Roosevelt and Franklin Water Main Replacement Design Project

Location: Alaska
Posted: Mar 17, 2026
Due: Mar 31, 2026
Agency: Ketchikan Gateway Borough
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Roosevelt and Franklin Water Main Replacement Design Project

Addenda: 2

Release Date: 2/19/2026

Due Date: 3/31/2026

Follow
Roosevelt and Franklin Water Main Replacement Design Project
Last updated by Addendum #2 on Mar 18, 2026 12:36 AM See what changed
Request For Proposal
Public Works
92517
Release Date: Thursday, February 19, 2026
ยท Due Date: Tuesday, March 31, 2026 2:00pm
Posted Thursday, February 19, 2026 11:39am
All dates & times in Alaska Time
Draft Response No Bid13 days, 20 hours, 16 minutes


Post Information

Posted At:Thu, Feb 19, 2026 11:39 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The Ketchikan Gateway Borough is seeking civil engineering design services to replace the water mains in Roosevelt Drive and Franklin Drive with 8" HDPE water mains, install new three-way valve clusters at all side roads with cross-road extensions, replace all valving and piping in the Franklin/Roosevelt intersection, and extend HDPE mains into the PRV. In total, the project will replace mains in some 2,300-lf of roadways.



Background

The Roosevelt Drive and Franklin Drive intersection has held the generative mains for the drinking water distribution system since the construction of the Forks Creek Dam in the 1930s. Upgrades commencing in 1983 installed 6-inch PVC drinking water piping throughout Roosevelt and Franklin Drive. Following treatment plant installation in 1989, the Borough undertook the 1991-1993 Mountain Point Service Area Water and Sewer Master Improvements Phase I-V project, entailing the construction of the booster station to provide system pressure, replacement and extension of water mains to all neighborhoods, and installation of pressure reducing vaults to create the low pressure zone along the highway. While all new mains in Roosevelt Drive and Franklin Drive are 8-inch ductile iron, the materials in the roadways remain 6-inch PVC. The 2024 South Tongass Water Utility Master Plan identified the main sizing as being an inhibiting factor for flow throughout the water system.

Of more concern is that the discontinuous nature of the ductile iron and PVC material exacerbates electrolytic corrosion: mainline valves at Rogers Pass Road have come apart on two occasions in the past five years, and cross-road mains are at high risk of pinhole leaks that would be difficult to rectify without major impacts to the traveling public. This project will extend new piping across all roadways, and provide terminal valves with the unpaved roadways.



Timeline

Release Project Date:
February 19, 2026
Question Submission Deadline:
March 9, 2026, 5:00pm
Question Response Deadline:
March 11, 2026, 5:00pm
Proposal Submission Deadline:
March 31, 2026, 2:00pm
Project Award:
April 6, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Research Center, Baler Facility, Borough Landfill, and Leachate Treatment plant. There... Permit AK0053481 ...

Kodiak Island Borough

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.