| Location: | Texas |
|---|---|
| Posted: | Jul 10, 2025 |
| Due: | Jul 25, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911SG25BA022 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Remove existing asphalt shingle roofing system at building 113 and provide a new metal shingles. Project includes some wood plank deck replacement, new self-adhering underlayment, new metal roof shingles, existing wood soffit and fascia repair and paint, the reinforcement of rafters exposed at soffit, new prefinished drip edge, gutters, and downspouts. Provide a six-nail pattern at each shingle installation. Install in accordance with roofing manufacturers details required to meet manufacturer’s 30-year roof warranty 120 mph wind speed coverage.
Building 113 is a historical building, extra care is to be taken, and all new materials and paint colors are to be coordinated through the COR and the Cultural Resource Manager.
The tentative date for the issuance of the solicitation is 25 July 2025. The tentative date for the pre-bid conference is 6 August 2025 @ 0900 MDT, and the location will be stated in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions from the pre-bid conference must be submitted by 13 August 2025 @ 1200 MDT via email to Jakeb.I.James.civ@army.mil.
See the Statement of Work for the full requirement.
| Jul 28, 2025 | [Solicitation (Original)] Building 113 Repair/Replace Roof |
| Jul 29, 2025 | [Solicitation (Updated)] Building 113 Repair/Replace Roof |
| Aug 6, 2025 | [Solicitation (Updated)] Building 113 Repair/Replace Roof |
| Aug 18, 2025 | [Solicitation (Updated)] Building 113 Repair/Replace Roof |
| Aug 29, 2025 | [Solicitation (Updated)] Building 113 Repair/Replace Roof |

With GovernmentContracts, you can:
..., supervision, and incidental items necessary to remove the existing roofing system and ...
Austin Independent School District
Bid Due: 7/15/2026
...DRYWALL, REINFORCING BAR, CEMENT, METAL FRAMING COMPONENTS, LAMINATE, ACRYLIC SHEETING, DOORS, AND... ROOFING ...
Alief Independent School District
Bid Due: 4/30/2028
...BAR, CEMENT, METAL FRAMING COMPONENTS, LAMINATE, ACRYLIC SHEETING, DOORS, AND ROOFING MATERIAL...
Alief Independent School District
Bid Due: 4/30/2028
...and rreplacment is necessary. The new generator will be housed in a metal ...
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 7/21/2026