Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Agency
Mohican Campground Campsites &
Project Name Dumpstation Improvements
Project Location Mohican State Park
City / County Loudenville / Ashland
Owner
Ohio Department of Natural Resources
Delivery Method General Contracting
Publish Date 8/6/2026
Response Deadline 8/28/2026
4:00 P.M. local time
Project Number
Project Manager
DNR-270078
Keith VanDeusen
Contracting Authority Local Agency
Prevailing Wages State
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Division of Engineering at
Engineering@dnr.ohio.gov . See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Division of Engineering at Engineering@dnr.ohio.gov with the project
number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page
on the OFCC website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the
party submitting a question will not be included on the Q&A documents.
Project Overview
A. Project Description
The Ohio Department of Natural Resources (ODNR) manages campgrounds at 76 State Parks statewide with over 8,970
campsites. Since 2015, ODNR has been upgrading campground infrastructure to meet modern standards for full-service
campsites. Mohican State Park requires upgrades to provide 50-amp electrical service, potable water hookups, sanitary
sewer hookups, improved dump station function, stormwater upgrades, and site infrastructure enhancements.
ODNR is requesting Statements of Qualifications (SOQ) from professional design firms interested in providing design,
engineering, and construction administration services for utility and infrastructure improvements at the Mohican State
Park Campgrounds. This project is part of ODNR’s ongoing efforts to modernize campground facilities statewide.
The project includes full professional design and construction administration services for utility and site improvements
within Mohican State Park’s campground areas. The design consultant will perform a comprehensive evaluation of
existing utilities, including water distribution systems, sanitary sewer lines, wastewater disposal systems, storm drainage
systems, electrical service distribution, and existing roadway or pavement conditions.
The project will deliver designs for upgrades to the existing campground dump station and select campsites, including
utility service additions, electrical-only upgrades at certain locations, parking pad expansions, regrading for proper
drainage, stormwater improvements, and roadway resurfacing or reconstruction as required. Infrastructure improvements
must be sized and aligned with master planning recommendations to ensure sustainability and future growth.
Phased construction efforts to maintain maximum possible occupancy levels need to be considered throughout the
design process.
As scope and associated costs are solidified, projects of similar types, scope and budget may be added or removed as
ODNR initiatives and funding allow.
While ODNR anticipates centralized services from the selected Consultant at the ODNR Fountain Square complex at 2045
Morse Road, Columbus, Ohio 43229, travel will be necessary to complete the services. For the purposes of scoring
proximity to project site, the ODNR Fountain Square complex will be considered the project site.
B. Scope of Services
F110-02-2026-JAN
Publish Date: 8/6/2026
Page 1 of 5
Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
The project scope will be evaluated, prioritized, and reconciled with existing master plans, beginning with the confirmation
of facility and site assessments. Evaluation of the project construction schedule will also be part of the Program
Verification stage. Upon award of the Agreement, the selected firm will commence by developing the Program
Verification.
The selected firm shall apply for and obtain all necessary regulatory permits, maintain current estimates of probable
construction costs through the design phase, and provide construction administration services. Permitting and/or
coordination with United States Army Corps of Engineers (USACE), United States Fish and Wildlife Service (USFWS),
ODNR Dam Safety Program, ODNR Division of Wildlife, Ohio Environmental Protection Agency (OEPA), State Historic
Preservation Office (SHPO), and the local floodplain administrators will be required. The selected firm will provide the
engineering analysis and calculations needed to advance the design, including structural, geotechnical, and hydraulics
engineering.
All design and construction shall comply with the current editions of all applicable national, state, and local codes, as well
as accessibility standards, including ADA, ICC A117.1, and the ABA Outdoor Developed Areas Guidelines. The Ohio
Department of Natural Resources Division of Engineering has developed a set of design guidelines for construction
projects. It is expected that all architects, engineers, consultants, and contractors will be familiar with these design
guidelines which will serve as the preference for all construction projects when developing final project specifications. A
complete set of current guidelines are available at Design Guidelines for Construction Projects | Ohio Department of
Natural Resources. (https://ohiodnr.gov/business-and-industry/services-to-business-industry/design-guidelines-all).
The selected Construction Manager at Risk (“CM”), as a portion of its required Scope of Services and prior to submitting
its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement
detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the
Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: provide
constructability review comments on documents produced by the A/E during the Schematic Design, Design Development,
and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering,
project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process,
Construction and Closeout Stage.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 8 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Experience with similar scope (campgrounds, dump stations).
2. Experience with environmental permitting and cultural resources assessment services.
3. Ability to manage design and construction projects in an occupied State Park setting.
4. Experience coordinating with USACE.
5. Experience with subsurface utility assessments.
6. Ability to design project scope within budget in current market conditions with regional cost factors.
7. Experience with construction cost-estimating/analysis for natural resource facilities.
8. Experience managing the State of Ohio contract documents and OAKS CI.
9. Experience with ODNR Capital improvement projects.
10. Experience with Master Planning and future needs planning.
F110-02-2026-JAN
Publish Date: 8/6/2026
Page 2 of 5
Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
C. Estimated Budget / Funding
State Funding:
$2,761,000
Other Funding:
$0
Construction Cost: $2,319,240,
Total Project Cost: $2,761,000
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
12 / 26
10 / 27
05 / 28
07 / 29
E. Estimated Basic Fee Range (see note below)
8% to 10%
F. EDGE Participation Goal
Percent of initial Total A/E Fee:
5.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,
including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for
the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,
including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Architecture or Engineering
Secondary
Engineering
Disciplines:
Civil Engineering
Plumbing Engineering
Electrical Engineering
Landscape Architecture
Surveying
H. Additional Service Providers Required
Cultural Services
Environmental Services
Hazardous Materials
Geotechnical Services
Master Planning Services
Special Inspections OBC17?
Enter Secondary Discipline
Enter Secondary Discipline
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
• Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
• Previous experience compatible with the proposed project (e.g., type, size).
• Relevant past work of prospective firm’s proposed consultants.
• Past performance of prospective firm and its proposed consultants.
• Qualifications and experience of individuals directly involved with the project.
• Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
• Specification writing credentials and experience.
• Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
• Approach to and success of using partnering and Alternative Dispute Resolution.
• Proximity of prospective firms to the project site.
• Proposer’s apparent resources and capacity to meet the needs of this project.
• The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business(es), as a part of the A/E’s team. The Intent to Contract and to Perform and / or
waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to
F110-02-2026-JAN
Publish Date: 8/6/2026
Page 3 of 5
Request for Qualifications (Registered Design Professional) continued
the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to
Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the
delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by “SOQ”.
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2026-JAN
Publish Date: 8/6/2026
Page 4 of 5
Registered Design Professional Selection Rating Form
State of Ohio Standard Forms and Documents
Mohican Campground Campsites & Dumpstation
Project Name Improvements
Project Number DNR-270078
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 150 miles
150 miles to 250 miles
More than 250 miles
Less than $1,000,000
$1,000,000 to $2,000,000
More than $2,000,000
Less than 5 professionals
5 to 10 professionals
More than 10 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
Experience / ability of key consultants to
perform effectively and collaboratively
b. Proposed EDGE-certified Consultant participation*
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 4 sample projects
4 to 6 sample projects
More than 6 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 4 projects
4 to 6 projects
More than 6 projects
Performance in completing projects within
original construction budget and schedule
Less than 4 projects
4 to 8 projects
More than 8 projects
Value
5
2
0
2
1
0
1
2
3
Max
=3
0 - 10
0 - 10
0-5
Max
= 20
0-5
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
Score
* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.™
Notes:
Evaluator:
Name
Subtotal
F110-02-2026-JAN
Signature
Publish Date: 8/6/2026
Date
Page 5 of 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.