| Location: | Missouri |
|---|---|
| Posted: | Apr 25, 2025 |
| Due: | May 5, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z0852512899 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
STATEMENT OF WORK (SOW)
FOR
USCGC CHEYENNE Renew Fire Alarm Panel and System Components
CHEYENNE has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
The 75’ WLR asset, USCGC CHEYENNE’s current Notifier AFP 200 Fire is obsolete and needs to be upgraded to the Notifier AFP 320 system.
The scope of this contract is defined by the efforts and tools required to support USCGC CHEYENNE (WLR-75405). The Contractor shall provide all labor, materials, and tools necessary to renew all system components outlined below.
The goal is to upgrade CGC CHEYENNE’s fire alarm system to the NOTIFIER AFP 320, upgrade/renew all other system components, and restore the system zones to designed configuration.
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements
Coast Guard Drawing 75C-WAGL_6504_25_1_-_A, Fire/Flood Alarm System Eqpt Location & Wiring Diagram With Barge
Unless otherwise stated, this contract applies to on-site support for USCGC CHEYENNE (WLR- 75405) in St. Louis, MO.
2.1 RENEW NOTIFIER FIRE ALARM SYSTEM
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
NOTE
Although some components may be compatible with both the NOTIFIER AFP 200 and 320 systems; the contractor shall renew all components regardless of condition or compatibility except existing wiring that is deemed satisfactory by the contractor.
2.2 FIRE ALARM SYSTEM TEST
The Contractor shall ensure all system components identified in section 2.1 have been renewed by preforming a walkthrough of all spaces with the Engineer Petty Officer (EPO) or the EPO’s designated representative.
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.1 PERIOD of Performance
The period of performance for this contract shall be June-1st – 14th, 2025.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC CHEYENNE at 100 Arsenal Street St Louis, MO 63118 unless an alternate location is approved by the Coast Guard.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations.
4.4 TRAVEL
Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government.
5.0 GOVERNMENT FURNISHED RESOURCES
None.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office.
| May 8, 2025 | [Combined Synopsis/Solicitation (Updated)] CGC CHEYENNCE - Fire Alarm Panel Upgrade |

With GovernmentContracts, you can: