| Location: | New Jersey |
|---|---|
| Posted: | Oct 2, 2026 |
| Due: | Oct 19, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912DS26RA032 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents.
As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation.
As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
| Sep 17, 2026 | [Solicitation (Original)] Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project |
| Sep 19, 2026 | [Solicitation (Updated)] Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project |
| Oct 19, 2026 | [Solicitation (Updated)] Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project |
| Oct 20, 2026 | [Solicitation (Updated)] Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project |

With GovernmentContracts, you can:
...Follow Design/Build Maintenance and Repair Army Reserve (MRAR), Area Maintenance Support Activity... will ...
DEPT OF DEFENSE
Bid Due: 12/21/2026
...Bid Title: 2027 Prof Services- SCADA Design, Install, Maint, Repair, & Process Control ...
Township of Cherry Hill
Bid Due: 11/06/2026
...Follow Progressive Design Build - 26,000 SF hangar at Lakehurst on Joint Base ...
DEPT OF DEFENSE
Bid Due: 11/12/2026