NETC Cheraw Campus - Boiler/Chiller Upgrades

Location: South Carolina
Posted: Aug 12, 2026
Due: Sep 24, 2026
Agency: State of South Carolina - State Fiscal Accountability Authority(SFAA)
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: H59-6217-CB
Publication URL: To access bid details, please log in.
Project Name:
NETC Cheraw Campus - Boiler/Chiller Upgrades
Agency/Owner:
Northeastern Technical College
Ad Publish Date:
August 12, 2026
Project Number:
H59-6217-CB
# of Bid Copies:
1
Bid/Submittal Date & Time:
September 24, 2026 - 11:00am
Project Location:
Multiple Buildings
Project Delivery Method:
Design-Bid-Build
Construction Cost Range:
$1,250,000 to $1,400,000
Prime Contractor License (Special Standard of Responsibility):
N/A
Agency Project Coordinator:
Melissa Frank-Alston, Ph.D.
Email:
mfrank-alston@netc.edu
Telephone:
(843) 921-6901
Description:
Provide and install piping and power for owner provided and installed modular boiler/chiller plant and cooling tower. Connect piping from plant to existing piping serving three campus buildings.
Documents May Be Obtained From:
Email request to meca@mecainc.com. PDF documents will be provided.
Project Details:
https://scbo.sc.gov/files/scbo/SE-310_H59-6217-CB.pdf
Print Ad

Attachment Preview

SE-310
INVITATION FOR DESIGN-BID-BUILD CONSTRUCTION SERVICES
AGENCY: NETC - Northeastern Technical College
PROJECT NAME: NETC Cheraw Campus - Boiler/Chiller Upgrades
PROJECT NUMBER: H59-6217-CB
CONSTRUCTION COST RANGE: $1,250,000 to $1,400,000
PROJECT LOCATION: Multiple Buildings
DESCRIPTION OF PROJECT/SERVICES: (450 character limit)
Provide and install piping and power for owner provided and installed modular boiler/chiller plant and cooling tower.
Connect piping from plant to existing piping serving three campus buildings.
BID/SUBMITTAL DUE DATE: 09/24/2026
TIME: 11:00 AM
NUMBER OF COPIES: 1
PROJECT DELIVERY METHOD: Design-Bid-Build
PRIME CONTRACTOR LICENSE (SPECIAL STANDARD OF RESPONSIBILITY): (150 character limit)
N/A
AGENCY PROJECT COORDINATOR: Melissa Frank-Alston, Ph.D.
EMAIL: mfrank-alston@netc.edu
TELEPHONE: (843) 921-6901
DOCUMENTS OBTAINED FROM: Email request to meca@mecainc.com. PDF documents will be provided.
BID SECURITY IS REQUIRED IN AN AMOUNT NOT LESS THAN 5% OF THE BASE BID.
PERFORMANCE AND LABOR & MATERIAL PAYMENT BONDS: The successful Contractor will be required to
provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price.
DOCUMENT DEPOSIT AMOUNT: $0.00 IS DEPOSIT REFUNDABLE:
Yes
No
N/A
Bidders must obtain Bidding Documents/Plans from the above listed sources(s) to be listed as an official plan holder. Bidders that
rely on copies obtained from any other source do so at their own risk. All written communications with official plan holders &
bidders will be via email or website posting.
Agency WILL NOT accept Bids sent via email.
All questions & correspondence concerning this Invitation shall be addressed to the A/E.
A/E
NAME:
Mechanical
(MECA)
Engineering
Consulting
Assoc.
A/E CONTACT: Phil Claytor
EMAIL: meca@mecainc.com
TELEPHONE: (803) 765-9421
PRE-BID CONFERENCE:
Yes
No MANDATORY ATTENDANCE:
Yes
No
PRE-BID DATE: 08/27/2026
TIME: 11:00 AM
PRE-BID PLACE: NETC Cheraw Campus - 1201 Chesterfield Hwy, Cheraw
BID OPENING PLACE: NETC Cheraw Campus - 1201 Chesterfield Hwy, Cheraw
BID DELIVERY ADDRESSES:
HAND-DELIVERY:
MAIL SERVICE:
Attn: Melissa Frank-Alston, Ph.D.
Attn: Melissa Frank-Alston, Ph.D.
Northeastern Technical College
1201 Chesterfield Highway, Cheraw, SC 29520
Northeastern Technical College
1201 Chesterfield Highway, Cheraw, SC 29520
IS PROJECT WITHIN AGENCY CONSTRUCTION CERTIFICATION?
Yes
No
APPROVED BY:
(OSE PROJECT MANAGER)
DATE: 08/11/2026
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 9/29/2026

...Ad Title: Athletic Field Sports Lighting - LED Upgrade - Design-Build Purchasing Agent/Entity...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 10/12/2026

..., Greenwood, SC Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator: Jeffrey... METHOD: ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 10/14/2026

...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Frank Murray... (District) ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 10/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.