SW District, Proposal for the Construction of Cole Camp Special Road District Bridge #14600051 BRO-R008(17) Replacement

Location: Missouri
Posted: Dec 4, 2025
Due: Dec 11, 2025
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW SW District, Proposal for the Construction of Cole Camp Special Road District Bridge #14600051 BRO-R008(17) Replacement 11/20/25 12/11/25
Addendum 1 SW District, Proposal for the Construction of Cole Camp Special Road District Bridge #14600051 BRO-R008(17) Replacement Addendum 1 12/4/25 12/11/25

Attachment Preview

INVITATION TO BID
LANGE RD. BRIDGE #14600051 OVER COLE
CAMP CREEK
Sealed bids for the Proposal for the Construction of Cole Camp Special Road District Bridge #14600051
BRO-R008(17) Replacement will be received at: Cole Camp Special Road District, PO Box 436, Cole
Camp, MO 65325, until 10:00 A.M. (prevailing local time) on the 11th day of December, 2025, at the Cole
Camp City Hall, 401 W Main St., Cole Camp, MO 65325, and at that time will be publicly opened and read.
All bids shall be submitted as a Hard Copy.
The proposed work includes:
The existing bridge will be removed and replaced with a 55-foot precast concrete slab beam bridge with
minor roadway work, guardrail, riprap, and permanent erosion control will be installed along with any other
incidental work in accordance with plans and specifications.
A digital copy of the plans and specifications may be purchased through the office of Great River
Engineering (GRE), at 417-886-7171 upon payment of $75.00, which is not refundable. All bidders must
purchase plans through Great River Engineering and be on the planholder list in order to bid the project.
This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required
to execute the contract as determined by the Missouri Department of Labor and Industrial Relations, and
requires adherence to a schedule of minimum wages as determined by the United States Department of
Labor. For work performed anywhere on this project, the contractor and the contractor’s subcontractors
shall pay the higher of these two applicable wage rates. The applicable state wage rates for this contract
are detailed in “Annual Wage Order 32”, that is attached to this bidding document. The applicable federal
wage rates for this contract are the effective Davis-Bacon federal wage rates posted the tenth day before
the bid opening date and can be found at: https://sam.gov/content/wage-determinations. These
supplemental bidding documents have important legal consequences. It shall be conclusively presumed
that they are in the bidder's possession, and they have been reviewed and used by the bidder in the
preparation of any bid submitted on this project.
The Cole Camp Special Road District hereby notifies all bidders that it will affirmatively ensure that in any
contract entered into pursuant to this advertisement, businesses owned and controlled by socially and
economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this
invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age,
ancestry, or national origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the current version of the
Missouri Standard Specifications for Highway Construction. The contractor questionnaire must be on file 7
days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works projects shall provide a
10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and
Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on
the construction project.
A certified cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
The Cole Camp Special Road District reserves the right to reject any or all bids.
The project will be awarded to the lowest, responsive, responsible bidder.
The DBE Goal for this project is 0%.
No 2nd tier subcontracting will be allowed on this project.
COLE CAMP SPECIAL ROAD DISTRICT
BRO-R008(17)
INVITATION TO BID
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Title Open Closes Bid Number CONTRACT- Construction Equipment Parts (OEM) 04/15/2026 06/16/2026 2026BID000159...

City of St. Louis

Bid Due: 6/16/2026

...Follow LCAAP Contaminated Waste Plant Construction Active Contract Opportunity Notice ID...: Y1PD - ...

DEPT OF DEFENSE

Bid Due: 6/18/2026

...Follow LCAAP Contaminated Waste Plant Construction Active Contract Opportunity Notice ID...: Y1PD - ...

DEPT OF DEFENSE

Bid Due: 6/18/2026

...Follow Construction of B-21 Radio Frequency (RF) Hangar Active Contract Opportunity Notice ID... ...

DEPT OF DEFENSE

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.