Deferred Maintenance FY2021-22 - NRB Addendum 1

Location: California
Posted: Jun 23, 2026
Due: Jul 21, 2026
Agency: UCLA Capital Programs
Type of Government: State & Local
Category:
  • 10 - Weapons
Solicitation No: 942418.01
Publication URL: To access bid details, please log in.
Project Name Deferred Maintenance FY2021-22 - NRB (opens in new tab, PDF)
Project Number 942418.01
Project Description Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract from prequalified bidders are invited for the following work:

This project will replace the obsolete Building Automation Controls and bladder-actuated Variable Air Volume (VAV) boxes in the Neuroscience Research Building (NRB), as identified by an Integrated Capital Asset Management Program (ICAMP) facility condition assessment. The replacements would increase overall building efficiency, reduce future maintenance costs, and bring the systems into compliance with current building codes. The NRB is a six-story facility, including a basement, totaling 130,887 gsf (80,259 asf), constructed in 2004. The building houses a vivarium, as well as wet and dry labs designed to accommodate a wide range of research needs for the Department of Neurobiology and the Brain Research Institute, focusing on how the brain develops, functions, and is affected by disease. The proposed scope of work includes renovating the existing lab spaces with updated air valves for air supply and exhaust, re-adjusting deferred maintenance items related to airflow levels, reconnecting the valves to the existing control system, and testing and balancing for the air and water systems. No modifications would be made to the existing life safety, smoke control, or fire alarm sequencing, control devices, or signals. Any additional control architecture and devices added in parallel would support only non-critical equipment and operations. Hazardous materials abatement shall be required in survey identified areas containing lead paint if areas disturbed. The estimated construction cost is $6,105,294.

TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM
Estimated Construction Cost $6,105,294.00
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project ID: Title: Household Hazardous Waste Facility Operations Addenda: 0 Release Date: 7/17.../2026 ...

City of Thousand Oaks

Bid Due: 8/19/2026

...Project Summary Project ID: BRC0000657 Project Name: Non-Emergency Removal of Hazardous Material... not ...

La County

Bid Due: 7/27/2026

...Solicitation Number: BRC0000657 Title: On-Call Nonemergency Removal of Hazardous Material... Department: Public Works ...

County of Los Angeles

Bid Due: 7/27/2026

...Solicitation Number: DBH88 Title: AS-NEEDED HAZARDOUS WASTE REMOVAL SERVICES - RFSQ Department...: Beaches ...

Los Angeles County

Bid Due: 7/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.