REQUEST FOR QUOTES
TO PROVIDE:
CERTIFIED PAYROLL MONITORING SERVICES
TO THE
SAN LORENZO VALLEY WATER DISTRICT
FOR THE FOLLOWING PROJECTS:
DWR HIGHLAND TANK REPLACEMENT
DWR REDWOOD PARK AND ECHO TANK REPLACEMENT
IRWM PUMP STATION FIRE HARDENING PROJECT
OCTOBER 2025
San Lorenzo Valley Water District
13060 Highway 9
Boulder Creek, CA 95006
(831) 338-2153
2026 Grant Projects CPM RFQ
I. INTRODUCTION
The San Lorenzo Valley Water District (District) has three upcoming grant-funded infrastructure projects,
described below:
1. DWR Highland Tank Replacement includes the installation of a new 120,000 gallon bolted steel
water tank at an existing tank site along Highland Drive in Boulder Creek, CA. Also included is
associated yard piping, storm drainage, tie-ins, and the construction of a soldier beam debris
wall. Contract time is 300 days.
2. DWR Redwood Park and Echo Tank Replacement includes installation of a two new 120,000
gallon bolted steel water tanks at two separate tank sites. Redwood Park Tank Site, off Country
Club Drive in Ben Lomond, CA also includes a small retaining wall, an enclosed pump station, and
storm water drainage. Echo Tank Site, off Echo Lane in Boulder Creek, CA also includes large
retaining walls with tie-backs and storm water drainage. Contract time is 300 days.
3. IRWM Pump Station Fire Hardening Project includes removal of the existing roof structures and
coverings of five pump stations, and construction of new fire-resistant roof structures and
coverings for each of the five pump stations, which are located across Boulder Creek, CA and Ben
Lomond, CA. Contract time is 270 days.
II. PROJECT SCOPE OF SERVICES
The District is soliciting quotes for labor compliance and certified payroll monitoring services for the
above projects. Note that there will be construction overlap between the projects, which are all expected
to begin around February – April of 2026 and are all required to be completed by the end of 2026 or
earlier. While weekly progress meetings will not overlap, consultant shall have adequate staffing to
handle compliance and submittals from multiple projects and multiple construction contractors.
Deliverables for this project include the following:
1. Review Contractor’s Certified Payroll Submittals for adherence to prevailing wage and relevant
DIR regulations;
2. Attendance (in person or via phone) at weekly progress meetings;
3. Coordinate with Contractors to ensure compliance with public works labor laws.
The Consultant shall provide internal quality control and quality assurance procedures. Any
subconsultants employed by the Consultant shall be managed by the Consultant.
Note that the Consultant shall adhere to all conditions and requirements of the California Department
of Water Resources and IRWM Grant, which are included as Exhibit B of the Draft Professional Services
Agreement.
2026 Grant Projects CPM RFQ
III. COMPENSATION SCHEDULE
The Compensation Schedule shall include, for each project:
- An initiation fee ($) to cover project/account setup and attendance at the pre-construction
meeting
- A monthly service rate ($/month), to perform all deliverables described in the Scope of Services
Please also include a total estimate including the initiation fees for each project and monthly service
rates based on the following estimated number of construction months:
- DWR Highland Tank Replacement: Estimated 6 months of construction
- DWR Redwood Park and Echo Tank Replacement: Estimated 8 months of construction
- IRWM Pump Station Fire Hardening: Estimated 4 months of construction
Consultant shall be compensated the initiation fee plus the service rate based on the actual number of
construction months for each project.
IV. ATTACHMENTS
1. DWR Highland Tank Replacement Planset
2. DWR Redwood Park Tank Replacement 90% Planset
3. DWR Echo Tank Replacement 90% Planset
4. IRWM Pump Station Fire Hardening Planset
5. Draft Professional Services Agreement
V. DISTRICT CONTACT/SUBMITTAL REQUIREMENTS
1. Questions regarding this RFP should be submitted to the District’s Engineering Manager, Garrett
Roffe, via email at GRoffe@slvwd.com by 5:00 p.m. on Wed. November 19, 2025. Responses to
these questions will be uploaded to the District website by no later than Fri. November 21, 2025.
2. Submit one electronic copy of the proposal in PDF format via email to GRoffe@SLVWD.com. The
proposal shall be signed by an individual, partner, officer or officers authorized to execute legal
documents on behalf of the Firm.
3. Proposals to include the following:
A. Compensation Schedule, as described in section III.
B. No fewer than two Professional References including both phone numbers and emails.
4. Proposals must be received no later than 3:00 p.m. local time, on or before Fri. December 5,
2025.
Failure to comply with the requirements of this RFP may result in disqualification.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.