| Location: | Vermont |
|---|---|
| Posted: | Jul 17, 2026 |
| Due: | Aug 14, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Franklin Keywords: Engineering , Floodplain Delineation, Stream Restoration, Environmental Conservation Bid Description: The Franklin County Natural Resources Conservation District (FCNRCD) seeks proposals from engineering consultants regarding final design along the Trout River floodplain in Montgomery, VT, as part of the Final Design phase of a proposed floodplain restoration project overseen by FCNRCD; this project involves 3 distinct sites with 5 different landowners. For full RFP and attachments, please visit: https://www.franklincountynrcd.org/post/trout-river-floodplain-restoration-final-design-montgomery-vt-rfp
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Old Constitution House Window Restoration, Windsor, Vermont Request Date: 9/4/2026 10:49:28 AM... restoration ...
State Government of Vermont
Bid Due: 10/05/2026
..., grading, and associated site restoration. The intent of the Project is to ...
State Government of Vermont
Bid Due: 10/07/2026
...Restoration Plans. Grantees will be responsible for 20% of the total project cost. ...
State Government of Vermont
Bid Due: 10/09/2026
...required for municipal street repair, utility trench restoration, patches, parking lots, shoulders...
City of Winooski
Bid Due: 9/25/2026