| Location: | North Carolina |
|---|---|
| Posted: | Jan 15, 2025 |
| Due: | Feb 7, 2025 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC - Chapel Hill Academic Affairs | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://facilities.unc.edu/resources/vendor-opportunities/ | |||||
| Project Name | 1700 MLK Jr. - RTU HVAC Replacement | |||||
| Type of Services | Engineering/Architectural | |||||
| Project Manager | Joe Ockert | |||||
| Phone Number | (919) 244-3155 | |||||
| Contact Email | joe.ockert@fac.unc.edu | |||||
| Closing Date | 02/07/2025 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
1700 Martin Luther King Jr. Blvd is a medical research building. The building is served by a roof top unit that was placed into service during 1998. It is an air-cooled Trane packaged Air Handler unit and is rated for 130 Tons cooling, 190KW heat and has two 30HP supply fans and one 20HP return fan. This project will require that the screened-in roofed enclosure be removed to allow for the demolition, removal and installation of the new packaged unit on the roof. The screened-in roof enclosure will then need to be re-installed. Pre-proposal Meeting on 1/23/2025 at 1 pm via ZOOM link below. https://unc.zoom.us/j/91223048167 Meeting ID: 912 2304 8167
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
Contact: Joe Ockert, RA UNC-CH Facilities Plnning & Design Giles F. Horney Building 103 Airport Drive - 2nd Floor Chapel Hill, NC 27599
|

With GovernmentContracts, you can: