| Location: | Arizona |
|---|---|
| Posted: | Oct 1, 2026 |
| Due: | Nov 3, 2026 |
| Agency: | City of Bisbee |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-018 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
26-018
|
| Bid Title: |
Request for Proposals Abatement of Regulated Building Material (RBM) 30 Main Street, Bisbee, AZ
|
| Category: | Community Development |
| Status: | Open |
|
REQUEST FOR PROPOSALS (RFP)
INSTRUCTIONS TO PROPOSERS
ABATEMENT OF REGULATED BUILDING MATERIAL (RBM)
FORMER "BISBEE GOURMET FOODS"
30 Main St Bisbee, AZ 85603
1. Introduction
The City of Bisbee is seeking sealed proposals ("Proposals") in the manner specified herein from qualified
Proposer ("Proposer") capable of providing the following goods and/or services:
The City of Bisbee is seeking proposals to remove regulated building material including but
not limited to asbestos containing material and lead-based paint from 30 Main Street,
Bisbee, AZ. The asbestos to be removed from the two-story commercial building.
2. SCHEDULE OF EVENTS
Voluntary/Mandatory Field-Meeting:
October 14, 2026
11:00 a.m. (Arizona, MTS)
Attendance is voluntary for firms that have
previously visited and inspected the project site.
Attendance is mandatory for firms that have not
previously visited the site. Firms submitting
proposals acknowledge they are fully familiar
with site conditions regardless of attendance.
Submittal Due Date: November 3, 2026
3:00 p.m. (Arizona, MST)
Submittal Location: City Clerk, City of Bisbee 118 Arizona Street
Bisbee, AZ 85603
Inquiries may be directed to: City of Bisbee Community Development
118 Arizona Street
Bisbee, AZ 85603 Attn: Matthew Gurney
(520) 432-6002
mgurney@bisbeeaz.gov
Melissa Hartman
(520) 335-5693
mhartman@bisbeeaz.gov
1
3. Nature of the Purchase
The specifications and descriptions of the work and/or materials required are described in the attached
"Specifications, Scope of Work or Requirements" that accompanies this Notice.
4. Preparation of Proposal
4.1 It is the responsibility of the Proposer to examine the entirety of this Request for Proposals
and to seek clarification of any requirement that may not be clear. This Request for Proposals includes the
City of Bisbee's standard Purchase Contract, which the successful Proposer will be required to execute.
4.2 The City will not reimburse any costs incurred in developing, presenting or providing the
proposal. All materials and documents submitted in response become the property of the City and will not
be returned.
4.3 All Proposals submitted to the City become a public record. If the Proposer believes that any
information included in a proposal should remain confidential, the Proposer must specifically identify that
information and its reasons. In the event of any public request for this information, the City will use its best
reasonable efforts to provide the Proposer with notice of this request and an opportunity to obtain a court
order, at the Proposer's sole expense, protecting this information from release prior to making it available.
4.4 Proposers shall be properly licensed through the Arizona Registrar of Contractors and shall
be asbestos-certified professionals compliant with regulatory requirements. Proposers must hold current
EPA AHERA accreditation certification, as applicable, and must submit documentation verifying all
required licenses, certifications, and accreditations.
4.5 If brand names or specific products are identified in the specifications, the Proposer may
propose substantially equivalent alternatives. For any such proposals, the Proposer must submit technical
literature or detailed production information sufficient to allow the City to evaluate the nature of the proposed
product.
4.6 Prices shall be submitted in a separate seal envelope on a per unit basis, by line item, when
applicable. The prices offered should include applicable state and local taxes. The City will reimburse the
Proposer for applicable transaction or sales taxes, provided that they are separately identified in any invoice.
The Proposer will be responsible for the payment of all applicable taxes.
4.7 Prices shall include delivery, freight, and taxes.
4.8 Any exceptions that are included with the proposals shall be submitted in a clearly identified
separate statement by which the Proposer specifically identifies the precise terms to which any exception is
made and describes any alternative offer, if applicable. Any exception that is not clearly identified will be
without force and effect. An attached preprinted form of contract or the Proposer's standard terms will not
be considered to be a specific statement of exception.
4.9 Federal Davis-Bacon prevailing wages apply to this project; Payment of wages fringe benefits
and overtime rates are required.
Applicability of the Davis Bacon prevailing wage requirements:
Davis-Bacon prevailing wage requirements apply to the construction, alteration, remediation, and repair
treatment works carried out in whole of the project of 30 Main located at 30 Main St, Bisbee, AZ 85063
If the subrecipient encounters a unique situation at the site that presents uncertainties regarding Davis-Bacon
2
applicability, the sub-recipient must discuss the situation with the City of Bisbee staff, Cochise County
Development Services staff, and the EPA representative.
5. Submission of the Proposals
5.1 Three copies of the Sealed technical proposals and three copies of the price/cost
proposals must be in the actual possession of the City Clerk on or prior to the exact time and date
indicated in the Schedule of Events. Late Proposals will not be considered. The technical proposals and
price/cost proposals must be in separate sealed envelopes.
5.2 Sealed proposals must include items A through E and be submitted in a sealed envelope or
container. The following information must be clearly indicated and included with the proposal:
5.3
A. Proposal
A detailed proposal outlining the Contractor's approach to completing the work
described in the Scope of Work.
B. Contractor's Qualification Statement
Must provide Information establishing the Contractor's qualifications, technical expertise,
applicable licenses and certifications, and capacity to perform the services required under
this Request for Proposals.
C. List of Similar Projects
A list of at least three (3) similar projects completed within the past five (5) years,
including project descriptions, locations, completion dates, and client references with
contact information.
D. Statement of Days to Complete
A written statement specifying the number of calendar days required to complete the
project from the Notice to Proceed.
E. Completed and Signed Request for Proposal Forms
Submit a completed and signed copy of the Request for Proposals, including the Proposal
Form, Certification, acknowledgments, and all required signature pages contained in this
RFP. All required signatures must be provided for the proposal to be considered
responsive
5.3 Proposals shall be submitted in writing, by a paper document that is printed, typed or in ink.
Proposals submitted directly to the City by electronic means, by facsimile, electronic mail, or otherwise, shall
not be accepted. Any substitute for any document forms provided with this Request for Proposals must be
legible and must contain the same information requested by any such form.
5.4Proposals may be withdrawn upon the submission of written, signed request submitted by the
Proposer prior to the due date and time. Proposals may not be amended or withdrawn after the due date and
time.
3
6. Davis Bacon and Related Acts
This project is funded through the U.S. Environmental Protection Agency Brownfields Revolving
Loan Fund Program. Cochise County is the recipient and the City of Bisbee is a subrecipient. The
Contractor and all subcontractors shall comply with the Davis Bacon and Related Acts, the Copeland Anti-
Kickback Act, and 29 CFR Parts 1, 3, and 5. The Contractor shall pay all laborers and mechanics
employed directly on the site wages and fringe benefits at rates not less than those contained in the
applicable U.S. Department of Labor wage determination incorporated into this solicitation and resulting
contract. The Proposer under this Request for Proposal shall attach the applicable wage determination for
Cochise County, Arizona to the bid documents. The Contractor shall submit weekly certified payroll
reports to the City of Bisbee and Cochise County for all employees performing work on the project and
shall require the same for all subcontractors. The Contractor shall ensure compliance by all subcontractors
of every tier and shall incorporate all labor standards into every subcontract. The Contractor shall utilize
classifications contained within the applicable wage determination and comply with federal conformance
procedures, if needed. The Contractor shall maintain payroll and employment records and make them
available upon request to the City of Bisbee, Cochise County, EPA, the U.S. Department of Labor, and
other authorized agencies. Where applicable, the Contractor shall comply with the Contract Work Hours,
and Safety Act. By submitting a proposal, the bidder certifies that it has reviewed the applicable Davis
Bacon wage determination and included all labor standards compliance costs in its proposal.
4
"General Decision Number: AZ20260038 05/18/2026
State: Arizona
Construction Types: Building
Counties: Arizona Counties of Cochise
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
BRAZ0003-001 07/01/2024
Rates Fringes
BRICKLAYER..........................................$ 32.29 9.97
CARP1912-001 07/01/2025
Rates Fringes
CARPENTER...........................................$ 33.19 19.20
ELEC0570-001 06/01/2025
Rates Fringes
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)...........$ 33.00 13.04
ENGI0428-016 06/01/2023
Rates Fringes
POWER EQUIPMENT OPERATOR: CRANE.....................$ 36.04 13.52
POWER EQUIPMENT OPERATOR: BULLDOZER.................$ 31.69 13.52
IRON0075-007 08/01/2025
Rates Fringes
IRONWORKER, STRUCTURAL..............................$ 33.00 19.91
PLUM0469-009 07/01/2025
Rates Fringes
PIPEFITTER..........................................$ 51.15 21.00
SHEE0359-001 07/01/2025
Rates Fringes
SHEET METAL WORKER..................................$ 49.39 19.86
SUAZ2019-001 06/12/2023
Rates Fringes
TILE SETTER. $ 21.50 0.00
PLUMBER. $ 28.51 0.00
PAINTER. $ 15.00 0.00
5
OPERATOR: ROLLER. $ 23.62 6.44
OPERATOR: LOADER. $ 15.00 4.15
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE. $ 19.58 3.79
LABORER: PIPELAYER. $ 16.77 1.05
LABORER: MASON TENDER - CEMENT/CONCRETE. $ 19.79 0.00
LABORER: COMMON OR GENERAL. $ 12.00 0.00
IRONWORKER, REINFORCING. $ 22.04 0.00
ELECTRICIAN (LOW VOLTAGE WIRING). $ 26.16 9.91
DRYWALL FINISHER/TAPER. $ 22.47 0.00
CEMENT MASON/CONCRETE FINISHER. $ 21.00 0.00
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick
Leave for Federal Contractors applies to all contracts
subject to the Davis-Bacon Act for which the contract is
awarded (and any solicitation was issued) on or after
January 1, 2017. If this contract is covered by the EO,
the contractor must provide employees with 1 hour of paid
sick leave for every 30 hours they work, up to 56 hours of
paid sick leave each year.
Employees must be permitted to use paid sick leave for
their own illness, injury or other health-related needs,
including preventive care; to assist a family member (or
person who is like family to the employee) who is ill,
injured, or has other health-related needs, including
preventive care; or for reasons resulting from, or to
assist a family member (or person who is like family to the
employee) who is a victim of, domestic violence, sexual
assault, or stalking. Additional information on contractor
requirements and worker protections under the EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts
subject to the Davis-Bacon Act that were awarded on or between
January 1, 2015 and January 29, 2022, and that have not been
renewed or extended on or after January 30, 2022. Executive
Order 13658 does not apply to contracts subject only to the
Davis-Bacon Related Acts regardless of when they were awarded. If
a contract is subject to Executive Order 13658, the contractor
must pay all covered workers at least $13.65 per hour (or the
applicable wage rate listed on this
wage determination, if it is higher) for all hours spent performing
on the contract from May 11, 2026, through December 31, 2026. The
applicable Executive Order minimum wage rate will be adjusted
annually. Additional information on contractor requirements and
worker protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included
within the scope of the classifications listed may be
added after award only as provided in the labor standards
contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the
classifications and wage rates that have been found to be
prevailing for the type(s) of construction and geographic
area covered by the wage determination. The classifications
6
are listed in alphabetical order under rate identifiers
indicating whether the particular rate is a union rate
(current union negotiated rate), a survey rate, a weighted
union average rate, a state adopted rate, or a supplemental
classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
SU, UAVG, SA, or SC denotes that a union rate
was prevailing for that classification in the survey.
Example: PLUM0198-005 07/01/2024. PLUM is an identifier of
the union whose collectively bargained rate prevailed in
the survey for this classification, which in this example
would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The
next number, 005 in the example, is an internal number
used in processing the wage determination. The date,
07/01/2024 in the example, is the effective date of the
most current negotiated rate.
Union prevailing wage rates are updated to reflect all
changes over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed
for those classifications, but that 100% of the data
reported for the classifications reflected union rates.
EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of
Ohio. The next number, 0010 in the example, is an internal
number used in producing the wage determination. The date,
01/01/2024 in the example, indicates the date the wage
determination was updated to reflect the most current
union average rate.
A UAVG rate will be updated once a year, usually in
January, to reflect a weighted average of the current rates
in the collective bargaining agreements on which the rate
is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-
union rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived
by computing a weighted average rate based on all the rates
reported in the survey for that classification. As a
weighted average rate includes all rates reported in the
survey, it may include both union and non-union rates.
Example: SUFL2022-007 6/27/2024. SU indicates the rate is a
single non-union prevailing rate or a weighted average of
survey data for that classification. FL indicates the State
of Florida. 2022 is the year of the survey on which these
classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
7
wage determination. The date, 6/27/2024 in the example,
indicates the survey completion date for the
classifications and rates under that identifier.
SU wage rates typically remain in effect until a new
survey is conducted. However, the Wage and Hour Division
(WHD) has the discretion to update such rates under 29 CFR
1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government
were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-
007 01/03/2024. SA reflects that the rates are state
adopted. ME refers to the State of Maine. 2023 is the year
during which the state completed the survey on which the
listed classifications and rates are based. The next
number, 007 in the example, is an internal number used in
producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on
which the classifications and rates under the SA
identifier took effect under state law in the state from
which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position
on a wage determination matter
d) an initial conformance (additional
classification and rate) determination
On survey related matters, initial contact, including
requests for summaries of surveys, should be directed to
the WHD Branch of Wage Surveys. Requests can be submitted
via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage
Surveys Wage and
Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should
be directed to the WHD Branch of Construction Wage
Determinations. Requests can be submitted via email to BCWD-
Office@dol.gov or by mail to:
Branch of Construction Wage
Determinations Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any
interested party (those affected by the action) that
disagrees with the decision can request review and
reconsideration from the Wage and Hour Administrator (See 29
CFR Part 1.8 and 29 CFR Part 7). Requests for review and
8
reconsideration can be submitted via email to
dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of
the interested party's position and any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable,
an interested party may appeal directly to the
Administrative Review Board (formerly the Wage Appeals
Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION
9
7. Award of the Contract
a. The City reserves the right to waive any immaterial defect or informality in a Proposal;
to reject any or all Proposals or portions thereof; to reissue this Request for Proposals;
and to accept a Proposal on a partial basis, if in the best interests of the City.
b. Unless otherwise stated, the Contract will be awarded to the responsible Proposer who
has demonstrated the ability to perform as required. Factors that will be considered in
making this award include technical capability of the Proposer, performance history,
demonstrated availability of the necessary people and equipment, price and timeliness
of the performance.
8. Certification
CIVIL RIGHTS
The undersigned is fully aware that this contract is wholly or partially federally funded, and further,
agrees to abide by the:
Civil Rights Act of 1964, Title VI, as amended, that provides no person on the basis of Race, Color
or National Origin shall be excluded from participation, denied program benefits or subjected to
discrimination.
And, Civil Rights Act of 1968, Title VIII, as amended, will not discriminate in housing on the basis
of Race, Color, Religion, Sex or National Origin.
And, Rehabilitation Act of 1973, Section 503, as amended, which prohibits discrimination against
individuals with disabilities and requires government contractors to take affirmative action to employ
and advance in employment qualified individuals with disabilities.
And, Housing and Community Development Act of 1974, Section 109, as amended, that no person
shall be excluded from participation (including employment), denied program benefits or subjected
to discrimination on the basis of Race, Color, National Origin, Sex, Age, Religion and Disability
under any program or activity funded in whole or part under Title I (CDBG) of the Act.
And, Age Discrimination Act of 1975, as amended, that no person shall be excluded from
participation, denied program benefits or subjected to discrimination on the basis of age under any
program or activity receiving federal funds.
And, Americans with Disabilities Act of 1990, as amended, that no covered entity shall discriminate
against a qualified individual on the basis of disability in regard to job application procedures, the
hiring, advancement or discharge of employees, employee compensation, job training and other
terms, conditions and privileges of employment.
And, Executive Order 11063, that no person shall, on the basis of Race, Color, Religion, Sex or
National Origin, be discriminated against in housing and related facilities provided with federal
assistance or lending practices with respect to residential property when such practices are connected
with loans insured or guaranteed by the federal government.
And, Executive Order 11246, as amended, that no person shall be discriminated against, on the basis
of Race, Color, Religion, Sex, Sexual Orientation, Gender Identity or National Origin, in any phase
of employment during the performance of federal or federally assisted construction contracts awarded
to contractors or subcontractors who do over $10,000 in government business in one (1) year.
EQUAL EMPLOYMENT OPPORTUNITY
During the performance of the contract, the contractor agrees as follows:
1. The contractor will not discriminate against any employee or applicant for employment
because of race, color, religion, sex, sexual orientation, gender identity, or national origin.
The contractor will take affirmative action to ensure that applicants are employed and that
10

With GovernmentContracts, you can:
Project: HOME- Roof, Electric, Bathroom, Kitchen- McNeal Ref. #: 27-03-DEV-01 Type: ITB Status:
Cochise County
Bid Due: 12/10/2026
DOWNLOAD TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT Date: November 24, 2026, at
Navajo Tribal Utility Authority
Bid Due: 11/24/2026
Project ID: Title: Employee Benefits- Life/STD/FSA/HSA/COBRA Addenda: 0 Release Date: 10/20/2026 Due Date:
Tempe Union High School District
Bid Due: 11/19/2026
Pavement Marking (2027-2028) Department: Public Works Category: Yuma County RFP's RFP Number: 2027-2028CY.05
Yuma County
Bid Due: 11/24/2026