2026 Grant Projects Certified Payroll Management

Location: California
Posted: Nov 14, 2025
Due: Dec 5, 2025
Agency: San Lorenzo Valley Water District
Type of Government: State & Local
Category:
  • R - Professional, Administrative and Management Support Services
  • U - Education and Training Services
Publication URL: To access bid details, please log in.
2026 Grant Projects Certified Payroll Management - Request for Quotes [Due 12/5]
  • 2026 Grant Projects - CPM RFQ (Addendum 1)
  • 2026 Grant Projects CPM - Addendum No. 1
  • DWR Highland Tank Replcement Planset
  • DWR Redwood Park Tank Replacement 90% Planset
  • DWR Echo Tank Replacement 90% Planset
  • IRWM Pump Station Fire Hardening - Planset
  • Draft Professional Services Agreement (Addendum 1)
  • Attachment Preview

    REQUEST FOR QUOTES
    TO PROVIDE:
    CERTIFIED PAYROLL MONITORING SERVICES
    TO THE
    SAN LORENZO VALLEY WATER DISTRICT
    FOR THE FOLLOWING PROJECTS:
    DWR HIGHLAND TANK REPLACEMENT
    DWR REDWOOD PARK AND ECHO TANK REPLACEMENT
    IRWM PUMP STATION FIRE HARDENING PROJECT
    OCTOBER 2025
    San Lorenzo Valley Water District
    13060 Highway 9
    Boulder Creek, CA 95006
    (831) 338-2153
    2026 Grant Projects CPM RFQ
    I. INTRODUCTION
    The San Lorenzo Valley Water District (District) has three upcoming grant-funded infrastructure projects,
    described below:
    1. DWR Highland Tank Replacement includes the installation of a new 120,000 gallon bolted steel
    water tank at an existing tank site along Highland Drive in Boulder Creek, CA. Also included is
    associated yard piping, storm drainage, tie-ins, and the construction of a soldier beam debris
    wall. Contract time is 300 days.
    2. DWR Redwood Park and Echo Tank Replacement includes installation of a two new 120,000
    gallon bolted steel water tanks at two separate tank sites. Redwood Park Tank Site, off Country
    Club Drive in Ben Lomond, CA also includes a small retaining wall, an enclosed pump station, and
    storm water drainage. Echo Tank Site, off Echo Lane in Boulder Creek, CA also includes large
    retaining walls with tie-backs and storm water drainage. Contract time is 300 days.
    3. IRWM Pump Station Fire Hardening Project includes removal of the existing roof structures and
    coverings of five pump stations, and construction of new fire-resistant roof structures and
    coverings for each of the five pump stations, which are located across Boulder Creek, CA and Ben
    Lomond, CA. Contract time is 270 days.
    II. PROJECT SCOPE OF SERVICES
    The District is soliciting quotes for labor compliance and certified payroll monitoring services for the
    above projects. Note that there will be construction overlap between the projects, which are all expected
    to begin around February April of 2026 and are all required to be completed by the end of 2026 or
    earlier. While weekly progress meetings will not overlap, consultant shall have adequate staffing to
    handle compliance and submittals from multiple projects and multiple construction contractors.
    Deliverables for this project include the following:
    1. Review Contractor’s Certified Payroll Submittals for adherence to prevailing wage and relevant
    DIR regulations;
    2. Attendance (in person or via phone) at weekly progress meetings;
    3. Coordinate with Contractors to ensure compliance with public works labor laws.
    The Consultant shall provide internal quality control and quality assurance procedures. Any
    subconsultants employed by the Consultant shall be managed by the Consultant.
    Note that the Consultant shall adhere to all conditions and requirements of the California Department
    of Water Resources and IRWM Grant, which are included as Exhibit B of the Draft Professional Services
    Agreement.
    2026 Grant Projects CPM RFQ
    III. COMPENSATION SCHEDULE
    The Compensation Schedule shall include, for each project:
    - An initiation fee ($) to cover project/account setup and attendance at the pre-construction
    meeting
    - A monthly service rate ($/month), to perform all deliverables described in the Scope of Services
    Please also include a total estimate including the initiation fees for each project and monthly service
    rates based on the following estimated number of construction months:
    - DWR Highland Tank Replacement: Estimated 6 months of construction
    - DWR Redwood Park and Echo Tank Replacement: Estimated 8 months of construction
    - IRWM Pump Station Fire Hardening: Estimated 4 months of construction
    Consultant shall be compensated the initiation fee plus the service rate based on the actual number of
    construction months for each project.
    IV. ATTACHMENTS
    1. DWR Highland Tank Replacement Planset
    2. DWR Redwood Park Tank Replacement 90% Planset
    3. DWR Echo Tank Replacement 90% Planset
    4. IRWM Pump Station Fire Hardening Planset
    5. Draft Professional Services Agreement
    V. DISTRICT CONTACT/SUBMITTAL REQUIREMENTS
    1. Questions regarding this RFP should be submitted to the District’s Engineering Manager, Garrett
    Roffe, via email at GRoffe@slvwd.com by 5:00 p.m. on Wed. November 19, 2025. Responses to
    these questions will be uploaded to the District website by no later than Fri. November 21, 2025.
    2. Submit one electronic copy of the proposal in PDF format via email to GRoffe@SLVWD.com. The
    proposal shall be signed by an individual, partner, officer or officers authorized to execute legal
    documents on behalf of the Firm.
    3. Proposals to include the following:
    A. Compensation Schedule, as described in section III.
    B. No fewer than two Professional References including both phone numbers and emails.
    4. Proposals must be received no later than 3:00 p.m. local time, on or before Fri. December 5,
    2025.
    Failure to comply with the requirements of this RFP may result in disqualification.
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...3CA07884 - Diesel Fire Pump Repair and Annual Services - RRUDetails Event ID ...

    State Government of California

    Bid Due: 6/05/2026

    ...vehicles - Fire fighting pump truck 25101705 Safety & rescue vehicles - Fire ...

    State Government of California

    Bid Due: 6/10/2026

    ...for constructing a new four-bedroom, two bay fire station, storage building, pump building, ...

    State Government of California

    Bid Due: 8/11/2026

    ...Project ID: 25-110-RFP Title: Bryte Sewer Pump Station Rehabilitation Addenda: 0 Release Date: ...

    City of West Sacramento

    Bid Due: 6/11/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.