BQK ARFF & Fire Station 5 Replacement

Location: Georgia
Posted: Mar 5, 2025
Due: May 1, 2025
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: PE-33054-NONST-2025-000000005
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-33054-NONST-2025-000000005 BQK ARFF & Fire Station 5 Replacement Glynn County Airport Commission
Mar 05, 2025 @ 01:39 PM
May 01, 2025 @ 02:00 PM
BQK ARFF & Fire Station 5 Replacement

Start Date: Mar 05, 2025 @ 01:39 PM ET

End Date:
May 01, 2025 @ 02:00 PM ET

Event ID: PE-33054-NONST-2025-000000005
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: county
Fiscal Year: 2025
Agency Site: Link


Description


Sealed bids will be received by the Glynn County Airport Commission, until 2:00 P.M. local time, 01 May 2025 at which time they shall be opened in the 2nd Floor Conference Room, Glynn County Airport Commission, Brunswick Golden Isles Airport, 295 Aviation Parkway, Suite 205, Brunswick, Georgia 31525-6804, for:

BRUNSWICK GOLDEN ISLES AIRPORT
BQK ARFF & FIRE STATION 5 REPLACEMENT

SCOPE OF WORK: A new one-story Airport Rescue Firefighting Facility (ARFF) will be constructed to support the operations and staff of the Glynn County Fire Rescue (GCFR). This facility will encompass approximately 8,781 square feet. It features three apparatus bays, with a bid additive alternate design for a fourth bay. The masonry and steel framed building will have a stucco finish on concrete masonry units (CMU) and a 4-foot precast concrete veneer panel wainscot on the front façade. Both the main building and apparatus bays will have a low-slope insulated TPO roof with an internal drainage system. The main entrance will feature a tower element with a metal Spanish tile panel roof, reminiscent of the existing ARFF facility and the portico at the terminal building. All exterior windows and storefront systems will use insulated, laminated impact-resistant glazing within extruded aluminum frames. Impact-resistant drywall will be used in common and high-traffic areas to ensure durability. Epoxy flooring in the apparatus bays. The building will be fully sprinkered, with HVAC and with diesel emergency generator.
The site will include paving and parking.

A PRE-BID CONFERENCE for this project will be held on 27 March 2025 at 2:00 P.M. (local time) at the 2nd Floor Conference Room, Glynn County Airport Commission, Brunswick Golden Isles Airport, 295 Aviation Parkway, Suite 205, Brunswick, Georgia 31525-6804. This conference will include information that is essential for all bidders to understand. Therefore, ALL BIDDERS ARE STRONGLY ENCOURAGED TO ATTEND the pre-bid conference.

NIGP Codes
Code Description
90924 Building Construction, Commercial and Institutional
BuyerContact:

Shawna Williams
swilliams@flygcairports.com

912 265 2070 ext. 114

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.