Description
Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to:
• Design of two[2] site specific concrete foundations for towers supplied by Canadian Coast Guard (CCG);
• Supply and installation of four [2] concrete foundations as approved by CCG;
• Installation of two [2] CCG supplied towers as per CCG provided drawings;
• Demolition of two [2] existing skeleton style towers and concrete foundations.
CCG Squirrel Island range towers are at the end of their lifecycle and are required to be replaced. LL732 Squirrel Island front range tower is accessible by boat or helicopter, while LL733 Squirrel Island rear range is currently only accessible by helicopter. However LL733 Squirrel Island rear range tower is suitable for a temporary access road, which will be required for construction activities. The exact coordinates of the sites are as follows:
• Squirrel Island front range LL732 front range tower : 42°33'26.50"N, 82°34'15.80"W
• Squirrel Island rear range LL733 rear range tower: 42°33'11.70"N, 82°34'57.70"W
Under this contract, a site specific concrete foundation, walkway from existing helicopter pads to new foundations/towers shall be designed and stamped by a Professional Engineer practicing within the Province of Ontario. Geotechnical reports and tower drawings will all be provided by CCG to the Contractor to assist in the design the site specific foundations. When the foundation design has been approved by CCG, the Contractor shall construct the foundations, walkways, and erect CCG supplied ‘Quebec Towers’. Tower heights to be provided will be 30’ and 80’. Erection of the towers will also include the installation of their corresponding Daymarks. Daymarks will also be provided by CCG including the drawings of each Daymark to be installed. When new towers have been installed in their entirety, the Contractor shall then demolish the existing towers including their concrete foundations.
The Contractor must perform and complete the Work by March 31st , 2026.
The estimated contract period will be 9 month(s), with a proposed start date of 2025/06/16.
A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:
Are you interested in partnering with other businesses for this opportunity? Add your company to the list of businesses who are interested in partnering .
This list does not replace or affect the tendering procedures for this procurement process. Businesses are still required to respond to bid solicitations, and to compete based on the set criteria. For more information please read the Terms of use .

With GovernmentContracts, you can: