VILLAGE OF PARK FOREST
ITEM
NO.
DESCRIPTION
1 HMA Surface Removal-Milling (2.0")
2 Bituminous Materials (Tack Coat)
3 HMA Surface Course,
Mix D, N50. (2.0")
4 Striping (Paint), 4" Yellow
5 Striping (Paint), Letters and Symbols Yellow
6 Water Valve Box Adjustment
7 MH Frame Adjustments
8 Inlet Protection
9 Traffic Control and Protection
ITEM
NO.
DESCRIPTION
1 HMA Surface Removal-Milling (2.0")
2 Bituminous Materials (Prime Coat)
3 HMA Surface Course,
Mix D, N50. (2.0")
4 Striping (Paint), 4" Yellow
5 Striping (Paint), Letters and Symbols Yellow
6 Water Valve Box Adjustment
7 MH Frame Adjustments
8 Inlet Protection
9 Traffic Control and Protection
ENGINEER'S
ESTIMATED
QUANTITY
Engineers Estimate
UNIT
PRICE
EXTENDED
AMOUNT
12,850 S.Y.
6,000 LBS
$3.50
$0.10
$44,975.00
$600.00
TABULATION OF BIDS
Advantage Paving
UNIT
PRICE
EXTENDED
AMOUNT
$1.95
$0.01
$25,057.50
$60.00
K Five
UNIT
PRICE
EXTENDED
AMOUNT
$4.05
$0.01
$52,042.50
$60.00
N.D.T. PARKING LOT RESURFACING
Gallagher
Dale, Inc.
UNIT
PRICE
EXTENDED
AMOUNT
UNIT
PRICE
EXTENDED
AMOUNT
$2.85
$0.01
$36,622.50
$60.00
$11.50
$1.50
$147,775.00
$9,000.00
1,500 TON
$90.00
$135,000.00
10,000 FT.
$0.50
$5,000.00
120 S.F.
$10.00
$1,200.00
5 Each $500.00
$2,500.00
10 Each $500.00
$5,000.00
10 Each $100.00
$1,000.00
1 L.S.
ENGINEER'S
ESTIMATED
QUANTITY
$2,000.00
$2,000.00
TOTAL $ $197,275.00
M/ J Asphalt
UNIT
PRICE
EXTENDED
AMOUNT
12,850 S.Y.
6,000 LBS
$2.35
$0.01
$30,197.50
$60.00
$102.85
$154,275.00
$0.90
$9,000.00
$24.25
$2,910.00
$56.00
$280.00
$40.00
$400.00
$0.01
$0.10
$17.40
$17.40
TOTAL $ $192,000.00
Everlast Blacktop
UNIT
PRICE
EXTENDED
AMOUNT
$2.69
$0.55
$34,566.50
$3,300.00
$87.00
$130,500.00
$84.50
$126,750.00
$0.70
$7,000.00
$0.75
$7,500.00
$8.10
$972.00
$2.15
$258.00
$685.00
$3,425.00
$195.00
$975.00
$1,350.00
$13,500.00
$300.00
$3,000.00
$250.00
$2,500.00
$45.00
$450.00
$6,000.00
$6,000.00
$9,250.00
$9,250.00
TOTAL $ $215,999.50
TOTAL $ $184,865.50
"D" Construction McGill Construction
UNIT
PRICE
EXTENDED
AMOUNT
UNIT
PRICE
EXTENDED
AMOUNT
$2.10
$0.01
$26,985.00
$60.00
$2.45
$0.01
$31,482.50
$60.00
$110.00
$165,000.00
$0.50
$5,000.00
$9.00
$1,080.00
$750.00
$3,750.00
$750.00
$7,500.00
$495.00
$4,950.00
$2,500.00
$2,500.00
TOTAL $ $346,555.00
Iroquois Paving
UNIT
PRICE
EXTENDED
AMOUNT
$2.90
$0.01
$37,265.00
$60.00
1,500 TON
$96.00
$144,000.00
10,000 FT.
$0.35
$3,500.00
120 S.F.
$13.00
$1,560.00
5 Each $380.00
$1,900.00
10 Each $750.00
$7,500.00
10 Each $150.00
$1,500.00
1 L.S. $4,350.00
$4,350.00
TOTAL $ $194,567.50
$106.37
$159,555.00
$0.80
$8,000.00
$9.20
$1,104.00
$519.54
$2,597.70
$491.50
$4,915.00
$125.00
$1,250.00
$5,000.23
$5,000.23
TOTAL $ $220,288.43
$88.00
$132,000.00
$1.28
$12,800.00
$50.60
$6,072.00
$300.00
$1,500.00
$900.00
$9,000.00
$200.00
$2,000.00
$4,700.00
$4,700.00
TOTAL $ $195,117.00
$94.50
$141,750.00
$0.50
$5,000.00
$8.50
$1,020.00
$250.00
$1,250.00
$550.00
$5,500.00
$60.00
$600.00
$1,850.00
$1,850.00
TOTAL $ $188,512.50
$85.50
$128,250.00
$0.80
$8,000.00
$5.15
$618.00
$285.00
$1,425.00
$395.00
$3,950.00
$0.01
$0.10
$2,250.00
$2,250.00
TOTAL $ $181,818.10
2
VILLAGE OF PARK FOREST
ITEM
NO.
DESCRIPTION
1 HMA Surface Removal-Milling (2.0")
2 Bituminous Materials (Prime Coat)
3 HMA Surface Course,
Mix D, N50. (2.0")
4 Striping (Paint), 4" Yellow
5 Striping (Paint), Letters and Symbols Yellow
6 Water Valve Box Adjustment
7 MH Frame Adjustments
8 Inlet Protection
9 Traffic Control and Protection
ENGINEER'S
ESTIMATED
QUANTITY
TABULATION OF BIDS
Murphy Construction Maneval Construction
UNIT
PRICE
EXTENDED
AMOUNT
UNIT
PRICE
EXTENDED
AMOUNT
12,850 S.Y.
$2.70
$34,695.00
$1.00
$12,850.00
6,000 LBS
$0.01
$60.00
$0.01
$60.00
1,500 TON
$96.50
$144,750.00
10,000 FT.
$0.32
$3,200.00
120 S.F.
$5.00
$600.00
5 Each $900.00
$4,500.00
10 Each $1,200.00
$12,000.00
10 Each $200.00
$2,000.00
1 L.S. $1,600.00
$1,600.00
TOTAL $ $203,405.00
$110.00
$165,000.00
$0.57
$5,700.00
$5.25
$630.00
$1.00
$5.00
$1.00
$10.00
$1.00
$10.00
$1.00
$1.00
TOTAL $ $184,266.00
N.D.T. PARKING LOT RESURFACING
2