THE REGIONAL STANDARD DRAWINGS. THE CONTRACTOR SHALL FS FINISH SURFACE/FIRE SERVICE SWR SEWER SECTION LETTER 6. ALL STRIPING, DELINEATORS, AND OTHER SURFACE PAVEMENT MARKINGS OBLITERATED OR DAMAGED BY SUBMIT A TRAFFIC CONTROL PLAN TO THE COUNTY OF SAN DIEGO AND RECEIVE COUNTY GB GRADE BREAK TB THRUST BLOCK CONSTRUCTION SHALL BE REPLACED TO THE SATISFACTION OF THE AGENCY OF JURISDICTION. APPROVAL FOR TRAFFIC CONTROL THAT DIFFERS FROM THOSE PLANS INCLUDED IN THE GV GATE VALVE TG TOP OF GRATE A SECTION TITLE REGIONAL STANDARD DRAWINGS. HDPE HIGH DENSITY POLYETHYLENE TOT TOTAL 7. TRAFFIC LOOPS REMOVED OR DAMAGED BY CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE AGENCY OF JURISDICTION. HP HIGH POINT/HIGH PRESSURE TYP TYPICAL C-10 SCALE: 2. ADDITIONAL TRAFFIC CONTROL REQUIREMENTS SHALL BE IMPLEMENTED IF CONSTRUCTION INT INTERSECTION UNK UNKNOWN ACTIVITIES AFFECT THE BUSINESS OPERATIONS FOR THE R. ROGER ROWE MIDDLE SCHOOL. 8. EXACT DEPTHS OF SEWER LATERALS ARE UNKNOWN. THE CONTRACTOR SHALL ADJUST THE WATER MAIN IRRIG IRRIGATION VCP VITRIFIED CLAY PIPE DRAWING ON WHICH AS-BUILT NOTES PROFILE AS NECESSARY TO CLEAR CONFLICTING SEWER LATERALS. LF LINEAR FEET (W) WEST SECTION IS CUT 1. UPON COMPLETION, AND PRIOR TO RELEASING THE SECURITIES, THE ENGINEER OF WORK SHALL LN LANE W/ WITH 9. SEWER LATERALS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED IN ACCORDANCE WITH "AS-BUILT" THE ORIGINAL MYLAR PLANS. INITIALLY, TWO (2) COPIES OF RED-LINED PLANS SHOWING ALL LP LOW POINT WAS WATER AGENCY STANDARDS STANDARD DRAWING WM-07. AS-BUILT INFORMATION, INCLUDING, BUT NOT LIMITED TO, ALL NEW UNDERGROUND FACILITIES (MAIN LT LEFT W'LY WESTERLY LINES, SERVICES, AND LATERALS) SHALL BE SUBMITTED BY THE CONTRACTOR TO THE DISTRICT'S 10. EXCAVATIONS SHALL BE REPAIRED IN ACCORDANCE WITH THE EXCAVATION REPAIR DETAIL DRAWING(S) MAR MANUAL AIR RELEASE WS WATER SERVICE ENGINEERING DEPARTMENT. WHEN THE RED-LINES ARE APPROVED, THE ORIGINAL MYLAR PLANS WILL SHOWN HEREIN. MAX MAXIMUM WTR WATER BE CHECKED OUT TO THE ENGINEER OF WORK. THE ENGINEER OF WORK SHALL MAKE THE CHANGES, MH MANHOLE SIGN EACH SHEET UNDER "AS-BUILT", AND RETURN ORIGINAL MYLARS TO THE DISTRICT.
NO. DESCRIPTION DATE APPR DESIGNED BY: OWNER SANTA FE IRRIGATION DIST 5920 Linea Del Cielo Rancho Santa Fe, CA 92067 (858) 756-2424 PREPARED UNDER CIVIL RIC T DAM HOC T H E D I R E C T HOCH CONSULTIN A H S U P E R V I S IO N OF: H 804 Pier View Way - Suite C 77635 Oceanside, CA 92054 EXP 6/30/27 C www.hochconsulting.com 03-04-26 DATE VERIFY SCALES SANTA FE IRRIGATION DISTRICT CIP NO. J-2501
DRAWN BY: G BAR IS ONE INCH ON ORIGINAL DRAWING 100 0 1 IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY LA GRANADA PIPELINE REPLACEMENT & PRS ELIMINATION PROJECT WATER NOTES, MISCELLANEOUS NOTES, BASIS OF BEARINGS & BENCHMARK, LEGEND & ABBREVIATIONS DRAWING NO. G-03
CHECKED BY: SHEET NO. 03 OF 17
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:

City of Monrovia

Bid Due: 8/19/2026

RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and

City of Visalia

Bid Due: 9/03/2026

0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK

City of Los Angeles

Bid Due: 8/11/2026

RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL

County of San Diego

Bid Due: 8/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.